DRAFT PWS - Lashing Straps.pdf
PDF 253 KB Posted
- Attached to
- Refurbish and Repair Lashing Strap Assemblies Federal contract opportunity
- Solicitation number
- N42158-21-Q-S020
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N42158-21-Q-S020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SCOPE:
1.1 Title: Weapons Handling; Torpedo Lashing Strap Assembly Repair
1.2 Location of Work:
1.2.1 In shop.
1.3 Identification:
1.3.1 (QTY 96), Torpedo Lashing Strap Assemblies (Assy. 98 of Reference 2.2).
2. REFERENCES:
2.1 NAVSEA DWG# 709-5549373 Rev M, SSN-688 Weapons Handling Equipment Test Loads/Methods and
Inspection Procedures
2.2 NAVSEA DWG# 5200393 Rev C, SSN-688 Class Submarine Weapons Stowage and Handling Torpedo Lashing Strap Assembly & Details
2.3 NAVSEA DWG# 6250296 Rev E, SSN-688 Class Submarine Weapon Handling and Stowage Equipment Repair Notes
2.4 TM SG420-BU-MMA-010 Rev 02 Weapons Shipping, Handling, and Stowage Equipment
3. REQUIREMENTS:
3.1 Contractor shall pickup (QTY 96) Torpedo Lashing Strap Assemblies, item 1.3.1, from NNSY.
3.2 Contractor shall overhaul and restore (QTY 96) Torpedo Lashing Strap Assemblies, item 1.3.1, IAW requirements of references 2.1 through 2.4.
3.2.1 Contractor shall discard and replace all software and mandatory material items IAW requirements of references 2.1 through 2.4.
3.2.2 Contractor shall repair/replace damaged components as required for satisfactory operation IAW references 2.1 through 2.4.
3.2.3 Contractor shall provide plating and plastisol coat to components as required by references 2.2 and 2.3.
3.3 Contractor shall perform operational test of all moving parts.
3.4 Contractor shall perform weight test certification of (QTY 96) Torpedo Lashing Strap Assemblies, item 1.3.1, IAW reference 2.1.
3.5 Contractor shall deliver (QTY 96), item 1.3.1 Torpedo Lashing Strap Assemblies with all Weight Test Certification documentation (i.e., QA-17W’s) to NNSY xxxxx to arrange delivery to NNSY.
4. NOTES:
4.1 Contractor shall use the specified revisions of all drawings and tech manuals. Use of the latest revision available is authorized for Submarine Maintenance Standards and SUBMEPP test procedures with approval from NNSY Code 292.
4.2 NNSY POC:
4.3 The Company Vendor will submit with invoice for payment, a Certificate of Compliance stating, work completed per requirements listed in paragraph 3 and signed by the above named NNSY POC or his designated representative certifying work completed by the Tech Rep.
4.4 PERIOD OF PERFORMANCE: The POP is March 1, 2021 through July 2, 2021. Equipment will need to be returned to NNSY no later than July 2, 2021 to support project schedule. The NNSY POC or his designated representative will “confirm” actual starting dates. The TECH REP. will check in with the NNSY POC “prior to and upon completion of work”.
File details come from the government source that posted it. Updated .