CAT3221J_1201200002023031977231.pdf
PDF 6 KB Posted
- Attached to
- TURBO CHARGERS WMEC Federal contract opportunity
- Solicitation number
- 70Z08023-Q-AG037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Mil-Std 2073.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME TURBO SUPERCHARGER,NGINE,NON-AIRCRAFT
STOCK NUMBER 2950-01-118-7979
PART NUMBER 22602128-2
USED ON 270 WMEC A & B CLASS MAIN DIESEL ENGINES
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Disassemble, Inspect, prepare condition/test reports, overhaul, reassemble, test, preserve, package, pack and mark the Model 165 Turbocharger in accordance with SFLC Overhaul Specification R-251-120 Revsion H dated 06/2008.
Note: SFLC Overhaul Specification R-251-120 for all three MEC PL turbocharger overhauls has been superceded and split into separate turbocharger overhaul specifications for each turbocharger. See updated Work Items in the Despec database under MEC Repair Specifications.
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 0
FOR OFFICIAL USE ONLY
PACKAGING AND MARKING FOR SHIPMENT:
X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
2950-01-118-7979
TURBO SUPERCHARGER,NGINE,NON-AIRCRAFT
22602128-2
PRESERVATION / PACKAGING:
X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
FAIRBANKS MORSE DEFENSE
701 WHITE AVE
BELOIT, WI 53511-5447
LYNN.ARNOLD@FMDEFENSE.COM
JAMES.FLANNERY@FMDEFENSE.COM
WRITTEN BY:
DATE :
MARK LOVINGOOD
19 MAR 23
Cost Estimate for Overhaul NOT TO EXCEED: $145,499
File details come from the government source that posted it. Updated .