CAT3221J_1201200002023071780323.pdf

PDF 16 KB Posted

Attached to
PUMP UNIT CENTRIFUGAL Federal contract opportunity
Solicitation number
70Z08023QZC031
Issued by
Department of Homeland Security US Coast Guard

About this file

This document outlines requirements for the overhaul of a centrifugal pump unit to be procured by the U.S. Coast Guard under solicitation number 70Z08023QZC031. The contractor shall disassemble, clean, inspect, and restore the Grundfos Model CRN-32-4 centrifugal pump and electric motor assembly to original operating specifications. All replacement parts must be new OEM components, and material certifications are required for corrosion-resistant parts. Testing shall be performed per OEM standards and witnessed by Coast Guard quality assurance personnel. The unit must be preserved and packaged to prevent deterioration for two years, with markings clearly identifying the stock number, item name, and other details. Acceptance will occur at destination contingent upon verification of specifications and preservation requirements. The estimated cost for overhaul is $6,719.13 not to exceed, compared to $6,719.13 for a new pump unit. The contractor shall guarantee the item for two years after delivery.

View the file

Other files for this federal contract opportunity

Other files attached to PUMP UNIT CENTRIFUGAL, newest first.
File Type Posted
Mil-Std 2073.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME PUMP UNIT,CENTRIFUGAL

STOCK NUMBER 4320-01-477-8625

PART NUMBER 97517959

USED ON 87' WPB FIREMAIN SYSTEM

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

PRELIMINARY INSPECTION REQUIREMENTS

The Contractor shall disassemble, clean and inspect the Model CRN-32-4 Grundfos centrifugal pump and electric motor assembly to obtain the overall condition and determine the estimated cost of overhaul. A detailed report and repair plan including material, labor, overhaul, testing, preservation, packaging, packing, marking, bar-coding and crate repair or replacement costs shall be submitted to the Contracting Officer for approval. Overhaul is intended to restore the Centrifugal Pump and electric motor assembly to a condition that is equal to that of a new Grundfos Model CRN-32-4 centrifugal pump and ellectric motor assembly. Overhaul requirements include overhauling or replacing the electric motor to OEM standards and specifications. No further work shall be accomplished until the report is approved in writing by the Contracting Officer.

The inspection report and repair plan shall consist of, as a minimum, the following information:

1. Date of Inspection

2. Identification of centrifugal pump / electric motor assembly by serial number, part number and stock number.

3. Condition of shipping crate and any cost of repair or replacement.

4. A list of parts and materials recommended for replacement with individual pricing.

5. Cost of overhaul labor broke down by number of hours and hourly rate.

6. Comments if any pertaining to unusual observations during inspection and disassembly.

MATERIAL CERTIFICATIONS:

Material certifications shall be submitted for any components designed to be exposed to corrosive fluids including salt water to validate design compliance and suitability for intended use. This pump is equipped with a Duplex Stainless Steel shaft (EN 1.4462) that has been approved by the OEM.

This shaft is magnetic so a material confiormance certificate from the OEM will be needed for verification.

TEST EQUIPMENT CALIBRATION

All test equipment used on this shall contract shall be certified and traceable to NIST.

OVERHAUL REQUIREMENTS:

The Centrifugal Pump and electric motor assembly shall be overhauled to a condition which shall restore the operating and performance characteristics to the "ORIGINAL" design and technical specifications. Overhaul shall be performed in accordance with Grundfos Pumps specifications and standards, which are proprietary to Grundfos Pumps. The electric motor shall be restored to its original condition per OEM standards and specifications. All Replacement Parts - All replacement parts used for this specification shall be new Original Equipment Manufacturer (OEM) parts. Reclaimed, recycled or aftermarket parts are not acceptable and shall not be used. The overhaul facility or any sub-contractors shall not manufacture parts to be used on overhauled assemblies. Parts not normally manufactured by the OEM such as seals, ball / roller type bearings, gaskets etc. shall be equal to the quality of such parts originally installed by the OEM, but are not required to be supplied by the OEM. After completion of all repairs, the Contractor shall perform standard production tests and inspections to assure maximum design performance these test include the electric motor per OEM requirements. A final inspection report shall be submitted to the Contracting Officer. This report shall depict the final condition of the Centrifugal Pump / electric motor assembly after all repair work has been completed.

QUALITY ASSURANCE:

US Coast Guard SFLC quality assurance personnel will witness OEM standard testing. All dimensions and required clearances will be verified to the OEM drawings, specifications and inspection reports. The Contractor shall have the latest versions of the drawings and specifications available for the scheduled inspections. The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations or tests normally employed by the Contractor to assure the quality of the product. The following are required and will be monitored by a Government Quality Assurance Representative.

a. Visual inspection of all components.

b. Tool calibration verification.

c. Witness all standard production testing per OEM requirements. OEM requirements shall be verified by QA reqpresentitive.

d. View material certifications.

e. Witness preservation, packaging, packing, and marking.

PACKAGING:

Each overhauled Centrifugal Pump shall be packaged in a substantial wooden box constructed from 3/4 inch plywood and 3/4 inch 1x4 boards. Flake board, particle board or OSB type wood shall not be used. Box shall be assembled using grip type (ring) nails or screws. The lid of the wooden box shall be screwed using corrosion proof wood screws. Each overhauled Centrifugal Pump shall be packed in a protective envelope using water-vapor-proof, greaseproof, flexible, heat sealable barrier paper in accordance with MIL- PRF-131, Class 3. All open ports shall be sealed using waterproof caps or covers to prevent the intrusion of moisture and other contaminants. Each pump shall be packed and secured to prevent movement during multiple shipments and warehouse handling. The Contractor shall place four to five ounces of desiccant packs conforming to MIL-D-3464, Type 1 inside the

SHELF LIFE CD 0

PRELIMINARY INSPECTION REQUIREMENTS

The Contractor shall disassemble, clean and inspect the Model CRN-32-4 Grundfos centrifugal pump and electric motor assembly to obtain the overall condition and determine the estimated cost of overhaul. A detailed report and repair plan including material, labor, overhaul, testing, preservation, packaging, packing, marking, bar-coding and crate repair or replacement costs shall be submitted to the Contracting Officer for approval. Overhaul is intended to restore the Centrifugal Pump and electric motor assembly to a condition that is equal to that of a new Grundfos Model CRN-32-4 centrifugal pump and ellectric motor assembly. Overhaul requirements include overhauling or replacing the electric motor to OEM standards and specifications. No further work shall be accomplished until the report is approved in writing by the Contracting Officer.

The inspection report and repair plan shall consist of, as a minimum, the following information:

1. Date of Inspection

2. Identification of centrifugal pump / electric motor assembly by serial number, part number and stock number.

3. Condition of shipping crate and any cost of repair or replacement.

4. A list of parts and materials recommended for replacement with individual pricing.

5. Cost of overhaul labor broke down by number of hours and hourly rate.

6. Comments if any pertaining to unusual observations during inspection and disassembly.

MATERIAL CERTIFICATIONS:

Material certifications shall be submitted for any components designed to be exposed to corrosive fluids including salt water to validate design compliance and suitability for intended use. This pump is equipped with a Duplex Stainless Steel shaft (EN 1.4462) that has been approved by the OEM.

This shaft is magnetic so a material confiormance certificate from the OEM will be needed for verification.

TEST EQUIPMENT CALIBRATION

All test equipment used on this shall contract shall be certified and traceable to NIST.

OVERHAUL REQUIREMENTS:

The Centrifugal Pump and electric motor assembly shall be overhauled to a condition which shall restore the operating and performance characteristics to the "ORIGINAL" design and technical specifications. Overhaul shall be performed in accordance with Grundfos Pumps specifications and standards, which are proprietary to Grundfos Pumps. The electric motor shall be restored to its original condition per OEM standards and specifications. All Replacement Parts - All replacement parts used for this specification shall be new Original Equipment Manufacturer (OEM) parts. Reclaimed, recycled or aftermarket parts are not acceptable and shall not be used. The overhaul facility or any sub-contractors shall not manufacture parts to be used on overhauled assemblies. Parts not normally manufactured by the OEM such as seals, ball / roller type bearings, gaskets etc. shall be equal to the quality of such parts originally installed by the OEM, but are not required to be supplied by the OEM. After completion of all repairs, the Contractor shall perform standard production tests and inspections to assure maximum design performance these test include the electric motor per OEM requirements. A final inspection report shall be submitted to the Contracting Officer. This report shall depict the final condition of the Centrifugal Pump / electric motor assembly after all repair work has been completed.

QUALITY ASSURANCE:

US Coast Guard SFLC quality assurance personnel will witness OEM standard testing. All dimensions and required clearances will be verified to the OEM drawings, specifications and inspection reports. The Contractor shall have the latest versions of the drawings and specifications available for the scheduled inspections. The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations or tests normally employed by the Contractor to assure the quality of the product. The following are required and will be monitored by a Government Quality Assurance Representative.

a. Visual inspection of all components.

b. Tool calibration verification.

c. Witness all standard production testing per OEM requirements. OEM requirements shall be verified by QA reqpresentitive.

d. View material certifications.

e. Witness preservation, packaging, packing, and marking.

PACKAGING:

Each overhauled Centrifugal Pump shall be packaged in a substantial wooden box constructed from 3/4 inch plywood and 3/4 inch 1x4 boards. Flake board, particle board or OSB type wood shall not be used. Box shall be assembled using grip type (ring) nails or screws. The lid of the wooden box shall be screwed using corrosion proof wood screws. Each overhauled Centrifugal Pump shall be packed in a protective envelope using water-vapor-proof, greaseproof, flexible, heat sealable barrier paper in accordance with MIL- PRF-131, Class 3. All open ports shall be sealed using waterproof caps or covers to prevent the intrusion of moisture and other contaminants. Each pump shall be packed and secured to prevent movement during multiple shipments and warehouse handling. The Contractor shall place four to five ounces of desiccant packs conforming to MIL-D-3464, Type 1 inside the envelope to absorb moisture during storage.

A copy of the material certifications shall be be packaged inside the protective envelope.

MARKINGS:

NOTE: ALL PREVIOUS MARKINGS AND / OR QUALITY ASSURANCE DECALS SHALL BE

COMPLETELY REMOVED FROM THE REUSABLE SHIPPING CONTAINER PRIOR TO THE

APPLICATION OF ANY NEW MARKINGS. THE STENCIL SHALL BE APPLIED DIRECTLY ON THE

CONTAINER AND A MINIMUM OF 1/2 INCH HEIGHT BLACK BLOCK CHARACTERS ON A HIGHLY

CONTRASTING PAINTED BACKGROUND, USING PERMANENT WATERPROOF INK OR ENAMEL

PAINT.

NATIONAL STOCK NUMBER: 4320-01-477-8625

ITEM NAME: CENTRIFUGAL PUMP

PART NUMBER: 98345950

CONTRACT NUMBER: SEE CONTRACT

SERIAL NUMBER: SEE CENTRIFUGAL PUMP

SHIPPING WEIGHT: CONTRACTOR PROVIDE

THE FOLLOWING STATEMENT: COAST GUARD SFLC MATERIAL

CONDITION "A", 1 EA

Coast Guard Acceptance - Acceptance will be made at destination by a government representative. Acceptance will be contingent upon representative's verification of no damage in transit, correctness and completeness of order and Contractor's conformance to preservation, packaging, packing, marking and bar-coding requirements.

Cost to open, inspect and report. $875.00 Estimated cost for new pump: $6,719.13 envelope to absorb moisture during storage.

A copy of the material certifications shall be be packaged inside the protective envelope.

MARKINGS:

NOTE: ALL PREVIOUS MARKINGS AND / OR QUALITY ASSURANCE DECALS SHALL BE

COMPLETELY REMOVED FROM THE REUSABLE SHIPPING CONTAINER PRIOR TO THE

APPLICATION OF ANY NEW MARKINGS. THE STENCIL SHALL BE APPLIED DIRECTLY ON THE

CONTAINER AND A MINIMUM OF 1/2 INCH HEIGHT BLACK BLOCK CHARACTERS ON A HIGHLY

CONTRASTING PAINTED BACKGROUND, USING PERMANENT WATERPROOF INK OR ENAMEL

PAINT.

NATIONAL STOCK NUMBER: 4320-01-477-8625

ITEM NAME: CENTRIFUGAL PUMP

PART NUMBER: 98345950

CONTRACT NUMBER: SEE CONTRACT

SERIAL NUMBER: SEE CENTRIFUGAL PUMP

SHIPPING WEIGHT: CONTRACTOR PROVIDE

THE FOLLOWING STATEMENT: COAST GUARD SFLC MATERIAL

CONDITION "A", 1 EA

Coast Guard Acceptance - Acceptance will be made at destination by a government representative. Acceptance will be contingent upon representative's verification of no damage in transit, correctness and completeness of order and Contractor's conformance to preservation, packaging, packing, marking and bar-coding requirements.

Cost to open, inspect and report. $875.00 Estimated cost for new pump: $6,719.13

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for

90 days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

PACKAGING AND MARKING FOR SHIPMENT:

X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

4320-01-477-8625

PUMP UNIT,CENTRIFUGAL

97517959

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

GRUNDFOS PUMPS CORPORATION

2555 CLOVIS AVENUE

CLOVIS, CALIFORNIA 93613

PHONE: 559-292-8000

PIEDMONT PUMP & PRODUCTS INC.

410 PILOTTOWN ROAD

LEWES, DE 19958-1295

PPP@PIEDMONTPUMP.COM,

410-746-6914

TATE ENGINEERING SYSTEMS INC.

3921 VERO ROAD

BALTIMORE, MARYLAND 21227

PHONE: 410-242-8800

EMAILUS@TATE.COM

410-242-8800

WRITTEN BY:

DATE :

CHRISTOPHER SABOE

17 JUL 23

Cost Estimate for Overhaul NOT TO EXCEED: $6,719.13

File details come from the government source that posted it. Updated .