CDRLFATR.pdf
PDF 312 KB Posted
- Attached to
- ICBM CABLE ASSEMBLY, POWER Federal contract opportunity
- Solicitation number
- SPRHA2-24-Q-0015
- Issued by
- Defense Logistics Agency Aviation
About this file
This document is a Contract Data Requirements List (CDRL) for a first article test report related to an ICBM cable assembly. The CDRL requires the contractor to submit a first article test report following testing to verify all dimensions and tolerances specified in the manufacturing data and certify that materials and processing conform to requirements. The report is to be marked as distribution authorized to the DoD and contractors for controlled technical information and export-controlled data. Submissions must be provided within 15 days of first article testing and subsequent tests as defined in the contract. The CDRL is associated with Solicitation SPRHA2-24-Q-0015 for an ICBM cable assembly issued by the Defense Logistics Agency Aviation. Submissions shall be provided to the specified government offices.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRHA224Q0015_______0001.pdf | ||
| Unmarked Eng Data 2022.pdf | ||
| SPRHA224Q0015.pdf | ||
| SOW.pdf | ||
| EDL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ICBM PR# FD20202400015-00
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 TEST/INSPECTION REPORT First Article Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80809/T 414 SCMS/GUEA
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a.
ADDRESSEE Draft
Final
A SEE BLK 16 SEE BLK 16 Reg Repro
16. REMARKS: Changes to office symbols, when necessary, shall be made by the CO/ACO without revisions to the CDRL.
BLOCK 4: Contractor format acceptable.
Paragraph 10.2 of DI-NDTI-80809B clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Material used in the manufacturing of the “First Article” shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of the “First Article” item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than the contractor facility shall be included.
BLOCK 9: Data submittal shall be marked with the following on the cover page:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled: determined 10/26/2023..
Other requests for this document shall be referred to 414 SCMS/GUEA, 6031 Gum Lane, Building 1227, Hill AFB, UT 84056.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25.
DESTRUCTION: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
BLOCK 11, 12, and 13: As defined in Contract. Within 15 days after FA testing.
ORG 1
ORG 2
ORG 1: Brian Christiansen brian.christensen.3@us.af.mil
ORG 2: Wayne Lofthouse wayne.lofthouse@us.af.mil
15. TOTAL 2
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Wayne C. Lofthouse, NH-03 Electronics Engineer
See digital signature
Brian Christiansen Logistic Management Specialist
See digital signature
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
LM 18-09
| Form Approved OMB No 07040188: | |
| LM 1809: | |
| A CONTRACT LINE ITEM NO: | |
| B EXHIBIT A: | |
| C CATEGORY TDP TM OTHER X: | |
| undefined: | |
| D SYSTEMITEM ICBM: | |
| F CONTRACTOR: | |
| 2 TITLE OF DATA ITEM TESTINSPECTION REPORT: | |
| 3 SUBTITLE First Article Test Report: | |
| 17 PRICE GROUP: NSP | |
| 5 CONTRACT REFERENCE: | |
| 14 DISTRIBUTION: | |
| b COPIES: | |
| Final: | |
| DraftORG1 ORG 2: | |
| Repro1 1: | |
| Draft15 TOTAL: | |
| Repro2: | |
| H DATE See digital signature: | |
| J DATE See digital signature: | |
| 18 ESTIMATED TOTAL PRICE: $0.00 | |
| 15: | |
| 2023-11-07T09:24:32-0700 | |
| LOFTHOUSE.WAYNE.C.1539868299 |
| 2023-11-07T09:29:59-0700 | |
| CHRISTENSEN.BRIAN.RICHARD.1157786020 |
File details come from the government source that posted it. Updated .