DARPA-BAA-16-37_Attachment_2_-_FP_Summary_Slides.pptx
PPTX presentation 443 KB Posted
- Attached to
- Intense and Compact Neutron Sources Phase Two (ICONS2) Federal contract opportunity
- Solicitation number
- DARPA-BAA-16-37
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DARPA-BAA-16-37_Attachment_4_Proposal_Template_-_Technical_ _Management_Volume.docx | DOCX document | |
| DARPA-BAA-16-37_Attachment_1_-_Abstract_ES_Slide.pptx | PPTX presentation | |
| DARPA-BAA-16-37.pdf | ||
| DARPA-BAA-16-37_Attachment_3_-_Milestone_Deliverable_Table.docx | DOCX document | |
| DARPA-BAA-16-37_Attachment_5_Proposal_Template_-_Cost_Volume.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Topic Area x: Title Organization; Name Add graphic Need and problem being addressed...
Goal…
New ideas Existing approaches Competition…
CONCEPT
Impact Context
APPROACH
Distribution Statement Organization Name-Concept Describe How It Works/Innovative Claims
Organization Name-Schedule Tasks/Deliverables/Milestones/Time-Table (e.g. Gantt Chart)
Organization Name-Cost Summary
| Phase 2 | |
| Phase Length(Months) | |
| Direct Labor ($) | |
| # of FTEs/year* (Researcher) | |
| # of FTEs/year* (Technician) | |
| # of FTEs/year* (Business) | |
| Indirect Costs/Overhead (as a percentage of direct labor) | |
| Materials and Equipment ($) | |
| Travel ($) | |
| Total Proposal Cost ($) |
*Please include the total number of FTEs/year working on the project including subcontractors.
Component Refinement Summary (All Proposals)
| Component Summary Matrix Table | ||||||
| Component Name | Metric(s) | Current Metric Value | End of Phase 2 Metric Value(s) | Measurement Method(s) | Highest Risk | Mitigation |
| Name* |
Integration Table: Isotropic Source (TA1 Only)
| Integration Table: Isotropic Source (TA1) | ||||||
| Metric | Specification | Proposed Value | Highest Risk | Mitigation | ||
| D-T Reaction Capable | Yes | |||||
| Rate (n/s/sr) | 1e10 | |||||
| SWaP (L/lbs/W) | 8 / 30 / 400 | |||||
| Spot Size (mm) | 2 | |||||
| Secondary (Desired) Objectives | ||||||
| Metric | Goal | Proposed Value | Notes: | |||
| Radiographic Thermal Neutrons | Yes | If applicable, describe expected yield as well as the collimator and moderation scheme. | ||||
| Radiographic X-rays | Yes | If applicable, state expected yield, spectrum, and angular emission. | ||||
| Pulsed Operation | Yes | If applicable, describe expected rise, fall times and duty cycle. |
Integration Table: Directional Source (TA2 Only)
| Integration Table: Directional Source (TA2) | ||||||
| Metric | Specification | Proposed Value | Highest Risk | Mitigation | ||
| D-D Reaction at 4 MeV | Yes | |||||
| Rate (n/s/sr @ 0 deg) | 2e10 | |||||
| SWaP (L/lbs/W) | 250 / 80 / 2000 | |||||
| Spot Size (mm) | 3 | |||||
| Secondary (Desired) Objectives | ||||||
| Metric | Goal | Proposed Value | Notes: | |||
| p-Li Reaction at 1.93 MeV | Yes | If applicable, briefly describe D-D to P-Li transition. | ||||
| Radiographic Thermal Neutrons | Yes | If applicable, describe expected yield as well as the collimator and moderation scheme. | ||||
| Radiographic X-rays | Yes | If applicable, state expected yield, spectrum, and angular emission. | ||||
| Pulsed Operation | Yes | If applicable, describe expected rise, fall times and duty cycle. |
image2.png image4.png