CODE

(Hour)

PAGE(S)

until 02:00 PM local time 07 Aug 2021

X

A X B X C X D

EX

X

G F 84 - 120

121 - 131 H 132 - 136

Andrew.Kenyon1@Navy.Mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C9 1 136

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N66604 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Not Authorized conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ANDREW KENYON 401-832-7290

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 4 5 - 8

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

9 - 19 20 - 21

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

22 - 23 24 - 25

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 26 - 34 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

35 - 82

PART II - CONTRACT CLAUSES

NAVAL UNDERSEA WARFARE CENTER

ANDREW KENYON, CODE 0222, 401-832-3247,

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

11 May 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6660421R0518

Section A - Solicitation/Contract Form

GENERAL INFO AMENDMENT 0001

AMENDMENT 0001

The purpose of solicitation Amendment 0001 is to:

1. Revise the SOW in section C as follows:

Update Section 2.0 Scope from “The contractor shall manufacture, test, package, and deliver OB-122 Outboard Electronics (OBE) Canisters for the Wide Aperture Array (WAA) and TD-1479 Outboard Electronics (OBE) Canisters for the Large Spherical Array (LSA), in accordance with the applicable documents identified in Section 3.0. “

To “The contractor shall manufacture, package, and deliver OB-122 Outboard Electronics (OBE) Canisters for the Wide Aperture Array (WAA) and TD-1479 Outboard Electronics (OBE) Canisters for the Large Spherical Array (LSA), in accordance with the applicable documents identified in Section 3.0.”

2. Respond to questions from industry as follows:

QUESTION 1: Can the government confirm that there are no testing requirements?

RESPONSE 1: This is a build-to-print requirement. A CIPS document is not associated with this solicitation.

QUESTION 2: If there are testing requirements can the government provide such requirements and pass/fail criteria in writing?

RESPONSE 2: N/A

QUESTION 3: If there are no testing requirements will the vendor be paid when product is found at a later date to not perform per the CIPS?

RESPONSE 3: Any non-compliance with the prints will be revealed during the inspection process; this will prevent acceptance/payment of non-compliant items at the time of inspection.

QUESTION 4: Will the Circuit Card Assemblies provided as GFP under CLIN 0001 be fully populated or will it require population by the contractor?

RESPONSE 4: The Government is providing CCA components as shown in the following table. The vendor will need to obtain some additional material (which are shown on the drawing) and populate the CCA prior to putting the bottle together.

Item Name Item Description Quantity

Connector, Receptacle Electical 5 pin

8192509 Rev A 20

Connector, Receptacle Electical 16 pin

8192510 Rev B 20

Capacitor CCA 1 item 4 60

Capacitor CCA 1 item 7 120 Diode CCA 1 item 21 120 Inductor CCA 1 item 29 80 Resistor CCA 1 item 47 180 Integrated Circuit CCA 1 item 88 40 Capacitor CCA 2 item 4 80 Capacitor CCA 1 item 7 160 Diode CCA 2 item 21 160 Resistor CCA 2 item 47 240

All other terms and conditions remain unchanged. The proposal due date and time are not extended as a result of this amendment.

GENERAL INFO AMENDMENT 0002

AMENDMENT 0002

The purpose of solicitation Amendment 0002 is to:

1. Respond to questions from industry as follows:

Question 1: If there are no electrical tests to be conducted, who certifies that the electronics operate correctly and when?

Response 1: NUWC will perform inspection / acceptance at the vendor site and will validate that the units conform to the print based on the quality standards indicated in the drawing package.

Question 2: If DCMA inspects and accepts to the Prints, and the units are later found to not function electrically correct, will the Government seek return payment under a Latent Defect or Warrantee clause?

Response 2: DCMA is not performing inspection and acceptance of the WAA /LSA OBE units. The specifics of why a unit is not functioning would need to be investigated before a decision to seek return payment is made, as such the Government cannot speculate on a hypothetical situation.

Question 3: Can the Government confirm the shipping destination of this product? Section B, in the CLIN descriptions indicate that the shipping containers shall have a “MARK FOR” label that has the DLA Distribution Annex (Cheatham) address. However, Section D Packaging and Marking and Section F Deliveries or Performance does not specify a shipment address.

Response 3: The shipping address is correctly identified in section B.

Question 4: Will the Government provide the Printed Circuit Board GERBER files upon award? Does the Government warrant that the PCBs can be correctly manufactured from these GERBERS?

Response 4: The Government will provide the Printed Circuit Board GERBER files upon award. The Government validates that under current industry standards the GERBER files result in correctly manufactured PCBs.

2. Extend the proposal due date and time to 22 June 2021 at 1400 EST.

All other terms and conditions remain unchanged.

GENERAL INFO AMENDMENT 0003

AMENDMENT 0003

The purpose of Solicitation Amendment 0003 is to:

1. Provide additional drawings that were not included in the original solicitation Drawing Package.

Drawings are available in SAM.

2. Extend the proposal due date and time to 07 July 2021 at 1400 EST.

GENERAL INFO AMENDMENT 0004

The purpose of Solicitation Amendment 0004 is to:

1. Provide additional drawings that were not included in the original solicitation Drawing Package. Drawings are available in SAM.

2. Extend the proposal due date and time to 07 August 2021 at 1400 EST.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 20 Each OB-122 WAA OBE Bottles

FFP

OB-122 WAA OBE Bottles in accordance with Statement of Work Section C.

The Government will provide one (1) Circuit Card Assembly (CCA) as Government Furnished Material (GFM) for each Bottle ordered.

NOTE: FOR PROPOSAL PRICING PURPOSES OFFERORS SHALL

ASSUME THIS CLIN MAY BE ORDERED AGAINST DURING YEAR 1.

All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:

Mark For:

DLA Distribution Cheatham NUWC Division, Newport Contract #: N66604- TO BE FILLED IN AT AWARD Cheatham Annex 1 C Street Williamsburg, VA 23185

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

PSC CD: 5845

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED Each OB-122 WAA and TD-1479 LSA OBE Bottles

FFP

OB-122 WAA and TD-1479 LSA OBE Bottles in accordance with the SOW in Section C. See Section B pricing tables for stepladder pricing.

All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:

Mark For:

DLA Distribution Cheatham NUWC Division, Newport Contract #: N66604- TO BE FILLED IN AT AWARD Cheatham Annex 1 C Street Williamsburg, VA 23185

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

MAX

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Lot

DATA

FFP

Applicable to all CLINs. Data in accordance with Exhibit A, Contract Data Requirements List (CDRL) DD1423. Specific applicable CDRL's will be attached to individual delivery orders, as required. NOT SEPARATELY PRICED.

Mark For:

Receiving Officer, Naval Station Newport 47 Chandler Street Newport, RI 02841-1716 NUWC Division, Newport Contract #: N66604-TO BE FILLED IN AT AWARD

FOB: Destination

PRICING TABLES

(a) This is an Indefinite Delivery/Indefinite Quantity contract with Firm Fixed Price Provisions. The Contractor shall deliver items according to the orders issued hereunder, using the prices in the individual Contract Line Items (CLINs).

(b) Offerors shall fill in the CLINs by stating the unit price for each item by quantity and CLIN (See Pricing

Table Below).

(c) The Tables below contain pricing according to each Ordering Period and Quantity Range. The Government will determine each quantity to be purchased by issuing a delivery order. Multiple items may be purchased multiple times via individual orders.

TABLES (OFFERORS TO FILL IN)

OB-122 WAA OBE Bottles Production

CLIN 0002

Quantity

11-20 Each 21-30 Each 31-40 Each Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $ Year 4 $ $ $

Year 5 $ $ $

TD-1479 LSA OBE Bottles Production

CLIN 0002

Quantity

11-20 Each 21-30 Each 31-40 Each Year 1 $ $ $ Year 2 $ $ $ Year 3 $ $ $ Year 4 $ $ $ Year 5 $ $ $

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

(SOW)

OB-122 WIDE APERTURE ARRAY (WAA) AND TD-1479 LARGE SPHERICAL

ARRAY (LSA) OUTBOARD ELECTRONICS (OBE) PRODUCTION

1.0 Background

The Fleet Sensors & Cables Engineering Branch (Code 1535) of the Sensors and Arrays Division (Code 153) of the Naval Undersea Warfare Center Division Newport serves as the Navy's Technical Design Agent (TDA), In-Service Engineering Agent (ISEA), and assists with Acquisition Engineering Agent (AEA) activities for surface ship and submarine transducers, acoustic windows, domes and cables. Code 1535 maintains the Navy's transducer, window, and dome and cable inventory in large part by establishing contract vehicles to procure these items, delivered to the stock system and available to support new construction and in-service fleet requirements.

1.1 Places of Performance

All work performed under this contract shall be performed at the contractor facility.

1.2 Authorized Users

Sensor and SONAR Systems Department, Code 15 of the Naval Undersea Warfare Center, Division Newport, RI is the only authorized user of this contract.

1.3 Sponsors

PMS 401 Submarine Acoustic Systems Type Commanders (TYCOMMS) Naval Shipyards

1.4 Types of Funding

Other Procurement, Navy (OPN) Operations & Maintenance, Navy (O&MN)

2.0 Scope

This SOW reflects a build-to-print approach. The contractor shall manufacture, package, and deliver OB-122 Outboard Electronics (OBE) Canisters for the Wide Aperture Array (WAA) and TD-1479 Outboard Electronics (OBE) Canisters for the Large Spherical Array (LSA), in accordance with the applicable documents identified in Section 3.0.

3.0 Applicable Documents

The contractor shall perform the tasking required in Section 4.0 in accordance with the below Applicable Documents.

NUMBER TITLE TASK NUMBER

3.1 NAVSEA Drawing

No. 53711-8192490

OB-122 Wide Aperture Array Outboard Electronics (WAA OBE)

4.2

3.2 NAVSEA Drawing

No. 53711-8192591

TD-1479 Large Spherical Array Outboard Electronics (LSA OBE)

4.2

3.3 NUWC Drawing

50225-00266MN

Configuration Management Engineering Change Document Manual

4.2

4.0 REQUIREMENTS

The contractor shall manufacture, inspect and package OB-122 Wide Aperture Array (WAA) and TD-1479 Large Spherical Array (LSA) Outboard Equipment (OBE), in accordance with the applicable documents identified in Section 3.0.

The following terms apply throughout this requirements section:

Configuration Item The configuration items (CIs) for this contract are OB-122 Wide Aperture Array (WAA) and TD-1479 Large Spherical Array (LSA) Outboard Electronics (OBE) Canisters.

Product Baseline The Product Baselines are applicable documents defined in Section 3.0.

4.1 GENERAL

4.1.1 Contract Kick-Off Meeting

The contractor shall host a Contract Kick-Off meeting at its facility within 45 days after contract award.

Deliverables for Task 4.1.1: The contractor shall deliver Meeting Agenda in accordance with CDRL A001. The contractor shall deliver Meeting minutes in accordance with

CDRL A002.

4.1.2 Progress Reports

The contractor shall prepare and submit monthly Progress Reports over the life of the contract using Government Furnished Information (GFI) 5.1.

Deliverable for Task 4.1.2: The contractor shall deliver monthly Production Progress Reports in accordance with CDRL A003.

4.2. PRODUCTION HARDWARE

4.2.1 The contractor shall manufacture, inspect, test, package and deliver production units in accordance with applicable documents 3.1 and 3.2.

4.2.2 Engineering Changes

The contractor shall prepare engineering change documentation in accordance with applicable document 3.3.

Deliverable for Task 4.2.2: The contractor shall deliver Engineering Change Proposals in accordance with CDRL A004.

5.0 Government Furnished Information

The following Government Furnished Information (GFI) will be made available under this contract/order.

Number Title Task Number

5.1 DD Form 375 Production Progress Report

Form 4.1

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring

Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

None

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)

(a) Definitions. As used in this text:

Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.

Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.

Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.

Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.

Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.

Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.

(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.

(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).

(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.

No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.

(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.

(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication

0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.

(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.

(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.

(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.

(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL- DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).

(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.

(End of Text)

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit ‘A’, attached hereto.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (JAN 2019)

(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.

(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.

The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract.

If required, the Contractor’s Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.

(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow non-compliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 and MIL-HDBK-61A of 7 Feb 2001 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

(d) Non-Engineering Change Proposals (NECPs) – An NECP shall be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.

(e) Deviations/Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.

The explanation of "Need for Deviation/Waiver" in the DD1694 shall provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance and the effect on ship equipment or system operation.

(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, and Deviations/Waivers, the Contractor shall receive equitable adjustment under the following circumstances:

(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.

(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.

(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.

(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.

(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be subject to equitable adjustment.

(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "Disputes" (FAR 52.233-1).

(g) Any cost reduction proposal submitted pursuant to the clause entitled "Value Engineering" (FAR 52.248-1) shall be submitted as a Value Engineering Change Proposal (VECP). The Contractor shall follow the VECP preparation requirements of FAR 52.248-1(c) and any additional guidance provided by the Contracting Officer.

C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I

(NAVSEA) (MAY 2019)

(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.

(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:

(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or

(ii) add items of data or information to the attachment identified in Section J; or

(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:

(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or

(2) By submitting a request to the

Department of Defense Single Stock Point (DoDSSP)

Building 4, Section D

700 Robbins Avenue Philadelphia, Pennsylvania 19111-5094 Telephone (215) 697-6396 Facsimile (215) 697-9398.

Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.

C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)

The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (OCT 2018)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 incorporating Change 2 dated 18 May 2016.

D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor

(2) contract number

(3) sponsor:

(Name of Individual Sponsor)

(Name of Requiring Activity)

(City and State)

D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)

For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (OCT 2018)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM- D-3951-15 approved 1 December 2015, Standard Practice for Commercial Packing.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

D-247-W002 UNPACKING INSTRUCTIONS (NAVSEA) (OCT 2018)

(a) Location on Container. When practical, one set of the unpacking instructions will be placed in a heavy water-proof envelope prominently marked "UNPACKING INFORMATION" and firmly affixed to the outside of the shipping container in a protected location, preferably between the cleats on the end of the container adjacent to the identification marking. If the instructions cover a set of equipment packed in multiple containers, the instructions will be affixed to the number one container of the set. When the unpacking instructions are too voluminous to be affixed to the exterior of the container, they will be placed inside and directions for locating them will be provided in the envelope marked

"UNPACKING INFORMATION".

(b) Marking Containers. When unpacking instructions are provided, shipping containers will be stenciled "CAUTION-

THIS EQUIPMENT MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING INSTRUCTIONS ARE

CAREFULLY FOLLOWED. UNPACKING INSTRUCTIONS ARE LOCATED [Contractor to fill in]." When practical, this marking will be applied adjacent to the identification marking on the side of the container.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Origin Government Origin Government 0002 Origin Government Origin Government 0003 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

E-246-H017 INSPECTION AND ACCEPTANCE OF F.O.B. ORIGIN DELIVERIES (NAVSEA) (OCT 2018)

Items 0001 and 0002 - Inspection and acceptance shall be made at source by a representative of the cognizant Contract Administration Office or other representative of the Government.

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

E-246-W007 NOTIFICATION OF INSPECTION OR TEST (NAVSEA) (OCT 2018)

The Contractor agrees to notify the TPOC identified in Section G, in writing, when the material will be inspected and/or tested. A minimum of 10 business days is required to arrange such a visit.

Section F - Deliveries or Performance

52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-29 F.O.B. Origin FEB 2006 52.247-34 F.O.B. Destination NOV 1991 52.247-48 F.O.B. Destination--Evidence Of Shipment FEB 1999 52.247-65 F.O.B. Origin, Prepaid Freight--Small Package Shipments JAN 1991

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

CLIN 0001: OB-122 WAA OBE Bottles are required to be delivered 6 months after Delivery Order issuance (with GFM provided).

CLIN 0002: Production OB-122 WAA and TD-1479 LSA OBE Bottles can be ordered against for the duration of the 60 month contract. Deliveries are required to start at 6 months after Delivery Order issuance at a rate of 20 units per month until order completion.

CLIN 0003: CLIN 0003 is active for the duration of the 60 month contract. The delivery schedule for specific CDRLs will be included in applicable delivery orders.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

CLIN 0001:

CLIN 0002:

CLIN 0003:

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of clause)

F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)

All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

F-247-H003 F.O.B. ORIGIN (NAVSEA) (OCT 2018)

All supplies hereunder shall be delivered free of expense to the Government in accordance with instructions specified in the clause hereof entitled "F.O.B. Origin" (FAR 52.247-29) at or near the Contractor's plant, _____________________ (Offeror shall insert city, county, and state), for shipment at Government expense (normally on Government bill(s) of lading) in accordance with the delivery instructions specified herein. This paragraph is required pursuant to 52.247-29 (a)(1).

FMS item(s), if any, shall be shipped on a separate bill of lading and Interstate Commerce Act 49 U.S.C. Section 10721 and 13712 rates do not apply.

Section G - Contract Administration Data

52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEPT 2019)

(a) In accordance with 41 U.S.C. 4106(g), the Agency has designated the following task-order and delivery-order Ombudsman for this contract. The Ombudsman must review complaints from the Contractor concerning all task-order and delivery-order actions for this contract and ensure the Contractor is afforded a fair opportunity for consideration in the award of orders, consistent with the procedures in the contract.

[ ___ Contracting Officer to insert name, address, telephone number, and email address for the Agency Ombudsman or provide the URL address where this information may be found.]

(b) Consulting an ombudsman does not alter or postpone the timeline for any other process (e.g., protests).

(c) Before consulting with the Ombudsman, the Contractor is encouraged to first address complaints with the Contracting Officer for resolution. When requested by the Contractor, the Ombudsman may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.

252.204-7006 BILLING INSTRUCTIONS (OCT 2005)

When submitting a request for payment, the Contractor shall--

(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and

(b) Separately identify a payment…