D2 Dental Prosthetics QASP - 36C26023Q0696.docx

DOCX document 25 KB Posted

Attached to
Dental Prosthetics Federal contract opportunity
Solicitation number
36C26023Q0696
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This document outlines a Quality Assurance Surveillance Plan (QASP) for dental prosthetics services. The QASP defines performance standards and acceptance levels for pickup and delivery timeliness, supplies and services, packaging, quality control, qualifications, and workmanship. It also describes surveillance methods including direct observation, inspections, validated complaints, and random sampling. Performance will be rated on a scale from exceptional to unsatisfactory. Unacceptable performance will be documented through Contract Discrepancy Reports requiring corrective action plans from the contractor. The QASP will be reviewed periodically for appropriateness.

The related federal contract opportunity is a solicitation for dental prosthetics services for the VA Southern Oregon Rehabilitation Center & Clinics. Pricing will be based on estimated quantities and this is a small business set-aside awarded by the Department of Veterans Affairs Veterans Health Administration VISN 20. The response and award dates are not specified.

View the file

Other files for this federal contract opportunity

Other files attached to Dental Prosthetics, newest first.
File Type Posted
36C26023Q0696.docx DOCX document
D1 Individual Price Schedule - 36C26023Q0696.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D.2 QASP

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO:

Organization or Agency: Department of Veterans Affairs

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR:

c. Other Key Government Personnel –Chief Quality Management
Compliance Officer
Privacy Officer
Auditor
Safety Specialist

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager -

b. Other Contractor Personnel -

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

Task
ID
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
Dental Service Action (Incentive)
Dental Laboratory Services
1
Pickup and Delivery Timeliness
Please reference “2. Pickup and Delivery Timeliness”, on page 5 of solicitation 36C26023Q0696 for standards.
99%
Marked on the Quality Evaluation sheet (measure by time-out and time-in from/to clinic)
Contractor will receive positive written report from COR
2
Supplies/Services
Please reference “3. Supplies/Services”, on page 6 of solicitation 36C26023Q0696 for standards.
99%
Validated user/customer complaints & Random sampling
Contractor will receive positive written report from COR
3
Packaging
Please reference “4. Packaging”, on page 7 of solicitation 36C26023Q0696 for standards.
100%
Validated user/customer complaints & Random sampling
Contractor will receive positive written report from COR
4
Quality Control
Please reference “5. Quality Control”, on page 7 of solicitation 36C26023Q0696 for standards.
95%
Validated user/customer complaints & Random sampling
Contractor will receive positive written report from COR
5
Qualifications
Please reference “6. Qualifications”, on page 7 of solicitation 36C26023Q0696 for standards.
100%
Validated user/customer complaints & Random sampling
Contractor will receive positive written report from COR
6
Quality/Workmanship
Please reference “7. Quality/Workmanship”, on page 7 of solicitation 36C26023Q0696 for standards.
95%
Validated user/customer complaints & Random sampling
Contractor will receive positive written report from COR

5. INCENTIVES

The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)

b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

d. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)

g. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.

8. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

EXCEPTIONAL:
Performance meets contractual requirements and exceeds many to the

Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.

VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.

SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.

MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of thecontractual deficiency (e.g,. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety orEnvironmental Deficiency Reports, or letters).

9. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the contractor and contracting officer. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager and contracting officer.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

10. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor on an as needed basis to assess performance and shall provide a written assessment.

<After award, both the contractor’s Program Manager and the COR shall sign this document.>

____________________________________________________
Signature – Contractor Program ManagerDate
____________________________________________________
Signature – Contracting Officer’s Technical RepresentativeDate

File details come from the government source that posted it. Updated .