CKF 22-2 PWS EMS 15 Dec 21.pdf

PDF 317 KB Posted

Attached to
Checker Flag Exercise Mission Support Federal contract opportunity
Solicitation number
FA481922CKF02
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Checker Flag Exercise Mission Support, newest first.
File Type Posted
325 CONS Sources Sought.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters Air Combat Command (HQ ACC) 325th Operations Group Tyndall AFB, FL 32403

Performance Work Statement (PWS)

For

Checkered Flag (CKF) Exercise Mission Support

DATED 15 December 2021

Exercise Staff Support

Table of Contents

1.0 SECTION I: DESCRIPTION OF SERVICES

1.1 General Scope

1.2 Background

1.3 Scope

1.4 Inherently Governmental Function

1.5 Period of Performance

1.6 Place of Performance

1.7 Government Requirement For Contractor Identification

1.8 Positions

1.9 Continuation of Essential DoD Contractor Services During Crisis

2.0 SECTION II: SERVICE SUMMARY

2.1 General

2.2 Performance Evaluation

2.3 Government Quality Assurance

2.4 Performance Assessment

2.5 Contracting Officer Representative

2.6 Quality Control

2.7 Contractor’s Performance

3.0 SECTION III: GOVERNMENT FURNISHED PROPERTY and SERVICES

3.1 Government Furnished Services

3.2 Government Furnished Facilities

3.3 Government Furnished Property to include Equipment and Material

4.0 SECTION IV: GENERAL INFORMATION

4.1 Hours of Operation

4.2 Contractor Personnel

4.3 Conservation of Utilities

4.4 Environmental Protection

4.5 Miscellaneous Paragraph

4.6 Security and Base/System Access

5.0 APPENDICES

SECTION I

1.0 DESCRIPTION OF SERVICES

1.1. General. This is a non-personal service contract to provide staffing support services to Tyndall AFB in accordance with FAR 37.104. A personal services contract is characterized by the employer-employee relationship it creates between the Government and the contractor’s personnel. The Government is normally required to obtain its employees by direct hire under competitive appointment or other procedures required by the civil service laws. Obtaining personal services by contract, rather than by direct hire, circumvents those laws unless Congress has specifically authorized acquisition of the services by contract. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government.

1.1.1. Description of Services/Objectives. The contractor shall provide all personnel and supervision necessary to provide qualified support to the 325 OG in their execution of ACC/A3O7 exercises hosted at Tyndall AFB as defined in this Performance Work Statement (PWS). These operations include but are not limited to the planning, exercise and after-action analysis of CHECKERED FLAG (CKF) exercises. The contractor shall perform to the standards in this contract. This includes the planning, coordination, and management of the activities necessary to ensure disciplined work performance and timely resources application to accomplish all tasking under the contract. The contractor shall be responsible for maintaining communication with the contracting officer (CO) and the contracting officer’s representative (COR), and to immediately notify both the CO and the COR of any problems that would prevent timely performance of this contract. The contractor is responsible for and required to implement, and maintain management control systems necessary to plan, organize, direct, and control all activities under this contract.

1.1.2. Only the Contracting Officer is able to direct changes to the PWS requirement, scope, terms and conditions. Any changes made without the express direction of the CO will fall under contractor liability.

1.2. Background. CKF exercises conducted at Tyndall AFB, FL provide ACC/A3O7 Large Force Exercise (LFE) advanced tactical training for Immediate Response Force (IRF) forces. In support of exercises at Tyndall AFB, the 68th Electronic Warfare Squadron (68 EWS) at Eglin AFB, FL is tasked by Air Combat Command (ACC) through the USAF Warfare Center (USAFWC) to be the focal point to manage EW training, testing, tactics development and engineering. CKF exercises are conducted in four phases:

1) Planning Conference/Concept Development 120 Days preceding Exercise

2) Arrival (Overlap w/Planning) 1 Week prior to Exercise

3) Exercise 2 - 3 Weeks

4) Review/AAR Data Collection 1 Week following Exercise

Two CKF exercises typically occur each calendar year, one in the April/May (Spring) timeframe and another in the October/November (Fall) timeframe. CKF notification is sent to staff and participant units concerning the date and details of the initial planning conference approximately 4 weeks prior to the conference or approximately 120 days prior to exercise execution. The exercises are two to three weeks long; contain two missions per day (normally one morning LFE and one afternoon CT “go” encompassing 16 hour/day operations) with up to 100 aircraft and over 1,200 participants supporting 750 sorties. For exercises, separate morning, afternoon or nighttime operations may be conducted during any particular period. Full execution of RTO duties execution from planning to review is expected to be no more than 38 days per exercise (9 days of planning conferences, 23 days of exercise, and 5 days of data reporting).

1.3 Scope.

The contractor shall provide the following support for the May 2022 Checkered Flag Exercise from 2 May 2022 through 25 May 2022. The exercise shall run from 9 May 2022 through 20 May 2022. The necessary support includes but is not limited to the following efforts:

1.3.1. Arrival / Planning

Attend the Initial, Main, and Final planning conferences. The IPC and FPC will be attended VIRTUALLY and the MPC SHALL be in-person. MPC is currently scheduled two months prior to initial contractor support date of 2 May 2022.

Two mission planners arrive seven days prior to Day 1 execution for blue and red coordination brief development and SPINS review. Practice opportunities will be provided the week before to ensure a well-practiced safety brief of which will be approved by the Airboss.

RTOs arrive two workdays prior to exercise for exercise coordination as well as spin-up and system certification for exercise.

Coordinate the necessary locations and materials for the exercise in-briefs, DETCO out-briefs and exercise out-briefs.

Provide a personnel schedule for the duration of the exercise.

1.3.2. Exercise

Attend daily White Force Meetings during the exercise to ensure all exercise goals and objectives are met.

During exercises, the contractor shall ensure staggered shifts for Monday through Friday as well as weekend support as necessary for unique mission requirements. The Program Manager (PM) shall ensure coverage for 18 hours of continuous mission support in accordance with daily flying schedules. Delayed shifts may also be necessary to support afternoon missions. Overtime will not be used to cover weekend support or continuous mission support unless specifically approved by the Contracting Officer. Approval requests for Overtime must be made no later than 4 days in advance of potential instance.

The contractor shall provide 4 personnel to perform RTO functions at Tyndall AFB during CKF exercises. RTO functions include assessing validity of air-to-air engagements, overseeing flight operations, ensuring compliance with range restrictions, and monitoring safety of flight issues. RTO personnel may require access or exposure to COMSEC prior to and during missions. The Government will augment contractor key entry technicians with military and/or civilian personnel (i.e. A/G RTO and A/G debrief analyst), as required, to meet increased mission requirements.

During each exercise the contractor shall provide air-to-air shot lists, air-to-ground weapons effects and High Speed Anti-Radiation Missile documentation for aircrew mass debriefs for every mission and collect mission data for post mission and post exercise analysis. The contractor will control brief and debrief display screens. The contractor shall provide data retrievals as requested by ACC/A307 or the 325 OG_CKF staff to support any requests within the scope of the contract.

Accommodate participant unit mission commanders’ mission planning sessions the day prior to their mission’s execution. Prepare the space and products needed to ensure timely and accurate completion by the unit participants regarding Blue and Red planning teams.

Lead the Blue and Red planning, coordination, building and briefing of the adversary air execution plan for each mission. The Mission Commander will be overall responsible for the safe de-confliction of aircraft during their respective mission.

1.3.3. After Action Review

RTOs will collect and track mission data throughout the exercise and provide the data to the military advisor responsible for writing the After Action Report.

1.4. Inherently Governmental Function. The Contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this PWS.

1.5. Period of Performance. This requirement will cover the necessary timeframe to support the May 2022 exercise running from 9 May 2022 through 20 May 2022. Additional days on site will be required to facilitate the exercise coordination and support.

1.6. Place of Performance. The contractor shall provide support covered in this PWS in-person at Tyndall AFB, FL during planning and exercise execution except where denoted as virtual planning.

1.7. Government Requirement for Contractor Identification. All contractor personnel shall at all times be identified as contractor employees by e-mail, in person, and over the telephone

1.8. Positions. The contractor shall provide sufficiently qualified and trained personnel to fill the positions identified in appendix E as well as any other positions necessary to accomplish the efforts outlined in this PWS.

1.9. Continuation of Essential DoD Contractor Services During Crisis.

In Accordance With DoDI 1100.22, (12 Apr 2010) Continuation of Essential DoD Contractor Services During Crises, DFARS 237.76, and the Air Force implementation thereof, unless otherwise directed by the CO or COR, it is determined that the services as identified in this PWS are essential for performance during a crisis.

1.9.1 In accordance with DFARS 252.237.7023 and DFARS 252.237-7024. The contractor will be required to submit a Mission Essential Plan to be incorporated in the contract to ensure the continuation of these services in crisis situation. This Mission Essential Plan will be submitted no later than 30 days after award. Contracting officers shall consult with a functional manager to assess the sufficiency of the contractor-provided written plan.

Contractors will activate such plans only during periods of crisis, as authorized by the contracting officer, who does so at the direction of the appropriate functional commander or civilian equivalent.

SECTION II

2.0 SERVICE SUMMARY (SS)

2.1. General

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success but do not represent all contract performance requirements. All contract performance requirements in this PWS will be monitored.

2.2. Performance Evaluation. Performance of a service shall be evaluated to determine whether or not it meets the performance requirements of this contract. Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate. In the case of issued Corrective Action Reports (CARs), the Contracting Officer shall take appropriate measures according to inspection of services clause in the contract, i.e., FAR 52.246-4 or 52.212-4(a).

See Technical Exhibit 1.

2.3. Government Quality Assurance. The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The COR will use the contractor’s work schedule, or modified version thereof, to record validation results. Results of the validation then becomes the official Air Force record of the contractor’s performance. Government surveillance of tasks not listed in the PWS or by methods other than those listed in the PWS (such as provided for by the Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the CO as a result of surveillance will be according to the terms of this contract.

2.3.1. The Government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The Government may inspect each task as completed and increase the number of quality assurance inspections if deemed appropriate because of repeated failures discovered during surveillance inspections or because of repeated customer complaints. Likewise, the Government may decrease the number of quality assurance inspections if performance dictates.

2.3.2. When an observation indicates defective performance, the COR will require the contract manager or representative at the site to initial the observation. The initialing of the observation does not necessarily constitute concurrence with the observation, only acknowledgment that he or she has been made aware of the defective performance. When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the CO a CAR for issuance to the contactor. The contractor shall respond to the CAR IAW instructions provided and return it to the CO within 10 calendar days of receipt.

2.4. Performance Assessment.

2.4.1. Periodic Surveillance. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s services. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.

2.4.2. Customer Complaints. The COR will receive and investigate all complaints. The COR shall be responsible for validating customer complaints. The CO shall make final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the contractor. Validated customer complaints shall be corrected within 2 hours of notification. CO will validate corrective action.

2.5. Contracting Officer Representative (COR). CORs are representatives of the CO and will participate in the administration of this contract. After award of the contract, the contractor will be provided a letter identifying the COR and setting forth their duties and authorities. The COR is not authorized to change any of the terms and conditions of the contract/task order.

2.6. Quality Control. In compliance with the applicable contract clauses FAR 52.246-4, entitled, “Inspection of Services (Fixed Price),” or FAR 52.212-4(a) Commercial Terms and Conditions Inspection/Acceptance, develop and maintain an effective quality control program to ensure services are performed IAW this PWS, applicable laws and regulations and IAW best commercial practices.

2.6.1. Quality Control Plan (QCP). The contractor shall be required to submit a QCP within 30 days after contract award. The CO will notify the contractor of acceptance or required modifications to the plan. The contractor shall make appropriate modifications and obtain acceptance of the plan by the CO within 15 days.

The contractor’s QCP shall contain, at a minimum, the following descriptive items:

a. The inspection system to cover all services. Description shall include specifics as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s).

b. The methods to be used for identifying and preventing defects in the quality of services performed.

c. Records must document all inspections and corrective or preventive actions taken.

2.7. Contractor’s Performance. The Government assesses the contractor’s performance on an on-going basis, both positive and negative, and provides a record on a given contract during a specified period of time.

2.7.1. Past Performance Information (PPI). PPI can be provided to other Government agencies, as requested.

SECTION III

3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. Government Furnished property is not expected to be furnished under this contract. Government Furnished Services (Base Support) will be provided as outlined below.

3.1.1. Automated Data Processing Equipment. The Government will provide laptop computers for use on the local area network (LAN), email, and the internet for work related to this contract during the execution phase of the exercise. Government computers will not be issued to contractor personnel during period planning while the contractor is teleworking.

3.1.2. Custodial Service. The Government shall provide custodial services for restroom facilities in base facilities IAW the current base custodial contract. Specific facilities requiring these services can change from exercise to exercise. All inquiries regarding scheduling and level of custodial services will be directed to the COR.

3.1.3. Emergency Medical Services. Tyndall AFB will provide emergency medical services for contractor personnel in performance of services under this contract base IAW AFI 41-115 Chapter 1. The contractor shall reimburse the Government for treatment provided at the current reimbursement rate for non-authorized user IAW AFH 41-114, paragraph 42. The contractor shall provide to the 325th Medical Group, the name of a physician and/or hospital to which injured personnel can be transferred for further treatment and care after receiving initial emergency treatment on base. All mishaps will be promptly reported to the base safety office through the COR.

3.1.4. Insect and Rodent Control. The Government will provide insect and rodent control services. Services will be furnished upon request to the facility manager.

3.1.5. Postal/Installation Distribution. The Base Information Transfer System is available for official Government mail, messages and information pickup distribution point at 730 Suwannee Ave, Tyndall AFB, FL, 32403.

3.1.6. Refuse Collection. The Government will provide refuse collection services. The contractor shall take refuse to the nearest dumpster on a regular basis. The contractor shall comply with all installation recycling programs, refuse volume reduction programs, and hazardous waste collection policies IAW base policies.

3.1.7. Security Police and Fire Protection. Phone number for Security Forces Squadron, (850)-283-2254; Fire Protection, 911.

3.2. Government Facilities. Only during periods of execution, the Government will provide sufficient office space, office phone, network access and required software necessary for exercise support. The contractor must be able to accomplish contract tasks from non-government facilities during periods of non-execution. The contractor will be embedded with the military members of the CKF planning team.

3.3. Government Furnished Property (to include equipment and material). The Government will provide office furniture, an office phone, a computer (desktop or similar), and required software for periods of execution.

During periods of non-execution, the Government will provide the minimum necessary equipment, such as government ID cards and laptops to therefore provide the contractor access to Checkered Flag networks. The networks include, but not limited to; NIPR and SIPR. Laptops will only be provided while the contractor is on location at Tyndall AFB. No Government laptops will be issued for the purpose of teleworking.

SECTION IV

4.0 GENERAL INFORMATION

4.1 Hours of Operation. The contractor shall perform the services required under this contract during the core hours identified by the respective command hours Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for the above reasons. The only deviation will be during periods of execution as stated in paragraph 1.3.3 during periods of execution

4.1.1 Recognized Holidays.*

New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day

*If the holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on Sunday, it will be observed on the following Monday.

4.1.2. Down Days. These are days designated by MAJCOM or 325 FW/CC as non-working days. The Government reserves the right to allow any and all tasks to be performed on these days.

4.1.3. Work Schedules, Leave, and Absences. Monthly schedules will be provided for the upcoming work month to the COR. Any changes in the schedule shall be coordinated between the Contract Manager and the COR.

4.2 Contractor Personnel.

4.2.1. Personnel Roster. The list shall include employee's name, social security number and level of security clearance or base access (to include if escort privileges are authorized), on a Government issued excel spreadsheet. The contractor will be provided the excel sheet upon award of the contract. The list shall be validated by the company facility security officer (FSO) and provided to the COR. The COR will in turn submit the spreadsheet to the Unit Security Manager for processing and the Contracting Officer upon request. Processing of the roster will be a minimum of 14 calendar days. Updated spreadsheets shall be provided when an employee's status or information changes. The contractor roster may be used by requiring activity for the purposes of 100% accountability during real-world and exercise situations.

4.2.2. Contractor Employees.

4.2.2.1 Certifications. Contractor employees shall have current and valid professional certifications and licenses required to perform the work in this PWS, prior to contract award. All certification and licensing requirements by Federal, State, and local agencies shall be complied with at the contractor's expense. The contractor should have any required licenses and certifications submitted with the proposal unless it is

FOUO.

4.2.2.2. Contractor Qualifications. The contractor shall utilize employees possessing adequate training, skills, and knowledge to perform the requirements of this contract.

4.2.2.3. Employee Training. The contractor shall be responsible to ensure all personnel are properly trained to meet the requirements of this PWS. If the Government identifies additional training is required, then the Government shall cover the specific training cost to include travel and related expenses. Additional training expenses shall be approved by the CO prior to the occurrence of the training. The contractor shall maintain training and experience records for each employee during the period of this contract that reflect sufficient personnel are qualified to accomplish all tasks required by this contract. Provide status of employee training upon the Government’s request.

4.2.3. Use of Government Employees.

The contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. In addition, the contractor shall not employ any person who is an employee of the Department of the Defense if such employment would be contrary to the policies contained in AFI 64-106, Chapter 1, Industrial Labor Relations Activities.

4.2.4. Identification of Contractor Employees. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

Contractor personnel will be required to obtain and wear badges in the performance of this service.

4.2.5. Organizational Conflict of Interest (OCI). Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Part 9.5.

Any potential instance of OCI must be reported to the CO immediately.

4.2.6. Personal Conflict of Interest (PCI). The term "PCI" means that a contractor employee assigned to the contract has interests which (i) may diminish his/her capacity to give impartial, technically sound, objective assistance and advice in performing this contract, (ii) may otherwise result in a biased work product under this contract, or (iii) may result in an unfair competitive advantage. Any potential instance of PCI must be reported to the CO immediately.

4.3. Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.

4.4. Environmental Protection. The contractor shall comply with all applicable federal, state and local laws, regulations and standards that are or may become applicable to contractor’s activities in performance of this PWS.

4.5. MISCELLANEOUS PARAGRAPHS:

4.5.1. Freedom of Information Act (FOIA). Subject to the provisions of the FOIA (5 U.S.C. 552/DoD 5400.7- R/AF Supplement). Any request received by the contractor for access/release of information from these records to the public (including Government/contractor employees acting as private citizens), whether oral or in writing, shall be immediately brought to the attention of the CO for forwarding to the Base FOIA Manager to ensure proper processing and compliance with the Act.

4.5.2. Controlled Unclassified Information (CUI). The contractor shall create and maintain CUI material IAW DoD 5400-7R, DoD Freedom of Information Act Program; AFI 33-129, Transmission of Information via the Internet, paragraphs 7.4, 8.2.3, 16 and 17; and AFI 33-201, Communications Security (COMSEC), Table 1. Mark all documents meeting the requirements identified in DoD Regulation 5400-7/Air Force Supplement, paragraphs

C3.2.1.2 thru 3.2.1.9 as “For Official Use Only” IAW instructions identified in paragraph C4.2.1. Safeguard all sensitive data IAW DoD Regulation 5400.7/Air Force Supplement, paragraph C4.4. When documents containing CUI material are authorized for destruction, shred the records in an approved shredder fit for the classification.

Sanitize unclassified ADPE devices IAW NIST SP 800-88, Guidelines for Media Sanitization and classified ADPE devices IAW the NSA/Central Security Service (CSS) Policy Manual 9-12, NSA/CSS Storage Device Sanitization Manual

4.5.3. Notification of Debarment/Suspension Status. The contractor shall provide immediate notice to the CO in the event of being suspended, debarred or declared ineligible by any other federal department or agency, or upon receipt of a notice of proposed debarment from another DoD Agency, during the performance of this contract.

CAC cards needing to be returned in accordance with para 4.6.7.1 will be returned to the Tyndall AFB visitor’s center for destruction.

4.5.4. Correspondence. The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project.

The Government issued contract number is to be referenced on all official communication starting upon notice of award.

4.5.5. Post Award Conference. Post Award Conferences will be conducted IAW FAR Part 42.5. A postaward orientation aids both Government and contractor personnel to (1) achieve a clear and mutual understanding of all contract requirements, and (2) identify and resolve potential problems. The CO will give the contractor the opportunity to conduct the Post Award conference in person or over the phone as necessary. The contractor agrees to attend any post award conference within 10 days of award of the contract. This conference will be held with the contractor, Requirement Owner and the Contracting Officer.

4.5.6. Privacy Act. The contractor shall comply with DoD 5400.11-R, The Privacy Act Program requirements and Air Force Instruction 33-332. The regulation sets mandatory guidelines for collecting, safeguarding, maintaining, using, accessing, amending and disseminating personal information kept in systems of records to comply with the Privacy Act, Title 5, United States Code (U.S.C.), Section 552a.

4.5.7. Records. All records created and received by the contractor in the performance of this contract shall be maintained and readily accessible. Records shall remain the property of the Government.

4.5.8. Inclement Weather. The services provided under this PWS are mission essential, if the base closes due to inclement weather, the contractor may be released, by the installation commander, with the general population of the base at no decrement to contract price. The contractor will follow the local procedures for reporting in inclement weather as advertised on local television and radio stations.

4.6. SECURITY AND BASE/SYSTEM ACCESS

4.6.1 General:

4.6.1.1. Force Protection. The contractor shall comply with all base security regulations and with actions dictated by force protection condition changes/measures. For real-world situations/exercises, changes to force protection conditions could impact contractor performance of work and can include denial of access to the installation to perform work.

4.6.1.2. Privately Owned Vehicles. Each contractor employee driving a privately owned vehicle on the installation must carry at a minimum liability insurance as required by the state. Contractor employees shall comply with all base traffic regulations, adhere to all posted speed limits, and shall not use hand-held cellular telephones while driving on the installation for phone calls or texting. Use of seatbelts is mandatory. Any contractor employee cited for driving under the influence will have their driving privileges immediately revoked for a period to be determined.

4.6.1.3. Weapons and Firearms. Contractor employees are prohibited from possessing weapons, firearms or ammunition, on themselves or within contractor-owned or privately owned vehicle while on Air Force installations.

4.6.1.4. The contractor shall report suspicious activity (refer to Tyndall AFB Contractor Antiterrorism Awareness pamphlet) to Security Forces at 850-283-2254 in a timely manner.

4.6.1.5. The contractor shall refrain from taking any pictures on Tyndall AFB unless previously coordinated with the appropriate government personnel.

4.6.2. Required Training

4.6.2.1. Per AFI 10-245 and AFI 10-245_ACCSUP1, the contractor will be offered Level I - Antiterrorism Awareness Training by the Government. This training provides contractor employees with the requisite knowledge necessary to remain vigilant for possible terrorist threats. Coordination for training should be done by the requiring unit Antiterrorism Representative (ATR) after contract award. AT Level I training can be taken at https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam for non-CAC holders. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit ATR.

4.6.2.2. Contract employees requiring a Common Access Card (CAC) shall receive documented Information Assurance (IA) training, by the Government, prior to receiving access to the local area network (LAN).

Authorized users will receive initial IA orientation and annual awareness training to ensure they know, understand, and apply the IA requirements of Air Force information and IAs. The minimum orientation and awareness requirements for users are outlined in DoD 8570.01-M. IA Program. The contractor shall comply with the established Command, Control, Communication, and Computers (C4) Systems IA program to integrate security education, training, and awareness covering the COMSEC, Computer Security (COMPUSEC), and Emissions Security (EMSEC) disciplines.

4.6.2.3. OPSEC Training. Per AFI 10-701 and AFI 10-701_ACCSUP1, the AF will provide OPSEC specific training or training materials within 30 days of initial award to the contract. Requirement may be accomplished via onsite briefing or training.

4.6.2.4. Ancillary Training. The contractor shall take all ancillary training courses that the Government requires for all military and Civil Service employees and any specific course pertaining to a task.

4.6.3. Additional Security Requirements:

4.6.4. Physical Security. The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

4.6.5. Computer Security (COMPUSEC) In accordance with DoD 5200.01 V1-4 and AFI 31-401, the contractor shall comply with AFI 33-115 V2, Licensing Network Users and Certifying Network Professional, AFMAN 33- 282, Access to Information Systems, and AFI 33-200, Information Assurance Management as they apply to required security clearances and training requirements prior to being granted access to systems.

4.6.5.1. Local Area Network (LAN). The Government will provide limited access to the existing LAN to include email capability. The contractor shall not use the LAN for purposes other than for work required under this contract.

4.6.5.2. Common Access Card (CAC). The contractor’s PM or alternate shall complete all necessary documents for all contractor personnel requiring access to Tyndall AFB. The contractor’s PM shall ensure the Government representative in the local organization designated to authorize issuance of contractor’s CACs (i.e. Trusted Agent

(TA) receives a Visitor Request for each employee through the Trusted Agent Security System (TASS). Contractor personnel shall electronically submit application to the TA, once approved set up appointment at https://rapids-appointments.dmdc.osd.mil/ or go to the Military Personnel Section.

4.6.5.3. National Agency Check Investigations (NACI). Personnel requiring access to the Local Area Network will require a National Agency Check with Written Inquiry (NACI) clearance. An open NACI Investigation, at a minimum, is required before access to Government-furnished workstations that have access to Air Force e-mail systems can be granted. A Network Waiver may be granted by the Unit Commander, if necessary. These investigations shall be submitted by the Government at no additional cost to the contractor.

4.6.6. Contractor Access To Air Force Installations. All contractor employees will be subject to a criminal history background check IAW Air Force Manual (AFMAN) 31-113, Installation Perimeter Access Control, as stipulated in the Installation Commander’s memorandum to the 325th Security Forces Office dated 23 Apr 2015 (the AFMAN and memorandum are both limited access documents but more details on the requirements/process in terms of background checks can be provided by the Unit Security Manager).

Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

Base Access: The contractor shall ensure the following pass and identification items required for contract performance are obtained for employees and non-Government owned vehicles:

a. DoD Common Access Card (CAC), AFI 36-3026(I). Process through USM, Trusted Agent Sponsorship System (TASS) point of contact for a CAC card.

b. AF Form 75, Visitor/Vehicle Pass (AFI 31-204): The contractor shall adhere to local security policy when applying for short/long term visitors’ passes. Any contractor requesting a pass for more than 3 days will complete a Local Files Check with 325 SFS/Pass & ID. Vehicle passes (personal vehicles) are no longer required. All vehicle passes must be escorted onto base by a contractor with escort priveledges.

See paragraph 4.2.1 for escorting priveledges.

4.6.7. Employee Changes. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel.

4.6.7.1. The contractor shall be responsible for prompt return of credentials and vehicle passes for: 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract. The prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.

5.0. APPENDICES

A. Technical Exhibit 1 - Performance Requirements Summary B. Technical Exhibit 2 - Deliverables C. Acronyms and Definitions D. Publications and Forms E. Sample Staffing Descriptions

APPENDIX A – Technical Exhibit 1

Technical Exhibit 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

SS

Performance Objective

PWS

Paragraph

Performance Threshold

The contractor shall have reports, technical products/ deliverables complete, accurate, and conform to the requirements of the PWS.

1.3.1 Monthly 1.3.3

AAR

No more than 1 error per report.

Staffing vacant tasks within 30 working days of a position becoming vacant or the contractor becoming aware of an impending vacancy (whichever occurs earlier).

4.2

100% compliance. (No more than 1 error per report.

The contractor shall promptly respond to Contracting Officer requests, inquiries and direction.

Response time will be dictated by the Contracting Officer per occurrence.

PWS

The contractor shall comply within 1 business day

APPENDIX B – Technical Exhibit 2, Technical Exhibit 2

Deliverables Schedule

PWS Ref / Deliverables

Frequency and expanded details

Acceptable Quality Levels (AQL) /

Deadlines

Surveillance Method / Submit To

1.3.1 Planning

Contractor Schedule

The contractor shall provide an event by event schedule that details which contractor, along with personal contact information, will be attending each event.

Critical events include RTO, MSN Planning, Daily Schedule Meeting, Coordination Briefer, Shot Validation facilitator and out brief meeting.

100% accurate and provided 7 days prior to execution. The schedule will be updated and reposted within 60 minutes.

Periodic Inspection / Exercise Director / COR / Post on CKF SharePoint

1.3.1 Planning

Master Schedule

The contractor shall develop a Master Schedule which includes each exercise event.

100% accurate and updated within 60 minutes of changes.

Periodic Inspection / Exercise Director / COR / Post on CKF SharePoint

1.3.3 Post After

Action Report

The contractor shall develop an After Action Report (AAR) to include a general exercise analysis, focusing on effectiveness and mission goals. The report will include total sorties flown, upgrades, unit feedback and a recommendation for future adjustments.

Contractor inputs are due 5 days after the exercise to meet the military 30 calendar day requirement for the

AAR.

Periodic Inspection / Exercise Director / COR / Post on CKF SharePoint / HQ ACC-A3O7

1.3.1 Arrival

Logistic Progress Chart

The contractor shall provide a progress chart on all logistical requirements for inbound units. The progress chart will be briefed to 325th FW leadership twice a month and then 14 days prior to execution. The contractor will include at a minimum;

facilities, flight-line use, fuel, rental car, airfield conflicts, cargo

100% accuracy and updated on a weekly basis.

Periodic Inspection / Exercise Director / COR / 325th

FW/MSG

coordination and support facility status.

1.3.2 Scope

SharePoint Responsibilities

The contractor will maintain accurate products on the designated SharePoint site. All items will be labeled with an accurate time stamp.

The SharePoint will be updated within 60 minutes after receiving new information.

Periodic Inspection / Exercise Director / COR / Post on CKF SharePoint

1.3.2 Scope

Scenario Slides

The contractor shall build and maintain an

UNCLASSIFIED

PowerPoint brief that contains scenario specific details.

100% accurate and updated 60 minutes prior to the planned brief start time.

Periodic Inspection / Exercise Director / COR / Post on CKF SharePoint

1.3.2 Exercise

LFE Maps

The contractor shall provide a fresh exercise map for each LFE. The map will include all applicable scenario data such as: Bullseye, airspace dimensions, SPINS data and safe areas.

100% accurate. The maps will be provided to the mission commander 60 minutes prior to the beginning of mission planning. Errors will be corrected within 60 minutes.

Periodic Inspection / Exercise Director / LFE Mission Commander

1.3.2 Exercise

Coordination Card

The contractor will create and maintain the Coordination Card for each LFE. The details of the coordination card will be directed by the Exercise Director. The card will be updated throughout the day and confirmed accurate by the contractor in conjunction with the mission commander.

The Coordination Card will be provided to the mission commander 1 hour prior to the beginning of mission planning. 100% compliance on de-confliction plans. The coordination card will be provided to 325th OSS/OSO by 1500L the day prior to execution.

Daily Observation / Exercise Director / Post on SharePoint / 325th OSS/OSO

1.3.2 Exercise

Assist in supervising the LFE launch and recovery

The contractor will be on the radio prior to first fighter airspace entry and will remain on the radio until the last participant exits the airspace.

100% compliance. Daily Observation by the Airboss or Exercise Director

APPENDIX C – Acronyms and Definitions

CKF – Checkered Flag CL – Contingency location LFE – Large Force Exercise MOB – Main-Operating Base FOB – Forward Operating Base SPINS – Special Instructions ID – Identification ROE – Rules Of Engagement RTO – Range Training Officer POC – Point of Contact

APPENDIX D – Publications and Forms

Pubs AFI 17-140 Architecting AFI 36-3026V2 Common Access Card

T.O. 00-33A-1001 GENERAL CYBERSPACE UPPORT ACTIVITIES MANAGEMENT PROCEDURES AND

PRACTICE REQUIREMENTS

AFI 71-101V2Protective Service Matters AFSSI 8522Access to Information Systems DoD 5200.1-RInformation Security Program DoD 5200.2-RPersonnel Security Program DoD 5400.7-RDoD Freedom of Information Act Program DoDD 7045.14Planning, Programming, and Budgeting System (PPBS) DoDD 8140 Information Assurance (IA) Training, Certification, and Workforce Management DoDM 5200.01 V1-4DoD Information Security Program

Forms AF 1199 USAF Restricted Area Badge DoD 254 Contract Security Classification Specification AF 8Certificate of Aircrew Qualification AF 75Visitor/Vehicle Pass AF 332Base Civil Engineer Work Request AF 942Record of Evaluation AF 1042Medical Recommendations for Flying or Special Operational Duty AF 1199USAF Restricted Area Badge AF 2096Classification/On-the-Job Training Action AF 4142Individual Annual Training Record AF 4143Certificate of Qualification AF 2096Classification/On-the-Job Training Action AETC 58Civilian Identification Card DoD 254Contract Security Classification Specification SF 52Request for Personnel Action

APPENDIX E – Sample Staffing Descriptions

Program Manager/Lead RTO. The contractor shall identify a Program Manager responsible for supervising the contractor team performing tasks outlined in this PWS. The PM shall serve as the lead and primary contact for information between the contractor team and the Government CO and COR. The name of this person, and an alternate or alternates, with similar qualifications, who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer not later than the post award conference. The PM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

Desired Qualifications. A minimum of 5 years’ management experience of three or more personnel in the military air operations environment. A bachelor’s degree in engineering, math or science is desired;

however, any degree from an accredited college/university is acceptable with five years military fighter pilot expertise. The contractor shall have experience as a lead member of the planning and execution team for a DoD named exercise in which they have served as a Range Training Officer (RTO) within the last 36 months. Additionally, the contractor shall possess:

• A thorough knowledge of tactical air operations, including role, missions, tactics, and aircrew terminology knowledge of specific mission areas such as counter-air, counter-land, counter-information, strategic attack, intelligence, surveillance, reconnaissance (ISR), command and control (C2), etc., and how these mission areas relate to each other,

• A general knowledge of composite force employment procedures and tactics, and a comprehensive understanding of EW, tactical ranges, threat simulators and target scoring systems,

• A comprehensive knowledge of combat aircraft systems and their use in counter-air, counter-land, and counter-information missions, a working knowledge (technology, capability, systems, limitations, etc.) of combat aircraft and weapons used in combat air operations by U.S. and Allied forces, knowledge of U.S., Allied, and enemy surface-to-air and air-to-air weapons, their employment tactics and capabilities,

• A good overall command of the English language and knowledge of formatting and style used in technical reports,

• A Secret Clearance with SAP access will be required.

Range Training Officers (RTO). The contractor shall provide 4 qualified RTOs to support exercise staff in leading mission briefs, shot validations, mass debriefs and to perform RTO duties during real-time exercise flying. Act as Assistant Activity Security Managers (ASMs) if required in accordance with 325 FW/CVN needs.

Desired Qualifications. Pilot experience in air-to-air specialized fighter aircraft(s) with a preferred 700 flying hours in military aircraft and a qualification of Instructor Pilot (or equivalent) or higher and previous Large Force Exercise brief, debrief and RTO experience. Some portion of the RTO experience must have occurred during a named DOD exercise within the previous 36 months. The RTOs should possess a proven expert knowledge of tactical fighter weapons employment and in the application of current “shot-kill” criteria. A Secret Clearance with SAP access will be required for 2 RTOs and Secret clearance for the remaining.

Mission Coordinator. The contractor shall provide 2 mission coordinators to support exercise participants in mission planning, leading mission briefs, coordination card development, and mass debriefs during the mission planning and exercise execution. The red mission coordinator will assist in advisory de-confliction and scenario development during mission planning and execute scenario management duties during exercise execution in conjunction with the IP of record. The blue mission coordinator will lead mission planning briefs and assist mission commanders in briefings and coordination card development. Additionally, the blue mission coordinator will lead the coordination briefs per the Exercise Director’s and Airboss’s approved format. Note: These 2 positions cannot be filled by 2 of the 4 RTOs due to the timing of the events.

Desired Qualifications. Pilot experience in air-to-air specialized fighter aircraft(s) with a preferred 700 flying hours in military aircraft and a qualification of Instructor Pilot (or equivalent) or higher and previous Large Force Exercise brief, debrief and RTO experience. Some portion of the RTO experience must have occurred during a named DOD exercise within the previous 36 months. The RTOs should possess a proven expert knowledge of tactical fighter weapons employment and in the application of current “shot-kill” criteria. A Secret Clearance with SAP access will be required.

File details come from the government source that posted it. Updated .