CAT3221J_1201200002024022203164.pdf

PDF 11 KB Posted

Attached to
CONSOLE SHIP CONTROL Federal contract opportunity
Solicitation number
70Z08024QAF046
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is a solicitation for the overhaul of a ship control console. The United States Coast Guard Surface Forces Logistics Center requires inspection, reporting, and potential repair of one ship control console. National stock number is 2030-01-612-7381, part number is 60576, and original equipment manufacturer is Allied Systems Company. Quotes are due by February 28, 2024 at 0900 hours Eastern time and shall include separate line items for inspection cost and firm fixed repair price. Delivery is required by May 21, 2024 to the Coast Guard facility in Baltimore. The contract will be awarded to the lowest priced technically acceptable offer. The document outlines packaging and marking requirements, inspection and acceptance criteria, and various flow down clauses pertaining to equal employment, trafficking in persons, and other regulatory requirements.

View the file

Other files for this federal contract opportunity

Other files attached to CONSOLE SHIP CONTROL, newest first.
File Type Posted
Mil-Std 2073.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME CONSOLE,SHIP CONTROL

STOCK NUMBER 2030-01-612-7381

PART NUMBER 60576

USED ON 210 WMEC

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

This description covers the requirements for contractor inspection, estimate, and overhaul of the following cited SHIP CONTROL CONSOLE.

NSN: 2030-01-612-7381

Item Name: Console, Ship Control Part Number: 60576

Application: WMEC 210 Class Allied D5700CT Davit Assembly. Original Equipment Manufacturer: Allied Systems Company, Inc.

The contractor shall immediately notify the Coast Guard Contracting Officer if the make and/or model delivered for overhaul does not conform to the Ship Control Console cited above.

Requirements: The contractor shall provide all labor and materials to perform overhaul services on the Control Console as follows:

PRELIMINARY INSPECTION REOUIREMENTS:

Preliminary disassembly and inspection of the Control Console shall be conducted in accordance with Original Equipment Manufacturer (OEM) recommended procedures to determine the total estimated cost for repair including material, labor, testing, preservation, packing and marking costs.

A detailed estimate shall be submitted to the Coast Guard Contracting Officer (CG KO) for review and approval prior to the start of any repair or order of material. The estimate shall include: stock numbers, serial numbers, part numbers, new parts required with prices, labor rate, labor hours required, and a total estimate for all required services. The contractor shall also provide the replacement cost of a new Control Console for comparison to the overhaul cost. The CG KO shall determine the disposition of any Control Console delivered for inspection that is found to be not suitable for repair for whatever reason.

Upon acceptance of the estimate and authorization to proceed by the CG KO, the Control Console shall be overhauled in accordance with OEM recommended procedures and as follows:

OVERHAUL REQUIREMENTS:

Each Control Console shall be overhauled to a condition, which shall restore the operating and performance characteristics to the "ORIGINAL" design and technical specifications. Overhaul shall be performed in accordance with the original equipment manufacturer (OEM) specifications and standards. All repair parts shall be genuine OEM manufactured parts. All replacement parts used in the overhaul shall be new OEM parts or parts of equal or better quality. Reclaimed or recycled parts are not acceptable and shall not be used.

OUALITY ASSURANCE:

Following completion of overhaul, the contactor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy for each unit shall be forwarded to the Coast Guard Contracting Officer.

Example of Marking Layout:

NATIONAL STOCK NUMBER: 2030-01-612-7381

ITEM NAME: Console, Ship Control

PART NUMBER: 60576

SERIAL NUMBER: as applicable GOVERNMENT ORDER NUMBER: as applicable DATE OF REPAIR: as applicable Coast Guard SFLC Material, Condition Code ?A".

SHELF LIFE CD 0

This description covers the requirements for contractor inspection, estimate, and overhaul of the following cited SHIP CONTROL CONSOLE.

NSN: 2030-01-612-7381

Item Name: Console, Ship Control Part Number: 60576

Application: WMEC 210 Class Allied D5700CT Davit Assembly. Original Equipment Manufacturer: Allied Systems Company, Inc.

The contractor shall immediately notify the Coast Guard Contracting Officer if the make and/or model delivered for overhaul does not conform to the Ship Control Console cited above.

Requirements: The contractor shall provide all labor and materials to perform overhaul services on the Control Console as follows:

PRELIMINARY INSPECTION REOUIREMENTS:

Preliminary disassembly and inspection of the Control Console shall be conducted in accordance with Original Equipment Manufacturer (OEM) recommended procedures to determine the total estimated cost for repair including material, labor, testing, preservation, packing and marking costs.

A detailed estimate shall be submitted to the Coast Guard Contracting Officer (CG KO) for review and approval prior to the start of any repair or order of material. The estimate shall include: stock numbers, serial numbers, part numbers, new parts required with prices, labor rate, labor hours required, and a total estimate for all required services. The contractor shall also provide the replacement cost of a new Control Console for comparison to the overhaul cost. The CG KO shall determine the disposition of any Control Console delivered for inspection that is found to be not suitable for repair for whatever reason.

Upon acceptance of the estimate and authorization to proceed by the CG KO, the Control Console shall be overhauled in accordance with OEM recommended procedures and as follows:

OVERHAUL REQUIREMENTS:

Each Control Console shall be overhauled to a condition, which shall restore the operating and performance characteristics to the "ORIGINAL" design and technical specifications. Overhaul shall be performed in accordance with the original equipment manufacturer (OEM) specifications and standards. All repair parts shall be genuine OEM manufactured parts. All replacement parts used in the overhaul shall be new OEM parts or parts of equal or better quality. Reclaimed or recycled parts are not acceptable and shall not be used.

OUALITY ASSURANCE:

Following completion of overhaul, the contactor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy for each unit shall be forwarded to the Coast Guard Contracting Officer.

Example of Marking Layout:

NATIONAL STOCK NUMBER: 2030-01-612-7381

ITEM NAME: Console, Ship Control

PART NUMBER: 60576

SERIAL NUMBER: as applicable GOVERNMENT ORDER NUMBER: as applicable DATE OF REPAIR: as applicable Coast Guard SFLC Material, Condition Code ?A".

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

OVERHAUL DESCRIPTION

PACKAGING AND MARKING FOR SHIPMENT:

X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

2030-01-612-7381

CONSOLE,SHIP CONTROL

60576

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

ALLIED SYSTEMS COMPANY INC DBA ALLI

21433 SW OREGON ST

SHERWOOD, OR 97140-9769

KELLY.WILSON@ALLIEDSYSTEMS.COM

503-825-3426

WRITTEN BY:

DATE :

MARK LOVINGOOD

22 FEB 24

Cost Estimate for Overhaul NOT TO EXCEED: $45,616.64

File details come from the government source that posted it. Updated .