DRAFT PWS - Rectifier Modification.pdf
PDF 1 MB Posted
- Attached to
- Rectifier Unit Modification Services Federal contract opportunity
- Solicitation number
- N32253-20-Q-0066
About this file
This performance work statement outlines repair and modification services required for a rectifier unit at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility. An original equipment manufacturer trained technician will troubleshoot, repair, modify, and test the Rectifier Unit Model 12DC-3000-365-480-TF to fully operational condition per current guidelines. Services include correcting stability issues, installing warning circuits and meters, modifying controls, and revising technical manuals. The contractor must perform load testing, provide a parts list, and warrant work for one year. Delivery and destination acceptance testing will be at Pearl Harbor.
The related sources sought notice seeks capability statements from interested contractors to repair this rectifier unit for Pearl Harbor Naval Shipyard. The applicable NAICS is 811219 and PSC is J049. Interested parties should provide organization details, a capability statement, and recommended contract vehicle. This is not a request for proposal or quotes but a market research notice.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Performance Work Statement (PWS)
Pearl Harbor Naval Shipyard
And Intermediate Maintenance Facility
Rectifier Unit, Model #12DC-3000-365-480-TF
Modification Services
1. BACKGROUND:
1.1. Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a
US Navy regional industrial center that maintains, overhauls, and repairs various vessels of the US Navy. Its industrial operations provide the US Naval forces with a wide range of services and resources located on the island of Oahu, Hawaii, with direct and indirect support to SSN 688 and 774 class submarines, surface vessels, and shore based activities in the Pacific.
2. OBJECTIVE & SCOPE:
2.1. PHNSY & IMF seeks a Contractor to provide repair and modification of the Rectifier
Unit, Model #12DC-3000-365-480-TF, to a fully operational condition, in accordance with performance requirement specifications.
3. PERFORMANCE REQUIREMENTS:
3.1. The Contractor shall supply and authorize, an Original Equipment Manufacturer (OEM), Trained Technician and not a subcontract technician, to perform all the following services:
3.2. Modification: The Contractor shall provide all management, labor, tools, materials, supplies, equipment and transportation to troubleshoot, repair, modify, and test Rectifier
Unit, Model #12DC-3000-365-480-TF, in accordance with current OEM guidelines, at the Contractor’s facility. After required modifications are completed at the Contractor’s facility, the Contractor, prior to shipping shall:
3.2.1. A. Complete a Full Uninterrupted Satisfactory Load Test in accordance with DC
Rectifier PHNSY Load Table below.
3.2.2. B. Test functionality of all modifications specified.
3.2.3. C. Perform a comprehensive visual inspection of major internal and external components, to establish a base-line condition.
These requirements shall be captured by an “At Origin” Test Procedure Document that will be developed by the Contractor and reviewed and approved by PHNSY & IMF prior to execution. This document must be completed, dated, and signed prior to shipping, to certify that all performance criteria identified in A-C, above, was met. After the unit is shipped, these same tests, A-C will be repeated and documented at PHNSY & IMF and will serve as the “At Destination”, certification and acceptance. The contractor at no cost to the Government is responsible to repair areas identified that does not meet A-C above. “At Destination” testing, all support equipment, AC Shore power, AC and DC cabling and DC load banks shall be provided by Pearl Harbor Naval Shipyard & IMF.
The Modifications required are detailed below:
3.2.4. Rectifier must be able to pass load testing per “DC Rectifier PHNSY Load Table” below, especially at 210VDC. The rectifier must be able to perform a continuously uninterrupted run (1-8) at 210VDC, 270VDC and 355VDC voltages without shutting down unexpectedly. If the vendor cannot achieve 4 hour hold at 210VDC, 2800ADC, then run test for 1 hour.
DC Rectifier PHNSY Load Table
RUN NO. 1 2 3 4 5 6 7 8
Hours
Duration 2 1 1 1 1 1 1 4
% Load
25 35 45 55 65 75 85 100
DC Amps @
210 VDC
*2800
270 VDC
355 VDC
ALL DC AMPS MUST BE MET WITHIN +/- 10% OF STATED VALUE/RANGE.
*If 4 hour hold test cannot be achieved, then 1 hour hold test will be acceptable.
3.2.5. Correct stability problem to achieve 3 seconds or less voltage recovery when going from fully loaded to fully unloaded, eliminating voltage spiking effect; currently, when going from the loaded to fully unloaded state, DC voltages will spike to a higher value then takes > 10 seconds to return to original value.
3.2.6. Install visual indication warning circuit for Over temperature (OT), and Over current (OC). Prior to regulator shutting down, due to either fault, OT warning shall monitor all power magnetic components (XFMR1, IPT, L1 and SCRS). OC warning circuit will monitor the DC output bus. Both warning (OT/OC) indications shall be adjustable within a range not detrimental to affect rectifier performance.
These features provide operator the ability to adjust DC load during operation to prevent unnecessary shut down of rectifier. In the event a shutdown occurs, a visual indication shall provide user a root cause of the fault (OC/OT).
3.2.7. Install Digital DC Voltmeter vice analog. If this cannot be accomplished due to degradation of insulation resistance, install test points where the user can install an external voltmeter in conjunction with its existing analog voltmeter.
3.2.8. Install remote controller with minimum length, 50 ft. cable with connector ends
(not hard-wired). Install remote controller to allow Opening/Closing of input and output breakers, adjustment of DC output voltage and to be able to view DC voltage, and current, remotely. Also installed with indication lights, for warnings and faults of (OT/OC).
3.2.9. Install NEMA 4X rated Weather resistant cover for control panel. This is to prevent rain and seawater mist from getting inside the DC rectifier. Area of protection includes front portion where indicator lights and control knobs reside.
3.2.10. Modify space heaters/control circuit to be user controlled (manual). Install manually switchable space heaters to reduce moisture caused by rain and harsh weather conditions. Space heater shall de-energize when DC rectifier output breaker closes via interlocked circuit.
3.2.11. After all modifications are performed the DC rectifier cannot change the following behaviors from its original design:
3.2.11.1. The DC rectifier must be able to withstand starting surges up to 3500ADC for at most 2s at 270VDC without shutting down the DC Rectifier. This was proven to be satisfactory for Type 2 in the DC rectifier’s original state.
Starting surge specifics:
Type 1: L1-2200A (decays to 1200A in 1s), M1-2500A (decays to 1500A in
1s), M2-2900A (decays to 100A to 2s).
Type 2:2000A (decays to 1300A in 1s), 2600A (decays to 1500A in 1s), 2100A decays to 700A in 3S, 1100A (decays to 150A in 1s).
3.2.11.2. The DC rectifier insulation resistance must still be greater than or equal to
50 Megohms. The combined insulation resistance to ground shall be 50
Megohms or greater without temperature correction. Insulation resistance shall be measured by manually closing the DC output breaker then jumpering
+ and – output busses together and measuring insulation resistance from + or – to chassis frame ground (FG) using a 500V megger.
3.2.11.3. Output ripple shall be no greater than 5% RMS @ Full load @ 210, 270, 355VDC.
3.2.11.4. When increasing/decreasing loading of DC rectifier, the DC voltage regulation must be maintained per original specifications. Currently DC voltages does not vary more than 0.5% from load changes (except when unloading fully).
3.2.12. Transformer weight addition, Center of mass, lifting and handling must be clearly defined prior to start of rectifier modification. Vendor will provide weight changes, and new center of mass and report any lifting and handling changes.
3.2.13. Revise the current Technical Manual to incorporate new modifications.
3.3. Reports: The Contractor shall provide an “At Origin” Test Procedure Document that includes a completed, Full, Uninterrupted Satisfactory Load Test in accordance with DC
Rectifier PHNSY Load Table, Test Functionality results of all specified modifications, and a Comprehensive Visual Inspection of major internal and external components, to establish a base-line condition. The document must be reviewed and approved by
PHNSY & IMF, prior to execution.
This document must be completed, dated, and signed prior to shipping, to certify that all performance criteria identified above, was met. After the unit is shipped, the same tests will be repeated and documented at PHNSY & IMF and will serve as the “At
Destination”, certification and acceptance. The contractor is responsible to repair areas identified that does not meet the requirements of the test procedure document. “At
Destination” testing, all support equipment, AC Shore power, AC and DC cabling and
DC load banks shall be provided by Pearl Harbor Naval Shipyard & IMF.
3.4. Parts: Contractor shall provide a comprehensive list of all replacement parts required to repair and modify the Rectifier Unit, Model #12DC-3000-365-480-TF, to include manufacturer part numbers and prices within 5 business days after modification is completed. The parts supplied, shall be new and not refurbished or reconditioned materials.
3.5. Warranties: Extend to the Government, all commercial warranties on replacement parts, consistent with standard industry practices (See PWS 4.5.).
3.6. Service Delivery Summary:
Performance Requirement PWS Paragraph Performance Threshold
1. Provide repair and modification of the Rectifier Unit.
2.1. 100% delivery and compliance
2. Provide a Manufacturer Trained
Technician.
3.1. 100% delivery and compliance
3. Perform repair, modification and field load testing.
3.2. 100% delivery and compliance
4. Provide parts. 3.4. 100% delivery and compliance
5. Provide warranties. 3.5. 100% delivery and compliance
4. QUALITY ASSURANCE:
4.1. Design/Build conference calls: The Contractor’s engineering department shall hold monthly Design/Build conference call meetings with Pearl Harbor Naval Shipyard
Representative once DC rectifier work begins, to update the modification progress, and address any concerns as required.
4.2. Testing: The Contractor shall perform all load test certifications and modification validation testing as specified in Section 3.2 of this Performance Work Statement
(PWS), at the Contractor’s facility.
4.3. Origin Inspection (Optional): In the event test results are not satisfactory to the government’s satisfaction IAW, 3.2, of this PWS, a government representatives shall travel to contractor’s facility to inspect testing of the unit. Intent of origin inspection is to provide reasonable assurance that the unit is properly functioning within specification.
4.3.1. Contractor is to allow representatives from PHNSY & IMF into Contractors work area to witness and document operation of the equipment. Demonstration will prove that the load test performs, in accordance to specifications in Section 3.2.
4.3.2. If the results of the origin inspection meet reference requirements contained in
Section 3.2. of this PWS, Contractor shall be authorized to transport the unit to
PHNSY & IMF & IMF.
4.3.3. If the results of the origin inspection does not meet reference requirements contained in Section 3.2. of this PWS, the Contractor shall be responsible for all rework and shall re-perform the inspection/test at no additional cost to the government.
4.3.4. Inspection at origin shall exclude items/equipment not directly related to demonstrating the load testing results and proper functioning of the unit with modifications installed.
4.4. Delivery to Pearl Harbor: The Contractor is responsible for the transportation of the unit from the Manufacturers site to PHNSY & IMF.
4.4.1. Upon arrival and receipt of the unit, an inspection will be conducted by PHNSY &
IMF personnel. If any discrepancies IAW requirements, in Section 3.2. of this PWS are found, Contractor is responsible to fix discrepancies at no cost to the government.
4.4.2. Contractor shall contact the PHNSY&IMF Project Manager for an eight character
“Document Number”, to be prominently displayed on the package, to allow
PHNSY&IMFs material receiving department to process incoming material.
Packages without the “Document Number”, may not arrive at the destination point.
4.5. The Contractor shall be responsible for maintaining and implementing a Quality Control
Plan (QCP), to ensure that the work performed meets or exceeds the requirement of this
PWS, and results in the prevention of potential and correction of actual problems.
The QCP shall address what will be reviewed and shall outline any remedial actions warranted by the review. The QCP shall be implemented upon contract performance.
4.6. Warranty: The warranty is to last a period of one year after the date the government receives the unit. If any material or parts is repaired under warranty by the Contractor, that materials warranty is to last two years.
4.7. The Contractor shall maintain records of reviews and actions taken per the QCP, and shall make such records available to the government upon request.
5. GOVERNMENT FURNISHED PROPERTY:
5.1. The unit will be shipped to the Contractors facility, and once service and testing is completed and verified, the unit will be shipped back to PHNSY & IMF, all at the
Contractor’s expense (Return shipping address below):
5.1.1. DEPARTMENT OF THE NAVY
COMMANDER (Code 950: Attention: Brian Fujimoto)
PEARL HARBOR NAVAL SHIPYARD AND IMF
667FEGUARD ST STE 100
JBPHH HI 96860-5033 – OFFICIAL BUSINESS
6. CONTRACTOR QUALIFICATIONS:
6.1. The Contractor shall be an authorized, Original Equipment Manufacturer (OEM) trained, certified technician, not a sub-contract technician, to troubleshoot, repair, and perform modification service and testing on the Rectifier Unit, Model #12DC-3000-365-480-TF
20 x 36. S/N BL36565499.
6.2. In accordance with current Department of Defense and Homeland Security requirements, performance of all work under this contract is restricted to U.S. citizens and U.S.
nationals only. The Contractor shall provide proof of this requirement upon request by the government.
7. SECURITY REQUIREMENTS:
7.1. In accordance with current DoD and Homeland Security Requirements, performance of all work under this contract is restricted to U.S. citizens and U.S. nationals only.
8. CONTRACTOR PERSONNEL:
8.1 The Contractor shall furnish sufficient personnel to perform all work within this performance work statement. Contractor is required to comply with Public Law 105-270, Section 5(2) (A) of this Public Law defines the term “inherently governmental function” as
“a function that is so intimately related to the public interest as to require performance by
Federal Government employees.” Per Section 5(2) (B), inherently governmental functions include management of Governmental programs requiring value judgements, conduct of foreign relations, selection of program priorities, and the direction of intelligence and counter-intelligence operations. Per Section 5(2) (C), inherent governmental functions DO
NOT include. (i) Gathering information for providing advice, opinions, recommendations, or ideas to Federal Government officials; or (ii) any function that is primarily ministerial and internal in nature.
8.2 Contractor personnel shall not establish an employee-employer relationship with
Government personnel under this contract.
8.3 Contractor shall not provide personal services.
8.4 Contractor personnel will make clear to all individuals they engage with that they are
Contractor employees and not Government employees. When participating and introducing themselves during official events wherein Government, non-Government, or foreign personnel are present, Contractor personnel will identify themselves as employers of the
Contractor. Contractor personnel must be clearly identified (i.e., company shirt, pin, visible company ID, etc.) in a visible location as to who their employer is.
8.5 Contractor personnel shall not manage, supervise, or task Government employees or military personnel. Contractor personnel may not make any commitment to non-Government personnel, including a foreign official, which commits the expenditure of U.S. Government resources.
9. PERIOD OF PERFORMANCE:
9.1. All work to be completed twelve months after award of the contract. No option years are required.
10. PLACE OF PERFORMANCE:
10.1. All work and testing is to be performed at the Contractor’s worksite. All support services including, AC shore power, cabling, DC load banks will be provided by Pearl
Harbor Naval Shipyard & IMF for Destination testing only.
11. POINT OF CONTACT: Contracting Officer
12. ENTERPRISE –WIDE CONTRACTOR MANPOWER REPORTING APPLICATION:
12.1. The Contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the PHNSY & IMF
& IMF via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
12.1.1. W, Lease/Rental of Equipment;
12.1.2. X, Lease/Rental of Facilities;
12.1.3. Y, Construction of Structures and Facilities;
12.1.4. S, Utilities ONLY;
12.1.5. V, Freight and Shipping ONLY.
12.2. The Contractor is required to completely fill in all required data fields using the following web address: https://emcra.navy.mil.
12.3. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 through
September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractor may direct questions to the help desk, linked at https://emcra.navy.mil.
13. ATTACHMENTS: Attachments: A.
https://emcra.navy.mil/ https://emcra.navy.mil/
13.1. Attachment A – Government Furnished Property