Copy of S02 - Attachment 3 - Price Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- 614-21-3 - Remove pavers and replace with concrete Federal contract opportunity
- Solicitation number
- 36C24921R0088
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24921R0088 0001.docx | DOCX document | |
| 36C24921R0088.docx | DOCX document | |
| S02 - Attachment 1 - Wage Determination - Shelby County.pdf | ||
| S02 - Attachment 2 - Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown
| JOB NAME: Remove Pavers and Replace with Concrete LOCATION: Memphs VAMC PROJECT # 614-21-3 BID DATE: 04/20/2021 | |||||||
| TOTAL $582,387.87 | $0 | ||||||
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | SUB-CONTRACTOR* | LINE TOTALS | COMMENTS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| 01 00 00 | General Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 01 32 16.15 | Project Schedules (Small Projects – Design/Bid/Build | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 01 33 23 | Shop Drawings, Product Data, and Samples | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 01 35 26 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 01 42 19 | Reference Standards | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 01 57 19 | Temporary Environmental Controls | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 01 74 19 | Construction Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 10 00 | Rough Cartentry | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 01 50.19 | Preparation for Re-Roofing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 07 22 00 | Roof and Deck Insulation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 07 53 33 | Ethylene-Propylene-Diene-Monomer Roofing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 07 60 00 | Flashing and Sheet Metal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 07 71 00 | Roof Specialties | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 07 92 00 | Joint Sealants | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVISION 22 | PLUMBING | $0.00 | ||||
| 22 14 00 | Facility Storm Drainage | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 05 33 | Raceway and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 41 00 | Facility Lightning Protection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
| TOTAL LABOR WITH BURDEN | $0.00 | |||
| LABOR BURDEN $0.00 In Pricing | ||||
| 6.00% | ||||
| TOTAL MATERIALS WITH TAX | $0.00 | |||
| MATERIALS TAX | ||||
| $0.00 | ||||
| TOTAL EQUIPMENT | $0.00 |
| TOTAL SUB | $0.00 | |
| LABOR | $0 | |
| MATERIAL | $0 | |
| EQUIPMENT | $0 | |
| SUB | $0 | *Need to provide subcontractor breakdown |
SUBTOTAL $0
| OVERHEAD | 9.00% | $0 |
| PROFIT | 4.50% | $0 |
SUBTOTAL $0
BOND/FEE 1.03% $0
| GRAND TOTAL | $0 | ||
| $0 | Bid/Proposal Amount |
Sheet3
File details come from the government source that posted it. Updated .