CDRLA003IUIDMarkingPlan17G4200041.pdf

PDF 713 KB Posted

Attached to
C-17, Hose Assembly, Non Metallic Federal contract opportunity
Solicitation number
FA8526-23-Q-0004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to C-17, Hose Assembly, Non Metallic, newest first.
File Type Posted
FA852623Q0004_13FEB23.pdf PDF
FORM1653.pdf PDF
MANDATORYSHIPPINGDOCUMENTS.docx DOCX document
FD20602330148FORM158.pdf PDF
C-17_PSE_Solicitation_Template-FA8526-XX-Q-XXXX-Rev_B.xlsx XLSX spreadsheet
CDRLA002InspectionOnly17G4200041.pdf PDF
013260814BIDSETPR2330148COMPLETE.pdf PDF
Use_and_Non-Disclosure_Agreement.docx DOCX document
CDRLA001InspectionOnly17G4200041.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

16. REMARKS

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE Draft

b. COPIES

Final

Reg Repro

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Reset

CONTRACT DATAREQUIREMENTSLIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B.EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

DD FORM 1423-1 Blank
DD FORM 1423-1 Blank_2
Untitled
Untitled
1 DATA ITEM NO: A003
2 TITLE OF DATA ITEM: ITEM UNIQUE IDENTIFICATION (IUID) MARKING PLAN
3 SUBTITLE: HOSE ASSEMBLY, NONMETALIC - FLUID SERVICE UNIT
4 AUTHORITY Data Acquisition Document No: DI-MGMT-81803A/T
5 CONTRACT REFERENCE:
6 REQUIRING OFFICE: AFLCMC/WLMB (C-17 PM)
7 DD 250 REQ: DD
8 APP CODE: A
9 DIST STATEMENT REQUIRED: D
10 FREQUENCY: See Blk 16
12 DATE OF FIRST SUBMISSION: See Blk 16
11 AS OF DATE: See Blk 16
Text7: 1. After contract award the contractor shall request serial numbers via email from the procuring office program manager. The request shall be made through the program management group email, AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil.

2. The format for the Serial Numbers required to be listed on all ID plates, permanent markings on equipment, and other documents shall be in the format of CAGE-XXXX, where "CAGE" is the Contractor's Commercial and Government Entity code and "XXXX" is a sequential number assigned by the procuring activity. In the event that the technical data package contradicts this format, this CDRL takes precedence.

NOTE: See MIL-STD-130 (current revision as of the date of contract signing) for more information on IUID.

Blk 4:

The DID is tailored as follows:

1. Delete paragraph 3.3.3 in its entirety.

Blk 7:

The Government will accept the Receiving Report for the Marking Plan through WAWF after engineering approval of the draft plan.

Blk 10, 11, 12, 13:

The contractor shall submit the draft Marking Plan in conjunction with the First Article Test/Inspection Procedures and Plan (FAT/IPP) (CDRL A001) if an FAT/IPP is required. Otherwise, the draft Marking Plan shall be delivered 75 days after contract award.

The Government shall have 60 days to review and approve the initial draft Marking Plan. The contractor shall continue to revise the Marking Plan until the Government Engineer is satisfied that the Marking Plan meets all the necessary requirements of this CDRL. After the Government engineer approves the draft Marking Plan and notifies the PCO and contractor through email communication, the contractor shall submit the invoice in WAWF for Government final approval of the Marking Plan.

Cont. on Next Page G PREPARED BY: Julian Stevenson

AFLCMC/WLE; DSN 468-6745

13 DATE OF SUBSEQUENT SUBMISSION: See Blk 16
H DATE: 03-Nov-22
a ADDRESSEE16 REMARKS: AFLCMC/WLMB (C-17 PM)
Draft16 REMARKS:
Reg16 REMARKS:
Repro16 REMARKS:
a ADDRESSEE16 REMARKS_2: 660 Eleventh Street
Draft16 REMARKS_2:
Reg16 REMARKS_2:
Repro16 REMARKS_2:
a ADDRESSEE16 REMARKS_3: Robins AFB, GA 31098
Draft16 REMARKS_3:
Reg16 REMARKS_3:
Repro16 REMARKS_3:
a ADDRESSEE16 REMARKS_4:
Draft16 REMARKS_4:
Reg16 REMARKS_4:
Repro16 REMARKS_4:
a ADDRESSEE16 REMARKS_5: E-copy
Draft16 REMARKS_5:
Reg16 REMARKS_5:
Repro16 REMARKS_5:
a ADDRESSEE16 REMARKS_6: Searchable Adobe PDF
Draft16 REMARKS_6:
Reg16 REMARKS_6:
Repro16 REMARKS_6:
a ADDRESSEE16 REMARKS_7: Email to:
Draft16 REMARKS_7:
Reg16 REMARKS_7:
Repro16 REMARKS_7:
a ADDRESSEE16 REMARKS_8: See Blk 16
Draft16 REMARKS_8: 1
Reg16 REMARKS_8: 1
Repro16 REMARKS_8:
a ADDRESSEE16 REMARKS_9:
Draft16 REMARKS_9:
Reg16 REMARKS_9:
Repro16 REMARKS_9:
a ADDRESSEE16 REMARKS_10: Digital Data
Draft16 REMARKS_10:
Reg16 REMARKS_10:
Repro16 REMARKS_10: 1
a ADDRESSEE16 REMARKS_11:
Draft16 REMARKS_11:
Reg16 REMARKS_11:
Repro16 REMARKS_11:
a ADDRESSEE16 REMARKS_12:
Draft16 REMARKS_12:
Reg16 REMARKS_12:
Repro16 REMARKS_12:
a ADDRESSEE16 REMARKS_13:
Draft16 REMARKS_13:
Reg16 REMARKS_13:
Repro16 REMARKS_13:
a ADDRESSEE16 REMARKS_14:
Draft16 REMARKS_14:
Reg16 REMARKS_14:
Repro16 REMARKS_14:
a ADDRESSEE16 REMARKS_15:
Draft16 REMARKS_15:
Reg16 REMARKS_15:
Repro16 REMARKS_15:
a ADDRESSEE16 REMARKS_16:
Draft16 REMARKS_16:
Reg16 REMARKS_16:
Repro16 REMARKS_16:
a ADDRESSEE16 REMARKS_17:
Draft16 REMARKS_17:
Reg16 REMARKS_17:
Repro16 REMARKS_17:
a ADDRESSEE16 REMARKS_18:
Draft16 REMARKS_18:
Reg16 REMARKS_18:
Repro16 REMARKS_18:
a ADDRESSEE16 REMARKS_19:
Draft16 REMARKS_19:
Reg16 REMARKS_19:
Repro16 REMARKS_19:
a ADDRESSEE16 REMARKS_20:
Draft16 REMARKS_20:
Reg16 REMARKS_20:
Repro16 REMARKS_20:
a ADDRESSEE16 REMARKS_21:
Draft16 REMARKS_21:
Reg16 REMARKS_21:
Repro16 REMARKS_21:
a ADDRESSEE16 REMARKS_22:
Draft16 REMARKS_22:
Reg16 REMARKS_22:
Repro16 REMARKS_22:
a ADDRESSEE16 REMARKS_23:
Draft16 REMARKS_23:
Reg16 REMARKS_23:
Repro16 REMARKS_23:
a ADDRESSEE16 REMARKS_24:
Draft16 REMARKS_24:
Reg16 REMARKS_24:
Repro16 REMARKS_24:
a ADDRESSEE16 REMARKS_25:
Draft16 REMARKS_25:
Reg16 REMARKS_25:
Repro16 REMARKS_25:
a ADDRESSEE16 REMARKS_26:
Draft16 REMARKS_26:
Reg16 REMARKS_26:
Repro16 REMARKS_26:
a ADDRESSEE16 REMARKS_27:
Draft16 REMARKS_27:
Reg16 REMARKS_27:
Repro16 REMARKS_27:
a ADDRESSEE16 REMARKS_28:
Draft16 REMARKS_28:
Reg16 REMARKS_28:
Repro16 REMARKS_28:
a ADDRESSEE16 REMARKS_29:
Draft16 REMARKS_29:
Reg16 REMARKS_29:
Repro16 REMARKS_29:
a ADDRESSEE16 REMARKS_30:
Draft16 REMARKS_30:
Reg16 REMARKS_30:
Repro16 REMARKS_30:
a ADDRESSEE16 REMARKS_31:
Draft16 REMARKS_31:
Reg16 REMARKS_31:
Repro16 REMARKS_31:
a ADDRESSEE16 REMARKS_32:
Draft16 REMARKS_32:
Reg16 REMARKS_32:
Repro16 REMARKS_32:
a ADDRESSEE16 REMARKS_33:
Draft16 REMARKS_33:
Reg16 REMARKS_33:
Repro16 REMARKS_33:
a ADDRESSEE16 REMARKS_34:
Draft16 REMARKS_34:
Reg16 REMARKS_34:
Repro16 REMARKS_34:
a ADDRESSEE16 REMARKS_35:
Draft16 REMARKS_35:
Reg16 REMARKS_35:
Repro16 REMARKS_35:
a ADDRESSEE16 REMARKS_36:
Draft16 REMARKS_36:
Reg16 REMARKS_36:
Repro16 REMARKS_36:
a ADDRESSEE16 REMARKS_37:
Draft16 REMARKS_37:
Reg16 REMARKS_37:
Repro16 REMARKS_37:
a ADDRESSEE16 REMARKS_38:
Draft16 REMARKS_38:
Reg16 REMARKS_38:
Repro16 REMARKS_38:
J DATE: 15-Nov-22
17 PRICE GROUP:
18 ESTIMATED TOTAL PRICE:
Text1: 1
Text2: 1
Text3: 1
2022-11-15T11:29:16-0500
HOWARD.BRADLEY.HAMILTON.1589017311
Page: 1
of: 2
A CONTRACT LINE ITEM NO:
B EXHIBIT: A
Check Box9: Off
Check Box10: Off
OTHER: Item Unique Identification (IUID)
D SYSTEMITEM: C17/PSE/17G420004-1
E CONTRACTPR NO: FD2060-23-30148
F CONTRACTOR:
16 REMARKS Continued: Blk 14:

The Marking Plan shall be submitted in a single, searchable Adobe PDF file and submitted by Email. If the Marking Plan is greater that 15MB in size, the Government will accept delivery through DoD Safe Access File Exchange (SAFE) (https://safe.apps.mil) to the PCO.

NOTE: Any changes to the Marking Plan after approval shall be coordinated with the technical authority approving the plan. All coordinating actions shall be processed through the PCO per contracting regulations and public law.

The draft IUID Marking Plan shall be submitted to the PCO and the following email addresses:

Julian.Stevenson@us.af.mil j.brittain@us.af.mil AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil

Page_2: 2
of_2: 2

File details come from the government source that posted it. Updated .