CostSchedule_Crwnpt_Remediation.pdf
PDF 119 KB Posted
- Attached to
- REMEDIATION FORMER CROWNPOINT CS Federal contract opportunity
- Solicitation number
- 140A0921Q0067
About this file
This document contains a government cost estimate for remediation work at the former Crownpoint Community School in Crownpoint, New Mexico. The estimate outlines costs for several key tasks including stockpile removal, planning, site assessment, and a final report. It estimates costs of $15 per cubic yard to remove and dispose of 5,000 cubic yards of stockpile waste, and $37.50 per ton to transport and dispose of 4,800 tons. Site assessment tasks including drilling, laboratory analysis, and 56 soil and groundwater samples are estimated to cost $1,051 per sample. The related federal contract opportunity is solicitation number 140A0921Q0067 from the Department of the Interior Bureau of Indian Affairs Navajo Region seeking remediation services for the former Crownpoint Community School.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT_Crownpoint_Phase_II_ESA_Attachments_D_and_E_0002.pdf | ||
| DRAFT_Crownpoint_Phase_II_ESA_0002.pdf | ||
| RMC_2008_Final_Crownpoint_SI_07-15-09_(1)_0002.pdf | ||
| Sol_140A0921Q0067_Amd_0002.pdf | ||
| Q_A_Crownpoint_Remediation_0002.docx | DOCX document | |
| Terranext_Crownpoint_Report_0002.pdf | ||
| Sol_140A0921Q0067_Amd_0001.pdf | ||
| fedbizopps_CrwnptRemediation.pdf | ||
| Sol_140A0921Q0067.pdf | ||
| BuyIndianRepresentation.pdf | ||
| SOW_CronwpointSchool_Remediation.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNMENT COST ESTIMATE for Remediation at the Former Crownpoint Community School in Crownpoint, NM
Task 1 Contractor Costs
1. Mobilization/Transportation/Site setup/Offices $________
2. Equipment owned/Rental $_______
3. Material/Supplies $____
Task 2 Pre-work Submittals
1. Health & Safety Plan $_________
2. Work Plan & Schedule/ Fencing/ Traffic control $_________
3. CWA permits USEPA Region 9 and Navajo Nation EPA $_________
Task 3 Stockpile Removal
1. Stockpile waste testing / removal ( ̴5,000 CY)(at $15 per CY) $________
2. Transportation / Disposal ($37.50 per ton at 4,800 tons) $________
Task 4 Planning
1. Records Review / Develop Sampling Plan $________
Task 5 Site Assessment
1. Sampling (Drilling / Lab Analysis) ($1,051.00 per sample with 56 soil and GW samples) $________
B. Prepare Final Report with Attachments $_________
C. Basic Total Cost
D. Taxes
1. Navajo Nation Tax (6%)
2. New Mexico State Tax (6.75%)
FINAL COST