CUTTYHUNK (WPB 110B) DD FQ3 JEB 21D1_TOC.pdf

PDF 92 KB Posted

Attached to
USCGC CUTTYHUNK (WPB-110B) DRYDOCK AVAILABILITY FY21 Federal contract opportunity
Solicitation number
70Z080-21-Q-P45CUTTYHUNK
Issued by
Department of Homeland Security US Coast Guard

About this file

This document outlines a solicitation for scheduled dry dock repairs on the USCGC CUTTYHUNK (WPB-110B). The solicitation number is 70Z080-21-Q-P45CUTTYHUNK and will be issued by the Department of Homeland Security US Coast Guard. The period of performance for the anticipated work is from 1 June 2021 to 12 October 2021. The scope of work includes 54 separate work items and covers a range of hull, mechanical, and electrical systems maintenance and repair needs such as hull plating inspection and preservation, shafting and propeller removal and inspection, tank cleaning and inspection, piping cleaning and replacement, and various component overhauls, renewals, and inspections.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC CUTTYHUNK (WPB-110B) DRYDOCK AVAILABILITY FY2021

ii (Draft-1)

TABLE OF CONTENTS

Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ................................................................................. xi Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics .............................................................................................................................. xv General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Hull Plating (U/W Body), Inspect WORK ITEM 3: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 4: Hull Plating Freeboard, Preserve “100%” WORK ITEM 5: Appendages (U/W), Leak Test WORK ITEM 6: Appendages (U/W) - Internal, Preserve WORK ITEM 7: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect WORK ITEM 8: Voids (Non-Accessible), Leak Test WORK ITEM 9: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 10: Tanks (MP Fuel Service), Clean and Inspect WORK ITEM 11: Tanks, Dirty Oil and Waste, Clean and Inspect WORK ITEM 12: Forward Void, Preserve WORK ITEM 13: Tanks (Dirty Oil), Preserve “100%” WORK ITEM 14: Tank (Oily Water), Preserve “100%” WORK ITEM 15: Main Mast, Preserve, 100% (Without ESU-C4IT) WORK ITEM 16: Propulsion Shafting, Remove, Inspect, And Reinstall WORK ITEM 17: Alignment Survey, Conduct WORK ITEM 18: Mechanical Shaft Seal Assemblies, Overhaul WORK ITEM 19: Propulsion Shaft Bearings (External), Renew WORK ITEM 20: Propulsion Shaft, Stern Tube Forward Bearing, Renew WORK ITEM 21: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 22: Propellers; Remove, Inspect, and Reinstall WORK ITEM 23: Exhaust Piping System, Inspect WORK ITEM 24: Heat Exchangers; Clean, Inspect And Hydro WORK ITEM 25: Ship Service Diesel Generator(s) (John Deere), Renew WORK ITEM 26: Fathometer Transducer, Renew WORK ITEM 27: Speed Doppler, Remove, Inspect, and Reinstall - Doppler Valve, Overhaul WORK ITEM 28: Sea Valves , Overhaul Or Renew WORK ITEM 29: Sea Strainers - (All Sizes), Overhaul WORK ITEM 30: Steering Gear (General), Overhaul WORK ITEM 31: Rudder Assembly, Remove, Inspect and Reinstall WORK ITEM 32: Fin Stabilizers (General), Overhaul WORK ITEM 33: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 34: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 35: Grey Water Piping, Clean And Flush WORK ITEM 36: Sewage Piping, Clean And Flush WORK ITEM 37: Tanks (Sewage Holding), Preserve “100%” WORK ITEM 38: Tanks (Grey Water Holding), Preserve “100%” WORK ITEM 39: Tanks (Potable Water), Preserve “100%” WORK ITEM 40: Battery Space, Preserve and Insulate WORK ITEM 41: Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) WORK ITEM 42: U/W Body, Preserve (100%) Used with Side Scan)

USCGC CUTTYHUNK (WPB-110B) DRYDOCK AVAILABILITY FY2021

iii (Draft-1)

WORK ITEM 43: Superstructure, Preserve “100%” WORK ITEM 44: Cathodic Protection System (Bilge and Sea Chest), Renew WORK ITEM 45: Impressed Current Cathodic Protection System, Inspect And Maintain WORK ITEM 46: Floating Deck System, Aft Berthing, Renew WORK ITEM 47: Drydock WORK ITEM 48: Temporary Services, Provide - Cutter WORK ITEM 49: Sea Trial Performance, Support, Provide WORK ITEM 50: Deck Covering System (Galley and Mess Deck), Modify WORK ITEM 51: Bilge, Machinery Space, Preserve WORK ITEM 52: Piping, Sewage Discharge, Renew WORK ITEM 53: Hull, Structural Closures, Renew WORK ITEM 54: Electro-Hydraulic Crane, Renew

File details come from the government source that posted it. Updated .