Crane_GMSF_SOR_2023.pdf

PDF 381 KB Posted

Attached to
NF Crane Rental Federal contract opportunity
Solicitation number
NM-AN2140-23-01447
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This Statement of Requirement (SOR) outlines the need for crane rental services to assist in loading and unloading equipment from NOAA Ship Nancy Foster at facilities in Pascagoula, Mississippi over four dates in August, September, and October 2023. The largest lift will be approximately 20,000 pounds at an 80-foot radius. Services will include approximately 11 picks over 10 hours on the first date, 8 picks over 10 hours on the second date, 11 picks over 8 hours on the third date, and 8 picks over 8 hours on the fourth date. The related federal contract opportunity is a solicitation from the Department of Commerce National Oceanic and Atmospheric Administration seeking a contractor to provide the crane rental services as specified in the SOR. Contact information is provided for questions regarding the requirements.

View the file

Other files for this federal contract opportunity

Other files attached to NF Crane Rental, newest first.
File Type Posted
Service Contract Act WD 2015-5147.pdf PDF
088 Solicitation CSUITE Service Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF REQUIREMENT (SOR)

1. PURPOSE

NOAA Ship Nancy Foster’s will be docking at Singing River Island, Pascagoula, MS, and Gulf Marine Support Facility, Pascagoula, MS, and needs to load and unload gear with the assistance of a third party crane.

2. TECHNICAL SPECIFICATIONS

Period of performance: 8/1/2023 – 10/30/2023

Location #1: Gulf Marine Support Facility, 151 Watts Ave, Pascagoula, MS 39567 Location #2: Singing River Island, USS Parsons Way, Pascagoula, MS 39595

Largest lift is approximately 20,000 lbs at 80’ radius

Number of picks listed is approximate and will be between the trucks, pier, and ship. Time duration is approximate, and will likely be under 8 hours not including crane set-up time.

Day 1: 8/16/2023, Singing River Island (SRI) – Pascagoula, MS Oceaneering ROV mobilization. ~11 picks, approximately 10 hours.

Day 2: 9/23/2023, Gulf Marine Support Facility (GMSF) – Pascagoula, MS Sentry AUV mobilization. ~8 picks, approximately 10 hours.

Day 3: 10/6/2023, Location TBD, SRI/GMSF – Pascagoula, MS Oceaneering ROV Demobilization. ~11 picks, approximately 8 hours.

Day 4: 10/21/2023 Location TBD, SRI/GMSF – Pascagoula, MS Sentry AUV Demobilization. ~8 picks, approximately 8 hours.

4. POINT OF CONTACT

The ship's point of contact for the purchase is:

LT Michael Ball xo.nancy.foster@noaa.gov Ship VOIP 541-867-8915 Ship Cell 843-991-6326

AUV Sentry Weights

(1) - AUV - 3k lbs

(2) - 20’ Control Van - 18k lbs unloaded

(4) - Deck Boxes Equipment for the lab - 3k lbs

(1) - Weight stack for drop weights - 3klbs

Crane Location at GMSF:

File details come from the government source that posted it. Updated .