About this file
The document is a Contract Data Requirements List (CDRL) for a Minuteman III Power Supply procurement. The CDRL (Data Item A001) specifies a Test/Inspection Report for a First Article Test, with the contract number PFD20202500724. The item is for eleven power supplies (NSN: 6130016815866), set aside for 100% small business participation through the Defense Logistics Agency Aviation. The document requires the contractor to submit detailed inspection reports, including dimensions, tolerances, material specifications, and manufacturing process certifications. The report must be submitted concurrently with the first article, either in the shipping container or separately, and is controlled under technical information export regulations.
The mailing address for submissions is 809 MXSS/MXDEB (DODAAC: FB2029) at Hill AFB, UT, with specific instructions for report packaging and delivery. The document includes distribution restrictions under the Arms Export Control Act and mandates that the technical data export is limited. The estimated total price for the data item is $0.00, and the document was prepared and approved on 14 APR 2025 by government personnel, indicating an upcoming procurement cycle for these critical power supply components.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRHA225Q0724_______0001.pdf | ||
| SPRHA225Q0724.pdf | ||
| EDL.pdf | ||
| Unmarked Eng Data 2022.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A001 |
| title: Test/Inspection Report |
| sub: First Article Test Report |
| auth: DI-NDTI-80809B/T |
| ref: |
| req_ofc: 414 SCMS/GUEA |
| dd250: SD |
| appcode: A |
| dist: See Blk 16 |
| freq: See Blk 16 |
| asof: See Blk 16 |
| firstsub: See Blk 16 |
| subsub: See Blk 16 |
| addressee1: 809 MXSS/MXDEB |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: See Blk 16 |
| draft2: |
| reg2: |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 1 |
| total_repro: 0 |
| remarks: Block D: |
NIIN: 016815866; PN: RFE23050956-001; Description: Power Supply
Block 4: Contractor format acceptable.
Paragraph 10.2 of DI-NDTI-80809B clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
Block 9: Data submittal shall be marked with "CUI" as a header and footer on each page as well as the following on the cover page:
Controlled by: USAF Controlled by: AFNWC/NM CUI Category: Controlled Technical Information/Export Controlled Distribution/Dissemination Control: Distribution D POC: Daniel Peterson/801-586-3297/daniel.peterson.27@us.af.mil/AFNWC/NIMR
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled:
Determined 14 APR 2025. Other requests for this document must be referred to Minuteman III Systems Directorate, Hill AFB, UT. 84056.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 Of Title 22, United States Code) or the Export Control Reform Act Of 2018 (Chapter 58 Sections 4801-4852 Of Title 50, United States Code).
Violations of these export-control laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25 and DoD instruction 2040.02.
DESTRUCTION: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
| group: NSP |
| total_price: 0.00 |
| prep_name: David Cheney |
| line_item: |
| exhibit: A |
| xtdp: Off |
| xtm: Off |
| othercat: |
| system: See Blk 16 |
| ctr_no: PR# FD20202500724 |
| contr: |
| remarksb: |
Block 10: ONE/R, Report shall be submitted concurrently with the "First Article" item either in the shipping container or separately if the report will not fit within the container unfolded. When shipped in the "First Article" container, report shall be enclosed in a paper or plastic envelope.
Block 11, 12, and 13: Defined in Contract
Block 14: Complete mailing address is:
809 MXSS/MXDEB (DODAAC: FB2029)
Bldg 849, Attn: Non-Accountable Bay Mark For: First Article Do Not Post Hill AFB, UT 84056-5713
| Page2: 2 | |
| Reset: | |
| 2025-04-14T07:04:32-0600 | |
| CHENEY.DAVID.LEE.1537393579 |
| prep_date: 14 APR 2025 | |
| app_by: Ray Dean Murrison | |
| 2025-04-14T07:08:47-0600 | |
| MURRISON.RAY.D.JR.1513506828 |
| app_date: 14 APR 2025 |
| Page: 1 |
| of_pages: 2 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .