Boiler Devices
Boiler Safety Device Testing Data Sheet Boiler No. ______ Date___________
Department of Veterans Affairs Facility _______________________________________________
Boiler Make, Type and Model, Year Built _________________________________________________________________________________________
Burner Make, Type, Fuels, Year Built____________________________________________________________________________________________
Test Personnel/Company_____________________________________________________________________________________________________
VA Personnel _____________________________________________________________________________________________________________
Operation - Normal System
Trip Point Operation Remarks - Device OK/Adjusted/Replaced
Pressure Vessel
High water alarm inches up Normal water level _____inches up
Low water alarm inches up
Low water cutout (slow drain) inches up
Aux low water cutout (slow drain) inches up
Low water cutout shunt switch OK Failed
Aux low water cutout shunt switch OK Failed
High steam press cutout (recycle) psi Header____ psi
High steam press cutout (non-recycle) psi
Steam safety valve No.1 - pop psi Set _____psi
- blowdown psi
Steam safety valve No. 2 - pop psi Set _____psi
- blowdown psi
Steam safety valve No. 3 - pop psi Set _____psi
- blowdown psi
Steam safety valve accumulation test OK Failed
Main Gas
High pressure cutoff psi/in.wc PRV set at ____psi/in.wc
Low pressure cutoff psi/in.wc
Safety shut off valves proof of closure OK Failed
Leak test safety shut off valves (seats) OK Failed
Leak test vent valve (seats) OK Failed
Oil
High pressure cutoff psi Operating ____ psi
Low pressure cutoff psi
High temperature cutoff (heated oil) degrees F Operating ____deg F
Low temperature cutoff (heated oil) degrees F
Low atomizing pressure (No. 1 switch) psi psi
Low atomizing pressure (No. 2 switch) psi
Low atomizing/oil differential pressure psi psi
Oil burner position switch (if provided) OK Failed
Safety shut off valves proof of closure OK Failed
Leak test safety shut off valves (seats) OK Failed
Cold start steam atom burners on compr air OK Failed
LP gas igniter operation OK Failed
Atomizing air compressor motor interlock OK Failed
Igniter Gas (Pilot)
Low gas pressure psi/in. WC psi/in. WC
Leak test safety shut off valves (seats) OK Failed
Leak test vent valve (seats) OK Failed
Combustion Air, Flue Gas, Burner Management Programming
Forced draft fan motor energized interlock OK Failed
Forced draft damper wide open for purge OK Failed
Outlet dmpr (if provided) wide open for purge OK Failed
Prepurge airflow interlock in. WC in. WC@100%
Prepurge timing sec sec
Ignition timing sec 10 sec*
Postpurge timing sec 15 sec
Low fire position interlock OK Failed
Combustion air flow interlock in. WC in.WC min
Low flue gas oxygen interlock %O2
High /furnace/boiler outlet/ pressure (if prov) in. WC in. WC
Pneumatic control air press interlock (if prov) psi psi
FGR damper(if provided) set for prepurge OK Failed
Main flame out - time to close SSO valves sec 4 sec
Ignition flame out - programmed shutdown sec sec
Minimum igniter flame test OK Failed
Scanner not sensing ignition spark (UV only) OK Failed
* 15 seconds allowed on No. 5 and No. 6 oil.
VACO 183A 08/22/07 Reference - Test Methods: VHA Boiler Plant Safety Devices Testing Manual, Fourth Ed., October 2017
Calibration
Checklist - Boiler Plant Inspections, Calibrations and Tests - One Year Period
Department of Veterans Affairs Facility ________________________ Year 2____
Boiler Safety Devices - Testing - Twice per year (Utilize "Boiler Safety Device Testing Data Sheet".)
First Test Date Corrections Completed Second Test Date Corrections Completed
Boiler No. 1
Boiler No. 2
Boiler No. 3
Boiler No. 4
Boiler Internal and External Inspections - Once per year (Qualified professional inspector - provide detailed reports.)
Internal Inspection Date Corrections Completed External Inspection Date Corrections Completed
Boiler No. 1
Boiler No. 2
Boiler No. 3
Boiler No. 4
Feedwater Deaerator Internal Cleaning and Visual Inspection - Once per year
Internal Insp and Cleaning Date Corrections Completed
Feedwater Deaerator Internal Inspection and Weld Testing -Every 6 years (Qualified professional inspection - provide detailed report.)
Intnl Insp and Weld Testing Date Corrections Completed
Controls and Instruments Calibration -Twice per year (Technicians must provide detailed reports.)
First Calib Date Corrections Completed Second Calib Date Corrections Completed
Boiler controls Combustion
Oxygen trim
Flue gas recirculation (FGR)
Outlet draft
Feedwater level controls
Master pressure
Instrumentation Steam flow
Gas flow
Oil flow
Flue gas oxygen
Stack temperature
Boiler draft gages
Economizer temperatures
Pressure transmitters
Temperature transmitters
Pressure gages
Thermometers
Annunciators
Recorders and indicators
Computer work station
Feedwater Deaerator High level alarm
Low level alarm
Overflow
Safety valve
Vacuum breaker
Water level controls
Condensate Storage Tank High level alarm
Low level alarm
Overflow
Water level controls
Building combustion air intake interlock
Building dangerous gas detection system
Steam Safety Valves ( non-boiler) and Liquid Relief Valves (Oil Pumps and Economizers) Testing - Once per year
Test Date Corrections Completed
Steam PRV station safety valves
Steam PRV station safety valves
Oil pump relief valves
Economizer relief valves
Burner Performance Testing Dates - Twice per year (Refer to testing data sheets.)
First Test Date Corrections Completed Second Test Date Corrections Completed
Boiler No. 1
Boiler No. 2
Boiler No. 3
Boiler No. 4
Reference - Testing Requirements: VHA Directive 1810, Boiler Plant Operations
VACO 183A 1/19/07
Combustion Gas
BOILER NATURAL GAS COMBUSTION PERFORMANCE TEST DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER__________________________________ DATE_________________
Boiler No. ____ Boiler Make, Model, Type_______________________________________________ Burner Make, Model, Type____________________________________________
Clock Time for Test Point Hour - Min
Firing Rate Control Output 0 - 100%
Fuel Flow Control Valve 0 - 100%
Combustion Air Damper 0 - 100%
Forced Draft Fan VFD Hz
Flue Gas Analyses O2 - Test Instrument %
CO - Test Instrument PPM
NOX-Test Instrument PPM
O2 - Plant Data System %
Flue Gas Temp. Boiler Outlet Degrees F
Economizer Outlet Degrees F
Draft Windbox / Furnace In WC
Boiler Outlet / Econ Outlet In WC
Fuel Data Regulator Press - Inlet PSI
Regulator Press - Outlet PSI / In WC
Burner Press PSI / In WC
Flow Rate SCFH
Energy Input BTU/HR
Flame Appearance
Boiler Steam Output Flow Rate LB/HR
Press - Boiler / Header PSI
Boiler Water Level % Glass
Feedwater Press - Econ In / Out PSI
Press - Control Valve Inlet PSI
Temp - Econ In / Out Degrees F
Temp - Boiler Inlet Degrees F
Deaerator Steam Press PSI
Test Personnel: __________________________________________________________________________________________________________________________________________
Notes:
Reference - Test Methods: Refer to VA Master Spec for the boiler, Part 3, Inspections and Tests.
VACO 183A 1/19/07
Combustion Oil
BOILER NO. 2 FUEL OIL COMBUSTION PERFORMANCE TEST DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER__________________________________DATE_________________
Boiler No. ____ Boiler Make, Model, Type_______________________________________________ Burner Make, Model, Type____________________________________________
Clock Time for Test Point Hour - Min
Firing Rate Submaster 0 - 100%
Fuel Flow Control Valve 0 - 100%
Comb. Air Damper 0 - 100%
FD Fan VFD Hz
Flue Gas Analyses O2 - Test Instrument %
CO - Test Instrument PPM
NOX-Test Instrument PPM
O2 - Plant Data System %
Smoke
Flue Gas Temp. Boiler Outlet Degrees F
Economizer Outlet Degrees F
Draft Windbox / Furnace In WC
Outlet - Boiler / Econ In WC
Fuel Data Press - Header / Fuel Train PSI
Burner Press - Oil / Atom PSI
Flow Rate GPH
Energy Input BTU/HR
Flame Appearance
Boiler Steam Output Flow LB/HR
Press - Boiler / Header PSI
Boiler Water Level % Glass
Feedwater Press - Econ In / Out PSI
Press - Control Valve Inlet PSI
Temp - Econ In / Out Degrees F
Temp - Boiler Inlet Degrees F
Deaerator Steam Press. PSI
Test Personnel: __________________________________________________________________________________________________________________________________________
Notes:
Reference - Test Methods: Refer to VA Master Spec for the boiler, Part 3, Inspections and Tests.
VACO 183A 1/19/07