RFQ for 5050 Carpet.pdf

PDF 339 KB Posted

Attached to
Carpet for Chambers 5050 Trenton Federal contract opportunity
Solicitation number
carpetreplacement5050
Issued by
Administrative Office of the U.S. Courts

View the file

Other files for this federal contract opportunity

Other files attached to Carpet for Chambers 5050 Trenton, newest first.
File Type Posted
RFQ for Carpet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States District Court

District of New Jersey

Request for Quotation

Request Date: December 15, 2022

Deadline for Quotes: December 29, 2022

Project: Cyclical Carpet Replacement Chambers 5050 Clarkson S. Fisher U.S. Courthouse

Requirements:

o This is a request for quotation (RFQ) for services in connection with the U.S. District

Court, District of New Jersey cyclical carpet replacement in the Clarkson S. Fisher U.S.

Courthouse (chambers 5050).

o This is a request for open market labor pricing. Carpet can be ordered under Federal

Supply Schedule contract # GS-03F014AA.

o All contractors must agree to the terms and conditions set below.

o A fixed price award from this RFQ will be made based on the lowest priced, technically acceptable offer.

o The chamber is approximately 1900 square feet. Square footage is approximate and field measurements are required. Please contact Amber Barcliff

(amber_barcliff@njd.uscourts.gov) to schedule a site visit. Changes cannot be made after the contract is awarded.

o The contractor must be willing to start work based on a Purchase Order. No down payments or advances will be allowed.

o All work requires escorted access to judiciary facilities. In accordance with Clause 3-3, Contractor employees are subject to security checks including background investigations. If the contractor is unable to supply enough acceptable employees to work on this project, The judiciary may terminate the contract by default.

o Contractor must submit the names, dates of birth, and social security numbers of all onsite workers at least one week prior to the start of the work.

o All quotes shall include estimated times for completion and number of workers needed to accomplish the work.

o Proposal must include the total cost to complete the scope of work in accordance with this RFQ. No additional charges will be accepted.

o Contractors will be responsible for any damage to the building, furnishing, or carpet during the course of the work being performed.

mailto:amber_barcliff@njd.uscourts.gov o **COVID-19 safety protocols are to be followed at all times in the building. Masks are currently not required but will become mandatory if the County transmission rates rise.

o Award of contract and acceptance of work performed will be dependent on approval from the General Services Administration and the court. Please note, GSA requires a

Certificate of Liability Insurance naming GSA as the beneficiary.

Quotes:

o Please submit quotes via email to: procurement@njd.uscourts.gov and copy me at Amber_barcliff@njd.uscourts.gov. All proposals should detail how the work will be accomplished and acknowledge compliance with the RFQ. Questions concerning this RFQ should be addressed to Amber Barcliff – Email: amber_barcliff@njd.uscourts.gov.

Statement of Work:

The scope of work for the RFQ includes all labor and materials including supervision, tools, equipment, transportation, and incidentals. No equipment, materials, or services of any kind shall be provided by the court. Furniture moves will be arranged by the court and should not be included in the quote.

o The contractor will remove the old carpet, padding, and cove base where necessary, clean the floor in preparation for new carpet, and install the new carpet in accordance with the manufacturer’s recommendations ensuring patterns are aligned and seams are tight.

o The contractor will order, receive, and store the new carpet and cove base until installation.

o The carpet selection for the entire chambers is Manufacturer: Bentley Style: Milano KR410 W/KR302 (Bentley GSA contract # GS-03F-014AA) – sample to be provided upon request.

o The cove base selection is TBD.

o Any chemicals used during the carpet installation must be low odor and non-toxic.

o If requested, the contractor shall be prepared to provide the Material Safety Data for all chemicals proposed to be furnished as a result of this bid.

o The court freight elevator is sensitive to excessive weight, movements, and length of doors being open. Crew must be careful when using the freight elevator to transport carpet and equipment. In the event the elevator shuts down, the crew must be able to carry the carpet up the stairs.

o The contractor will work at the court’s convenience and the work will be scheduled accordingly.

o The contractor will clean up and remove any debris or trash associated with the installation including left over carpet. All waste will be disposed offsite.

mailto:amber_barcliff@njd.uscourts.gov o The Contractor will perform thorough vacuuming of the area after the carpet installation is complete, so the area is ready for furniture installation.

o All additional work necessary to complete cyclical carpet removal and installation and to meet industry and manufacturers standards and to the satisfaction and approval of the General Services Administration and the Court; and all additional work necessary to meet all local building, fire and safety codes, and the Terms and Conditions set below.

Applicable Judiciary Terms and Conditions

Clause B-5, Clauses Incorporated by Reference

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the contracting officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

http://www.uscourts.gov/procurement.aspx.

Clause 3-3, Provisions, Clauses, Terms and Conditions - Small Purchases

Clause 6-20, Insurance – Work on or Within a Judiciary Facility

Clause 3-300, Registration in the System for Award Management (SAM)

Clause 3-305, Payment by Electronic Funds Transfer – System for Award Management (SAM) Registration

Clause 3-310, Payment by Electronic Funds Transfer – Other Than System for Award Management (SAM) Registration

Provision B-1, Solicitation Provisions Incorporated by Reference

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the contracting officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:

http://www.uscourts.gov/procurement.aspx

Provision 2-70, Site Visit

Provision 3-5, Taxpayer Identification and Other Offeror Information

Provision 4-1, Type of Contract

Incorporation of Department of Labor Wage Rate Determination http://www.uscourts.gov/procurement.aspx http://www.uscourts.gov/procurement.aspx

Clause 3-160, Service Contract Labor Standards

Each service employee employed in the performance of this contract by the contractor or any subcontractor shall be paid not less than the minimum monetary wages and shall be furnished fringe benefits in accordance with the wages and fringe benefits determined by the Secretary of Labor or an authorized representative, as specified in the wage determination attached below.

12/15/22, 10:29 AM SAM.gov https://sam.gov/wage-determination/NJ20220035/6 1/14

"General Decision Number: NJ20220035 11/04/2022

Superseded General Decision Number: NJ20210035

State: New Jersey

Construction Type: Building

County: Mercer County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. | https://sam.gov/wage-determination/NJ20220035/6 2/14

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date 0 01/07/2022 1 02/25/2022 2 06/17/2022 3 08/05/2022 4 09/09/2022 5 09/16/2022 6 11/04/2022

ASBE0089-004 07/01/2022

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 51.90 36.80

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

BRNJ0002-013 05/01/2021

Rates Fringes https://sam.gov/wage-determination/NJ20220035/6 3/14

Bricklayer.....................$ 45.20 33.26

Work on high stacks: 22% per hour additional.

BRNJ0007-015 06/06/2016

MERCER COUNTY (north of Route 33)

Rates Fringes

Tile finisher..................$ 40.17 25.88 Tile setter....................$ 46.50 31.38

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

BRNJ0007-018 06/06/2016

MERCER COUNTY (south of Route 33)

Rates Fringes

Tile finisher..................$ 40.17 25.88 Tile setter....................$ 46.50 31.38

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

CARP0006-009 05/01/2022

Rates Fringes

CARPENTER (Scaffold Builder).....$ 53.30 58%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0006-011 05/01/2022

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging and Formwork....................$ 53.30 58% https://sam.gov/wage-determination/NJ20220035/6 4/14

CARP0715-007 05/01/2020

Rates Fringes

Millwright.....................$ 51.58 58%+0.25

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0269-016 01/01/2019

Rates Fringes

ELECTRICIAN

Cable Splicer...............$ 52.71 61.93% Electrician (Includes Low Voltage Wiring).............$ 50.20 61.93%

ELEV0005-004 01/01/2022

Rates Fringes

Elevator mechanic..............$ 63.52 36.885+a+b

A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

ENGI0825-020 07/01/2021

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 56.02 31.80

GROUP 2.....................$ 54.43 31.80

GROUP 3.....................$ 52.52 31.80

https://sam.gov/wage-determination/NJ20220035/6 5/14

GROUP 4.....................$ 50.89 31.80

GROUP 5.....................$ 49.18 31.80

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic https://sam.gov/wage-determination/NJ20220035/6 6/14

GROUP 5:

Oiler

* IRON0399-016 07/01/2022

Rates Fringes

IRONWORKER

Reinforcing.................$ 50.54 36.10 Structural, Ornamental, Rigger......................$ 51.54 36.10

LABO0008-001 05/01/2011

Rates Fringes

Asbestos Removal Laborer.........$ 28.37 21.62

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

LABO0222-006 07/01/2012

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 29.85 23.07

LABO0222-009 07/01/2012

https://sam.gov/wage-determination/NJ20220035/6 7/14

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Pipelayer, Power Tool Operator and Screedman...................$ 29.35 23.07

* PAIN0711-017 05/01/2022

Rates Fringes

Glazier........................$ 49.48 12%+22.70

Work welding or using a cutting torch: $1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

* PAIN0711-018 06/05/2022

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 42.16 27.06

PAIN0711-020 05/01/2017

Rates Fringes

PAINTER (Brush & Roller).........$ 39.25 22.66 PAINTER (Paperhanger)............$ 40.19 22.72 PAINTER (Spray)..................$ 40.28 19.98

PLAS0008-007 05/01/2021

Rates Fringes

Plasterer......................$ 38.37 31.64

PLAS0592-036 05/01/2022

https://sam.gov/wage-determination/NJ20220035/6 8/14

CEMENT MASON/CONCRETE FINISHER...$ 46.71 34.22

PLUM0009-016 07/01/2021

MERCER COUNTY (south of a line drawn from the point at which Rt. 602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.))

Rates Fringes

PIPEFITTER (Including HVAC Pipe Installation)...............$ 52.34 42.28 Service and Repair..........$ 37.48 21.08 PLUMBER (Excluding HVAC Pipe Installation)....................$ 52.34 42.28 Service and Repair..........$ 37.48 21.08

PLUM0024-009 05/01/2022

MERCER COUNTY (north of a line drawn from the point at which Rt. 602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.)):

Rates Fringes

PLUMBER, Excludes HVAC Pipe Installation.....................$ 58.29 39.90

PLUM0475-010 05/01/2018

MERCER COUNTY (north of a line drawn from point at which Rt.

602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.)):

https://sam.gov/wage-determination/NJ20220035/6 9/14

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation................$ 49.48 38.84

ROOF0030-027 05/01/2022

Rates Fringes

Roofer

SHINGLES....................$ 31.25 21.75

SLATE AND TILE..............$ 34.25 21.75

ALL OTHER WORK..............$ 41.48 33.37

Mopper, and operator of felt-laying machine: $.50 per hour additional.

Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.

PAID HOLIDAY:

The last working day before Christmas, to be paid at the rate of four hours pay.

SFNJ0669-003 04/01/2022

MERCER COUNTY (does not include the town of Trenton)

Rates Fringes

Sprinkler fitter (Fire Sprinklers)......................$ 52.19 32.15

SFNJ0692-002 05/01/2021

Within 15 miles beyond the city limits of Philadelphia.

Rates Fringes

Sprinkler fitter (Fire Sprinklers)......................$ 60.83 30.34

SHEE0027-009 06/01/2021

https://sam.gov/wage-determination/NJ20220035/6 10/14

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 53.12 43.62

TEAM0469-004 05/01/2022

Rates Fringes

Truck drivers:

Dump Truck..................$ 44.81 36.775 Off the Road Truck..........$ 44.96 36.775

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

PAID HOLIDAYS:

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

VACATION PAY CREDIT:

Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave https://sam.gov/wage-determination/NJ20220035/6 11/14 for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the https://sam.gov/wage-determination/NJ20220035/6 12/14 most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

https://sam.gov/wage-determination/NJ20220035/6 13/14

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

https://sam.gov/wage-determination/NJ20220035/6 14/14

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"