Copy of Elevator Schedule-Reflecting Inspections 02.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- H259--VERTICAL TRANSPORT SYSTEMS (ELEVATORS) INSPECTIONS WASHINGTON, DC VAMC TIERED EVALUATIONS Federal contract opportunity
- Solicitation number
- 36C24522Q0645
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24522Q0645_1.docx | DOCX document | |
| S02-36C24522Q0645-Vertical Transport System (Elevators) Inspection-DC 7-14-22.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEVATOR SCHEDULE-INSPECTION
| LOCATION | AREA | COMMENTS | TYPE | LOCATION | MANUFACTURER | INSPECTORS | ||||
| DESIGNATION | TESTING DATES | |||||||||
| Elevator | CAT 1 NO LOAD | CAT5 FULL LOAD | SEMI-ANNUAL | |||||||
| ADMIN | ADMIN BUILDING | Hydraulic | Admin Building | SCHINDLER | ADMIN BLDG | 10/28/21 | 5/26/22 | |||
| ELEVATOR #12 | EMERGENCY ROOM ELEVATOR | Cable | BUILDING 1 E Section | Motion Controls | ED-12 | 10/27/21 | 10/27/21 | 5/26/22 | ||
| FISH-1 | FISHER HOUSE | Hydraulic | Fisher house | THYSSEN-KRUP | FISHER HOUSE | 10/28/21 | 5/26/22 | |||
| ELEVATOR #1 | MAIN BANK NEAR STARWELL #1 | LEFT SIDE | Cable | BUILDING 1 A Section | Motion Controls | P1 | 10/25/21 | 10/25/21 | 5/26/22 | |
| ELEVATOR #2 | MAIN BANK NEAR STARWELL #1 | MIDDLE | Cable | BUILDING 1 A Section | Motion Controls | P2 | 10/25/21 | 10/25/21 | 5/26/22 | |
| ELEVATOR #3 | MAIN BANK NEAR STARWELL #1 | RIGHT SIDE | Cable | BUILDING 1 A Section | Motion Controls | P3 | 10/25/21 | 10/25/21 | 5/26/22 | |
| ELEVATOR #4 | SOUTH ELEVATORS NEAR FREIGHT | RIGHT SIDE | Cable | BUILDING 1 A Section | Motion Controls | P4 | 10/25/21 | 10/25/21 | 5/26/22 | |
| ELEVATOR #5 | SOUTH ELEVATORS NEAR FREIGHT | MIDDLE | Cable | BUILDING 1 A Section | Motion Controls | P5 | 10/25/21 | 10/25/21 | 5/26/22 | |
| ELEVATOR #8 | MORGUE ELEVATOR | Hydraulic | BUILDING 1 B Section | OTIS | P8 | 10/26/21 | 5/26/22 | |||
| ELEVATOR #9 | NURSING HOME ELEVATOR | LEFT SIDE | Hydraulic | BUILDING 6 K Section | Motion Controls | P9 | 10/28/21 | 5/26/22 | ||
| ELEVATOR #10 | SUB BASEMENT ELEVATOR | BASEMENT ACROSS FROM MAIN BANK | Hydraulic | BUILDING 1 A Section | Motion Controls | P10 | 10/26/21 | 5/26/22 | ||
| ELEVATOR #11 | NURSING HOME ELEVATOR | RIGHT SIDE | Hydraulic | BUILDING 6 K Section | Motion Controls | P11 | 10/28/21 | 5/26/22 | ||
| ELEVATOR #13 | RESEARCH ELEVATOR | Hydraulic | Research Build #4 | Motion Controls | P13 | 10/26/21 | 5/26/22 | |||
| ELEVATOR #14 | SOUTH ELEVATORS NEAR FREIGHT | LEFT SIDE | Cable | Motion Controls | Motion Controls | P14 | 10/25/21 | 10/25/21 | 5/26/22 | |
| ELEVATOR #15 | 4C PENT HOUSE CONF ROOM | Cable | 4C Patient Ward | EC | P15 | 10/29/21 | 10/29/21 | 5/26/22 | ||
| PPG-1 | PATIENT PARKING GARAGE-1 | Cable | Patient Parking Garage | SCHINDLER | PK1 | 10/29/21 | 10/29/21 | 5/26/22 | ||
| PPG-2 | PATIENT PARKING GARAGE-2 | Cable | Patient Parking Garage | SCHINDLER | PK2 | 10/29/21 | 10/29/21 | 5/26/22 | ||
| ELEVATOR #6 | FREIGHT ELEVATOR BY SOUTH BANK | Cable | BUILDING 1 A Section | Motion Controls | S6 | 10/26/21 | 10/26/21 | 5/26/22 | ||
| ELEVATOR #7 | CODE BLUE ELEVATOR | Cable | BUILDING 1 A Section | Motion Controls | S7 | 10/26/21 | 10/26/21 | 5/26/22 | ||
| AUD CONTRL | 4TH FLOOR AUDITORIUM | MANLIFT | AUD CONTRL | 10/29/21 | 5/26/22 | |||||
| SPD CLEAN | Hydraulic | SPD CLEAN | 5/26/22 | |||||||
| SPD SOILED | Hydraulic | SPD SOILED | 5/26/22 |
| THE ELEVATOR TYPES NOTED IN RED WERE ORIGINALLY NOTED AS BEING CABLE TYPE | NO INSPECTION | PART OF A RENOVATION PROJECT--NOT TURNED OVER TO VA |
| NO INSPECTION | OUT OF SERVICE AT TIME OF INSPECTION | |
| NO INSPECTION | UNITS OFF LINE--WATING AN EXTENSIVE REPAIR 688-C20214 URGENT REPAIR VERTICAL LIFT SYSTEMS P1-P2-P3 and CODE BLUE P-7 |