CDRLs.pdf

PDF 176 KB Posted

Attached to
C17 PSE - BREAKOUT BOX - PITOT STATIC Federal contract opportunity
Solicitation number
FA8526-21-Q-0016
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to C17 PSE - BREAKOUT BOX - PITOT STATIC, newest first.
File Type Posted
FA852621Q0016_______0001.pdf PDF
C17-PSE Solicitation Template-FA8526-XX-P-XXXX.xlsx XLSX spreadsheet
Engineering Data List.pdf PDF
IUID.pdf PDF
FA8526-21-Q-0016 .pdf PDF
NDA.docx DOCX document
Packaging.pdf PDF
CDRL_TechManual.pdf PDF
Transportation.pdf PDF
PSE Solicitation Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

16. REMARKS

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE Draft

b. COPIES

Final

Reg Repro

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

A

C17/PSE/17G573809-1

A001 FIRST ARTICLE TEST/INSPECTION PROCEDURES AND

PLAN (FAT/IPP)

PITOT STATIC BREAKOUT BOX

DI-NDTI-82327/T AFLCMC/WLE (C-17 Engr)

DD

A D

See Blk 16 See Blk 16

See Blk 16

The DID shall be tailored as follows:

1. Delete 3.1.f(4)

2. In paragraph 3.8 delete the phrase "software version".

Blk 7:

The Government will accept the Receiving Report through WAWF upon final delivery.

Blk 8:

The FAT/IPP will be approved by C-17 SPO Support Equipment

Engineering.

Blk 10, 11, 12, 13:

The contractor shall submit an initial draft FAT/IPP in accordance with the contracted schedule. The Government engineer shall have 60 days to review the initial draft FAT/IPP. The contractor shall continue to revise the FAT/IPP until the Government engineer is satisfied that the FAT/IPP meets all the necessary requirements of this CDRL. After the Government engineer approves the draft FAT/IPP and notifies the PCO and contractor through email communication, the contractor shall submit the invoice in WAWF for Government final approval of the FAT/IPP.

Blk 14;

The FAT/IPP shall be submitted in a singe, searchable Adobe PDF file and submitted by Email. If the FAT/IPP is greater that 15MB in size, the Government will accept delivery through DoD Safe Access File Exchange (SAFE) (https://safe.apps.mil) to the PCO.

NOTE: Any changes to the FAT/IPP after approval must be coordinated with the technical authority approving the plan. All coordinating actions shall be processed through the contracting officer in accordance with (IAW) contracting regulations and public law.

The draft FAT/IPP shall be submitted to the PCO and the following email addresses:

Julian.Stevenson@us.af.mil AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil

Julian Stevenson

AFLCMC/WLE; DSN 468-6745

See Blk 16

07-Jan-21

AFLCMC/WLE (C17 Eng)

235 Byron Street, Suite 19A

Robins AFB, GA 31098

E-copy

Searchable Adobe PDF 1 1 1

Email to:

See block 16

DoD SAFE (as necessary) 1

The PCO

2 1 1

1 2

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

16. REMARKS

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE Draft

b. COPIES

Final

Reg Repro

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

A

A002 FIRST ARTICLE TEST/INSPECTION PROCEDURES AND

REPORT (FAT/IPR)

DI-NDTI-82326/T

The DID shall be tailored as follows:

1. Delete 3.1.f(4)

2. In paragraph 3.7 delete the phrase "software version".

Blk 7:

The Government will accept the Receiving Report through WAWF upon final delivery of the FAT/IPR.

Blk 8:

The FAT/IPR will be approved by C-17 SPO Support Equipment

Engineering.

Blk 10, 11, 12, 13:

The contractor shall submit an initial draft FAT/IPR in accordance with the contracted schedule. The Government engineer shall have 60 days to review the initial draft FAT/IPR. The contractor shall continue to revise the FAT/IPR until the Government engineer is satisfied that the FAT/IPR meets all the necessary requirements agreed to in the contract. After the Government engineer approves the draft FAT/IPR and notifies the PCO through email communication, the PCO will contact the contractor and the contractor shall submit the invoice in WAWF for Government final approval of the FAT/IPR invoice. The contractor shall not ship the FA until after the FAT/IPR is approved.

Blk 14:

The FAT/IPR shall be submitted in a singe, searchable Adobe PDF file and submitted by Email. If the FAT/IPR is greater that 15MB in size, the Government will accept delivery through DoD Safe Access File Exchange (SAFE) (https://safe.apps.mil) to the PCO.

The draft FAT/IPR shall be submitted to the PCO and the following email addresses:

Julian.Stevenson@us.af.mil AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil

1 1 1

1 2

C17/PSE/17G573809-1

Julian Stevenson AFLCMC/WLE; DSN 468-6745 07-Jan-21

PITOT STATIC BREAKOUT BOX

AFLCMC/WLE (C-17 Engr)

DD

A D

See Blk 16

See Blk 16

See Blk 16

See Blk 16 AFLCMC/WLE (C17 Eng)

235 Byron Street, Suite 19A

Robins AFB, GA 31098

E-copy

Searchable Adobe PDF

Email to:

See block 16

DoD SAFE (as necessary)

The PCO

1 2 1

File details come from the government source that posted it. Updated .