DD1423 - Counterfeit Prevention Plan.pdf

PDF 204 KB Posted

Attached to
PANEL, POWER DISTRIB Federal contract opportunity
Solicitation number
SPRHA5-24-Q-0216
Issued by
Defense Logistics Agency Aviation

About this file

This Contract Data Requirements List (CDRL) outlines requirements for a Counterfeit Prevention Plan (CPP) to be delivered under Solicitation Number SPRHA5-24-Q-0216 for Panel, Power Distrib issued by the Defense Logistics Agency Aviation. The contractor must submit the CPP no later than 30 calendar days after contract award, with the government providing comments within 14 days for the contractor to address in a resubmission no more than 7 days later. The CPP and associated documentation must include Distribution Statement D and export control markings. It will be sent via email to the 416th Supply Chain Management Squadron at Hill Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to PANEL, POWER DISTRIB, newest first.
File Type Posted
SPRHA524Q0216_______0004.pdf PDF
SPRHA524Q0216_______0003.pdf PDF
SPRHA524Q0216_______0002.pdf PDF
SPRHA524Q0216_______0001.pdf PDF
SPRHA524Q0216 - updated.pdf PDF
Engineering Data List.pdf PDF
Packaging Statement of Work.pdf PDF
Unmarked Eng Data 2022.pdf PDF
SPRHA524Q0216.pdf PDF
DD 1423 - FA Test Report.pdf PDF
Engineering Data Requirements.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

MISC

TDP TM OTHER

D. SYSTEM/ITEM

Power, Panel Dist

E. CONTRACT/PR NO.

FD2020-24-00216

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81832

5. CONTRACT REFERENCE

CLIN for Data

6. REQUIRING OFFICE

416 SCMS/GUEAA

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4: Contractor Format Acceptable.

2. Blocks 7, 8, 14: The contractor shall submit a Letter of Transmittal and send the Contractors Counterfeit Protection Plan (CPP) via e-mail to:

justin.allred.2@us.af.mil

3. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the Counterfeit prevention Plan (CPP) NLT thirty (30) calendar days after contract award. The Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. The contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments.

4. Block 9: Distribution Statement, Export Control Warning shall be IAW DoD Instruction 5230.24

The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.

DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical technology). (Nov 2023).

Other requests for this document must be referred to 416 SCMS/GUEAA, Hill

AFB, UT 84056-5826.

EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that determined to contain export-controlled technical data shall be marked with the following statement:

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

416 SCMS/ 1 1

GUEAA

6070 Gum LN Bldg. 1213 Hill AFB, UT 84056-5826

SEE BLK 16

15. TOTAL 1 1 0

G. PREPARED BY: (Contractor Data Manager) PINNEGAR.STEPH Digitally signed by

PINNEGAR.STEPHANIE.A.1102660737

ANIE.A.1102660737 Date: 2023.11.16 14:53:04 -07'00'

H. DATE

16 Nov 2023

I. APPROVED BY: (Engineer) ALLRED.JUSTIN.M. Digitally signed by

ALLRED.JUSTIN.M.1545519786

1545519786 Date: 2023.11.20 15:39:29 -07'00'

J. DATE

16 Nov 2023

File details come from the government source that posted it. Updated .