Challis Pre-Built Shed Erection_SOW-8-13-20.doc

DOC document 12 MB Posted

Attached to
CHALLIS SHOP 2020 Federal contract opportunity
Solicitation number
140L2520Q0048
Issued by
Department of the Interior Bureau of Land Management Idaho Region

View the file

Other files for this federal contract opportunity

Other files attached to CHALLIS SHOP 2020, newest first.
File Type Posted
Sol_140L2520Q0048_Amd_0001.pdf PDF
Appendix C - Sheeting _ Trim.pdf PDF
Customers Parts List.pdf PDF
Building Drawings from Supplier.pdf PDF
Appendix E - Overhangs.pdf PDF
Instruction Manual - Gable Buildings.pdf PDF
Construction Package.pdf PDF
Appendix D - Glossary.pdf PDF
Sol_140L2520Q0048.pdf PDF
Appendix A - Opening Framing.pdf PDF
Appendix B - Framing Components.pdf PDF
Wage Determination.pdf PDF
Drawings eSigned.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Challis Field Office Pre-Built Shed Erection Delivery Location:

Bureau of Land Management Challis Field Office 721 E. Main Ave. Suite 8

Challis, ID 83226 The Idaho Falls District - BLM intends to procure the services of a General Contractor to perform construction work at the Challis Field Office.

The Contractor shall perform the following construction services:

· Erect the Government supplied pre-engineered shed (Simply Tough Metal Buildings) according to the attached installation instructions onto a Government supplied 4” concrete slab.

1. Supplied pre-engineered shed parts are located on the project site on the supplied 4” concrete slab. (pictures located below)

2. No earthwork is scheduled for this contract.

· Purchase and install a 14’x14’ insulated garage door with chain hoist.

1. Overhead Door - Insulated Sectional Steel-Back Door 470.(or approved equal)

· Purchase and install a 3’ x 6’ 8” man door.

1. TRUDOOR – Flush Commercial Hollow metal door with Polystyrene Core.(or approved equal)

· Purchase and install manufacturer’s recommended insulation.

· Install anchor points into 4” concrete pad and secure building.

Service shall include: materials, labor, equipment, and installation.

Schedule of Items

Item No.
Description
Unit
Unit Cost
Quantity
Total Cost
1
Assemble Pre-Engineered building, anchor installation, and all Appurtenances
LS

Period of Performance: 30 Calendar Days From Issuance of Notice To Proceed

1. Pre-Engineered Shed Parts on Concrete Pad

2. Pre-Engineered Shed Parts on Concrete Pad

3. Project Location Challis, ID.

4. Project Location Challis, ID.