CDO 2025 Bid Examples for Drilling Contract.doc

DOC document 310 KB Posted

Attached to
35EPR#193944ProfConsultingSvcs State and local contract opportunity
Solicitation number
6100064230
Issued by
Dauphin County, Washington County, Harveys Lake Borough, Pennsylvania

About this file

This document is a detailed pricing and services bid example for a drilling contract, likely for a state or local government department. The file contains six site-specific project examples ranging from residential to rural locations, with drilling work including core borings, auger borings, and piezometer installations. The project sites vary in distance (30-100 miles), drilling depths (15-400 feet), and complexity, with tasks including travel, mobilization, core drilling, air rotary drilling, soil sampling, borehole sealing, and various technical assessments such as geologist time, engineering analysis, and report preparation.

The pricing structure is comprehensive, with unit-based costs for each service and site-specific variations. The bid includes detailed pricing for 28 different service categories, such as travel costs, drilling techniques, soil sampling, testing, survey work, and professional time. Each site example provides a breakdown of quantities, per-unit costs, and total estimated project costs. The document appears to be a flexible pricing template that allows for adaptable project scoping, with a note indicating that additional items or services can be added by mutual agreement between the contracting parties.

View the file

Other files for this state and local contract opportunity

Other files attached to 35EPR#193944ProfConsultingSvcs, newest first.
File Type Posted
Federal Requirements October 2024.pdf PDF
CDO 2025 Drilling Contract Pro Consultant Specs-EPR 193944.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A - Site Example 1 Description of Project:

· Residential: 80 miles to site.

· (5) Auger borings to mine. Depth to mine, outcrop to 30 ft.

· (1) Test Pit

Quantity
Cost / Unit
Total Cost
1. Travel Costs
320
$ / Mile
$
2. Mobilization/Demobilization
1.0
$ / Site
$
3. Additional Mob./Demob.
60
$ / Mile
$
4. Core Drilling (Vertical)
0
$ / Ft
$ N / A
5. Core Drilling (Angle)
0
$ / Ft
$ N / A
6. Air Rotary Drilling
0
$ / Ft
$ N / A
7. Reaming Coreholes
0
$ / Ft
$ N / A

8. Subsurface Soil Sampling

a) Auger Drilling
150.0
$ / Ft
$
b) Continuous Split Spoon Sample
14.0
$ / Sample
$
c) Shelby Tube Sample
0
$ / Sample
$ N / A
9. Borehole Sealing
150.0
$ / Ft
$
10. Borehole Reclamation
5
$ / B.Hole
$
11. Natural Moisture Content Test
0
$ / Test
$ N / A
12. Mechanical Analysis Test
0
$ / Test
$ N / A
13 Consolidation Test
0
$ / Test
$ N / A
14. Specific Gravity Test
0
$ / Test
$ N / A
15. Direct Shear Test
0
$ / Test
$ N / A
16. Fecal Coliform Test
0
$ / Test
$ N / A
17. Test Pit
300
$ / Cu.Ft
$
18. Level Survey
0
$ / Hr
$ N / A
19. Location Survey
0
$ / Hr
$ N / A
20. Geologist Time
8.0
$ / Hr
21. Field Technician Time
0
$ / Hr
$ N / A
22. Engineering Analysis Time
6.5
$ / Hr
$
23. Report Preparation Time
4.0
$ / Hr
$
24. Expert Witness Testimony Time
0
$ / Hr
$ N / A
25. Testimony Preparation Time
0
$ / Hr
$ N / A
26. Stand-By Time
0
$ / Hr
$ N / A
27. 4” Casing Installation
0
$ / Ft
$ N / A
28. Piezometer Installation
0
$ / Ft
$ N / A
TOTAL PRICE
$

Attachment A - Site Example 2

· Residential: 40 miles to site.

· 3- Core borings (1 to mine level, 2 into bedrock).

· Depth to mine: 65 ft. Depth to bedrock: 20 ft.

Quantity
Cost / Unit
Total Cost
1. Travel Costs
160
$ / Mile
$
2. Mobilization/Demobilization
1
$ / Site
$
3. Additional Mob./Demob.
0
$ / Mile
$ N / A
4. Core Drilling (Vertical)
80.0
$ / Ft
$
5. Core Drilling (Angle)
0
$ / Ft
$ N / A
6. Air Rotary Drilling
0
$ / Ft
$ N / A
7. Reaming Coreholes
0
$ / Ft
$ N / A

8. Subsurface Soil Sampling

a) Auger Drilling
60.0
$ / Ft
$
b) Continuous Split Spoon Sample
40.0
$ / Sample
$
c) Shelby Tube Sample
0
$ / Sample
$
9. Borehole Sealing
140.0
$ / Ft
$
10. Borehole Reclamation
3
$ / B.Hole
$
11. Natural Moisture Content Test
0
$ / Test
$ N / A
12. Mechanical Analysis Test
0
$ / Test
$ N / A
13. Consolidation Test
0
$ / Test
$ N / A
14. Specific Gravity Test
0
$ / Test
$ N / A
15. Direct Shear Test
0
$ / Test
$ N / A
16. Fecal Coliform Test
0
$ / Test
$ N / A
17. Test Pit
0
$ / Cu.Ft
$ N / A
18. Level Survey
0
$ / Hr
$ N / A
19. Location Survey
0
$ / Hr
$ N / A
20. Geologist Time
8.0
$ / Hr
$
21. Field Technician Time
0
$ / Hr
$ N / A
22. Engineering Analysis Time
5.5
$ / Hr
$
23. Report Preparation Time
2.0
$ / Hr
$
24. Expert Witness Testimony Time
0
$ / Hr
$ N / A
25. Testimony Preparation Time
0
$ / Hr
$ N / A
26. Stand-By Time
0
$ / Hr
$ N / A
27. 4” Casing Installation
0
$ / Ft
$ N / A
28. Piezometer Installation
0
$ / Ft
$ N / A
TOTAL PRICE =
$

Attachment A - Site Example 3

· Residential: 30 miles to site.

· 2- Core borings (1 to mine level, 1 into bedrock ). 2-Auger to bedrock/refusal.

· Depth to mine: 120 ft. Depth to bedrock: 20 ft.

Quantity
Cost / Unit
Total Cost
1. Travel Costs
120
$ / Mile
$
2. Mobilization/Demobilization
1
$ / Site
$
3. Additional Mob./Demob.
0
$ / Mile
$ N / A
4. Core Drilling (Vertical)
100.0
$ / Ft
$
5. Core Drilling (Angle)
80.0
$ / Ft
$
6. Air Rotary Drilling
0
$ / Ft
$ N / A
7. Reaming Coreholes
0
$ / Ft
$ N / A

8. Subsurface Soil Sampling

a) Auger Drilling
80.0
$ / Ft
$
b) Continuous Split Spoon Sample
40.0
$ / Sample
$
c) Shelby Tube Sample
2
$ / Sample
$
9. Borehole Sealing
260.0
$ / Ft
$
10. Borehole Reclamation
4
$ / B.Hole
$
11. Natural Moisture Content Test
1
$ / Test
$
12. Mechanical Analysis Test
1
$ / Test
$
13. Consolidation Test
1
$ / Test
$
14. Specific Gravity Test
1
$ / Test
$
15. Direct Shear Test
1
$ / Test
$
16. Fecal Coliform Test
1
$ / Test
$
17. Test Pit
0
$ / Cu.Ft
$ N / A
18. Level Survey
0
$ / Hr
$ N / A
19. Location Survey
0
$ / Hr
$ N / A
20. Geologist Time
25.0
$ / Hr
$
21. Field Technician Time
0
$ / Hr
$ N / A
22. Engineering Analysis Time
30.0
$ / Hr
$
23. Report Preparation Time
16.0
$ / Hr
$
24. Expert Witness Testimony Time
6.0
$ / Hr
$
25. Testimony Preparation Time
8.0
$ / Hr
$
26. Stand-By Time
0
$ / Hr
$ N / A
27. 4” Casing Installation
0
$ / Ft
$ N / A
28. Piezometer Installation
0
$ / Ft
$ N / A
TOTAL PRICE =
$

Attachment A - Site Example 4

· Residential: 35 miles to site.

· 1- Core boring to mine level. 2-Air Rotary borings to mine level.

· Depth to mine: 75 ft. Depth to bedrock: 5 ft.

Quantity
Cost / Unit
Total Cost
1. Travel Costs
140
$ / Mile
$
2. Mobilization/Demobilization
1
$ / Site
$
3. Additional Mob./Demob.
0
$ / Mile
$ N / A
4. Core Drilling (Vertical)
70.0
$ / Ft
$
5. Core Drilling (Angle)
0
$ / Ft
$ N / A
6. Air Rotary Drilling
150
$ / Ft
$
7. Reaming Coreholes
0
$ / Ft
$ N / A

8. Subsurface Soil Sampling

a) Auger Drilling
5.0
$ / Ft
$ N / A
b) Continuous Split Spoon Sample
0
$ / Sample
$ N / A
c) Shelby Tube Sample
0
$ / Sample
$ N / A
9. Borehole Sealing
225.0
$ / Ft
$
10. Borehole Reclamation
3
$ / B.Hole
$
11. Natural Moisture Content Test
0
$ / Test
$ N / A
12. Mechanical Analysis Test
0
$ / Test
$ N / A
13. Consolidation Test
0
$ / Test
$ N / A
14. Specific Gravity Test
0
$ / Test
$ N / A
15. Direct Shear Test
0
$ / Test
$ N / A
16. Fecal Coliform Test
0
$ / Test
$ N / A
17. Test Pit
0
$ / Cu.Ft
$ N / A
18. Level Survey
9.5
$ / Hr
$
19. Location Survey
0
$ / Hr
$ N / A
20. Geologist Time
8.0
$ / Hr
$
21. Field Technician Time
4.5
$ / Hr
$
22. Engineering Analysis Time
14.0
$ / Hr
$
23. Report Preparation Time
12.0
$ / Hr
$
24. Expert Witness Testimony Time
0
$ / Hr
$ N / A
25. Testimony Preparation Time
0
$ / Hr
$ N / A
26. Stand-By Time
3.0
$ / Hr
$
27. 4” Casing Installation
0
$ / Ft
$ N / A
28. Piezometer Installation
0
$ / Ft
$ N / A
TOTAL PRICE =
$

Attachment A - Site Example 5

· Rural: 30 miles to site.

· 3- Core borings to mine level.

· Depth to mine: 45 ft. Depth to bedrock: 15 ft.

Quantity
Cost / Unit
Total Cost
1. Travel Costs
100
$ / Mile
$
2. Mobilization/Demobilization
1
$ / Site
$
3. Additional Mob./Demob.
0
$ / Mile
$ N / A
4. Core Drilling (Vertical)
90.0
$ / Ft
$
5. Core Drilling (Angle)
0
$ / Ft
$ N / A
6. Air Rotary Drilling
0
$ / Ft
$ N / A
7. Reaming Coreholes
90.0
$ / Ft

8. Subsurface Soil Sampling

a) Auger Drilling
45.0
$ / Ft
$
b) Continuous Split Spoon Sample
0
$ / Sample
$ N / A
c) Shelby Tube Sample
0
$ / Sample
$ N / A
9. Borehole Sealing
135.0
$ / Ft
$
10. Borehole Reclamation
3
$ / B.Hole
$
11. Natural Moisture Content Test
0
$ / Test
$ N / A
12. Mechanical Analysis Test
0
$ / Test
$ N / A
13. Consolidation Test
0
$ / Test
$ N / A
14. Specific Gravity Test
0
$ / Test
$ N / A
15. Direct Shear Test
0
$ / Test
$ N / A
16. Fecal Coliform Test
0
$ / Test
$ N / A
17. Test Pit
0
$ / Cu.Ft
$ N / A
18. Level Survey
6.0
$ / Hr
$
19. Location Survey
0
$ / Hr
$ N / A
20. Geologist Time
6.0
$ / Hr
$
21. Field Technician Time
4.5
$ / Hr
$
22. Engineering Analysis Time
15.0
$ / Hr
$
23. Report Preparation Time
6.0
$ / Hr
$
24. Expert Witness Testimony Time
0
$ / Hr
$ N / A
25. Testimony Preparation Time
0
$ / Hr
$ N / A
26. Stand-By Time
0
$ / Hr
$ N / A
27. 4” Casing Installation
90.0
$ / Ft
$ N / A
28. Piezometer Installation
0
$ / Ft
$ N / A
TOTAL PRICE =
$

Attachment A - Site Example 6

· Rural: 100 miles to site

· Install 3 Piezometers at depths of 400 ft., 300 ft. and 100 ft.

· 6 in. diameter. Air Rotary

· Depth to coal seam: 400 ft. Depth to bedrock: 15 ft.

Quantity
Cost / Unit
Total Cost
1. Travel Costs
800
$ / Mile
$
2. Mobilization/Demobilization
1
$ / Site
$
3. Additional Mob./Demob.
100
$ / Mile
$ N / A
4. Core Drilling (Vertical)
0
$ / Ft
$ N / A
5. Core Drilling (Angle)
0
$ / Ft
$ N / A
6. Air Rotary Drilling
800
$ / Ft
$
7. Reaming Coreholes
0
$ / Ft
$ N / A
8. Subsurface Soil Sampling
0
a) Auger Drilling
0
$ / Ft
$ N / A
b) Continuous Split Spoon Sample
0
$ / Sample
$ N / A
c) Shelby Tube Sample
0
$ / Sample
$ N / A
9. Borehole Sealing
800
$ / Ft
$
10. Borehole Reclamation
3
$ / B.Hole
$
11. Natural Moisture Content Test
0
$ / Test
$ N / A
12. Mechanical Analysis Test
0
$ / Test
$ N / A
13. Consolidation Test
0
$ / Test
$ N / A
14. Specific Gravity Test
0
$ / Test
$ N / A
15. Direct Shear Test
0
$ / Test
$ N / A
16. Fecal Coliform Test
0
$ / Test
$ N / A
17. Test Pit
0
$ / Cu.Ft
$ N / A
18. Level Survey
1
$ / Hr
$
19. Location Survey
1
$ / Hr
$
20. Geologist Time
0
$ / Hr
$ N / A
21. Field Technician Time
40.0
$ / Hr
$
22. Engineering Analysis Time
0
$ / Hr
$ N / A
23. Report Preparation Time
0
$ / Hr
$ N / A
24. Expert Witness Testimony Time
0
$ / Hr
$ N / A
25. Testimony Preparation Time
0
$ / Hr
$ N / A
26. Stand-By Time
0
$ / Hr
$ N / A
27. 4” Casing Installation
0
$ / Ft
$ N / A
28. Piezometer Installation
800
$ / Ft
TOTAL PRICE =
$

Attachment A Example Site Summary Sheet

Cost / Site

Example Site 1
$
Example Site 2
$
Example Site 3
$
Example Site 4
$
Example Site 5
$
Example Site 6
$
TOTAL PRICE =
$

Attachment A Unit Price Summary Sheet

Cost / Unit

1. Travel Costs
$ / Mile
2. Mobilization/Demobilization
$ / Site
3. Additional Mobilization/Demobilization
$ / Mile
4. Core Drilling (Vertical)
$ / Ft
5. Core Drilling (Angle)
$ / Ft
6. Air Rotary Drilling
$ / Ft
7. Reaming Coreholes
$ / Ft

8. Subsurface Soil Sampling

a) Auger Drilling
$ / Ft
b) Continuous Split Spoon Sample
$ / Sample
c) Shelby Tube Sample
$ / Sample
9. Borehole Sealing
$ / Ft
10. Borehole Reclamation
$ / B.Hole
11. Natural Moisture Content Test
$ / Test
12. Mechanical Analysis Test
$ / Test
13. Consolidation Test
$ / Test
14. Specific Gravity Test
$ / Test
15. Direct Shear Test
$ / Test
16. Fecal Coliform Test
$ / Test
17. Test Pit
$ / Cu.Ft
18. Level Survey
$ / Hr
19. Location Survey
$ / Hr
20. Geologist Time
$ / Hr
21. Field Technician Time
$ / Hr
22. Engineering Analysis Time
$ / Hr
23. Report Preparation Time
$ / Hr
24. Expert Witness Testimony Time
$ / Hr
25. Testimony Preparation Time
$ / Hr
26. Stand-By Time
$ / Hr
27. 4” Casing Installation
$ / Ft
28. Piezometer Installation
$ / Ft

*Additional items/services shall be added as necessary to meet the needs of the Department upon mutual agreement of both parties.

File details come from the government source that posted it. Updated .