This solicitation is for renovation work at the Carbella Campground and Day Use Site. Required work includes site grading, road and parking area surfacing, relocating an existing vault toilet and installing a new vault toilet, placing camp pad accessories, topsoil, and seed. The solicitation was issued by the Department of the Interior Bureau of Land Management as solicitation number 140L3620R0003. Responses are due based on the standard solicitation schedule.
Work will involve site grading, crushed aggregate base materials, a new vault toilet installation, concrete parking curbs, camp pad accessories including picnic tables, fire rings and food storage lockers, and seeding. Specifications cover temporary facilities and controls, watering, grading, compaction testing, miscellaneous site items, and materials requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3620R0003.pdf | ||
| Davis Bacon Wage Rates.pdf | ||
| PP Questionnaire.pdf | ||
| CARBELLA DRAWINGS_signed.pdf | ||
| BID SCHEDULE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CARBELLA CAMPGROUND RENOVATION
SPECIFICATION INDEX
General Information and Requirements........................Section MT-01009
Temporary Facilities and Controls...........................Section MT-01500
Watering....................................................Section MT-02201
Site Grading................................................Section MT-02213
Crushed Aggregate Base Materials............................Section MT-02233
Miscellaneous Project Site Items............................Section MT-02878
Seeding.....................................................Section MT-02933
SECTION MT-01009
GENERAL INFORMATION AND REQUIREMENTS
GENERAL INFORMATION AND REQUIREMENTS 05/20
MT-01009-1
PART 1: GENERAL
1.01 SUMMARY:
A. Description of Work: Furnishing labor, equipment, supplies, and materials, to renovate Carbella Campground and Day Use Site. Work to include but not limited to: site grading and surfacing the site road, access loops and parking areas, moving an existing toilet and placing atop of a new vault, as well as placing a new vault toilet near the boat launch area. Work also includes the placement of all camp pad accessories, topsoil and seed.
B. Location: Work under this Contract is located in Park County, Montana.
Work locations are shown on the drawings.
1.02 REFERENCES:
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms:
Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor from the following:
AASHTO American Association of State Highway and Transportation
Officials 444 North Capitol Street N.W., Suite 225 Washington, DC 20001
AISC American Institute of Steel Construction 400 North Michigan Avenue Chicago, IL 60611
ANSI American National Standards Institute 1430 Broadway New York, NY 10018
ASTM American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103
AWS American Welding Society, Inc.
P.O. Box 351040 Miami, FL 33135
CRSI Concrete Reinforcing Steel Institute 933 North Plum Grove Road Schamberg, IL 60173-4758
MT-01009-2
FP Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects Superintendent of Documents Government Printing Office Washington, DC 20402
Fed. Spec. Federal Specification/Standard General Services Administration Specifications Branch Room 6039, GSA Building Seventh and D Streets, S.W.
Washington, DC 20407
MDT Standard Specifications for Road and Bridge Construction, 1995
Edition Montana Department of Transportation Contract Plans Section 2701 Prospect Avenue Helena, MT, 59620
MUTCD Manual on Uniform Traffic Control Devices for Streets and
Highways Superintendent of Documents Government Printing Office Washington, DC 20402
OSHA Occupational Safety and Health Administration's Standards U.S. Department of Labor Occupational Safety and Health Administration Denver Area Office 333 West Colfax Avenue Denver, CO 80204
WWPA West Coast Lumber Inspection Bureau 1500 Yeon Building Portland, OR 97204
*Federal Specifications and catalogs may be obtained at Business Service Centers of Regional Offices of the General Services Administration.
(Washington, DC; Boston, MA; New York, NY; Philadelphia, PA; Atlanta, GA;
Chicago, IL; Kansas City, MO; Fort Worth, TX; Denver, CO; San Francisco, CA;
and Auburn, WA.)
1.03 DEFINITIONS:
A. Approvals: Approval of the submittal is an indication that the
Contractor's submittal has been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Government’s attention in writing. After approval of an item, the Contractor may submit a substitute for approval
MT-01009-3
when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
1.04 SUBMITTAL:
A. Scope: Submittals include, but are not limited to the following: design computations, shop drawings, manufacturer’s literature, as-built drawings, samples, and maintenance manuals.
B. Requirements: Refer to specifications for submittal required. Allow at least 5 working days for review. Submittals shall be delivered to the Contracting Officer or his/her appointed representative. All submittals shall be neatly bound and delivered prior to any work. Long lead times are expected for camp pad accessories. These items shall be submitted for approval within 10 days of Contractor receiving contract award. All materials with long lead times shall be delivered to the Contractor prior to contract work beginning.
C. Identification of Submittal: Two copies of each submittal shall be presented to the Government for approval. Completely identify each submittal by showing at least the following information:
1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or re-submittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
1.05 CERTIFICATES OF CONFORMANCE:
A. Requirements: Government may permit use, prior to sampling and testing of materials, when accompanied by Certificates of Conformance. Materials used on the basis of a Certificate of Conformance may be sampled and tested. Installation of materials on the basis of Certificates of Conformance shall not relieve the Contractor of responsibility for incorporating materials conforming to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.
B. Format: The form of the Certificate of Conformance provided by the supplier shall be as follows:
MT-01009-4
1. Two copies of the Certificate of Conformance shall be submitted for approval.
2. The certificate shall state that the named product conforms to the contract requirements.
3. The certificate shall either be accompanied with a certified copy of the test results or certify that such test results are on file with the manufacturer and will be furnished to the Government upon request.
4. The certificate shall provide the name and address of the manufacturer, the testing agency, and the date of tests.
5. The certificate shall set forth the means of identification permitting field determination of the product delivered as being the product covered by the certification.
1.06 QUALITY ASSURANCE:
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they are given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
C. Measurements: Where approved, manufacturer's diagrams and shop drawings give specific measurements or rough-in dimensions for equipment. These dimensions shall take precedence over dimensions indicated on the drawings.
1.07 DELIVERY, STORAGE, AND HANDLING:
A. Delivery: Contractor shall protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name and brand designation and contents legibly indicated. The containers shall bear the referenced specification number, type, and class as applicable.
B. Storage: Contractor shall provide temporary storage facilities for products complying with manufacturer's recommendations, which will protect them from damage until installation on the project and final acceptance.
The storage area shall permit access for inspection and handling.
C. Handling: Contractor shall load and unload products in such a manner that protects them from damage until installation on the project.
1.08 PROJECT/SITE CONDITIONS:
MT-01009-5
A. Access to the Work: The work site is accessed by State, County and Federal Roads. Contractor shall furnish all construction signage identified in Section MT-01500 Temporary Facilities and Controls of the specifications, as well as any additional signage required by local, state or federal authorities with jurisdiction. The day-use and campground site will be closed for the duration of the contract. It is the Contractor’s responsibility to provide adequate barriers and signage to communicate the site closure to the public. See Section MT-01500 Temporary Facilities and Controls for further guidance.
B. Environmental Considerations: The aesthetic values of the site and surrounding area are of prime importance. The Contractor shall take all care necessary to preserve all plant life and other natural features. No surface damage outside the staked area shall occur. Any surface damage outside the staked area shall be corrected at the expense of the Contractor. Any damage to existing state, county or local roads used to transport materials to the project, shall also be corrected at the expense of the Contractor.
C. Construction Facilities:
1. Do not park vehicles or equipment or store materials on private property without written permission from the property owner.
2. Contractor shall contact the Montana one-call system for utility locations prior to starting work. All utility locations shall include public and private utilities at the construction site. The number for the Montana one-call system is 1-800-424-5555.
D. Repair of Underground and Overhead Utilities: Contractor is responsible for any damage to underground and overhead utilities such as, but not limited to: water, electrical, gas, phone, sewer, fiber optic and main power lines. All damage to underground or overhead utilities will be the full responsibility of the Contractor and shall be repaired at the Contractor’s expense.
E. Wildlife Construction Constraints:
1. Contractor shall have immediate access to bear spray during construction activities and follow all food storage requirements.
2. All established rock fire rings shall be removed by Contractor.
3. If a den, nest site, or other important habitat feature for any threatened, endangered, or sensitive species is discovered within or in close proximity to any reconstruction site, project activities will be adjusted as needed, in coordination with BLM biologist.
4. Any sightings or sign of grizzly bear, lynx, or wolverine use in the project area will be documented and provided to the BLM wildlife biologist.
MT-01009-6
F. Food Storage Requirements: Construction crews shall adhere to the Food
Storage Regulation (Occupancy and Use Order #01-14-11-00-02) required by adjacent Custer Gallatin National Forest and endorsed by the Interagency Grizzly Bear Committee.
1. All food, refuse or other attractants must be acceptably stored or acceptably possessed during daytime hours.
2. All food, refuse or other attractants must be acceptably stored during nighttime hours, unless it is being prepared for eating, being eaten, being transported, or being prepared for acceptable storage.
3. Any harvested animal carcass must be acceptably stored, unless the carcass is being field dressed, transported, being prepared for eating, or being prepared for acceptable storage.
4. Camping or sleeping areas must be established at least ½ mile from a known animal carcass or at least 100 yards from a known, acceptably stored animal carcass.
5. The responsible party shall report the death and location of livestock to a BLM official within 24 hours of discovery. Any BLM land user finding dead livestock should contact the BLM.
1.09 SEQUENCING AND SCHEDULING:
A. Work Schedule: The detailed work schedule shall be submitted by the
Contractor at the pre-work conference. The Contractor shall not perform any work at the project site until the Contractor’s work schedule is received by the Government. When requested, the Contractor shall submit an updated schedule within 3 calendar days.
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
3.01 PROJECT MEETINGS:
A. Pre-Work Conference:
1. Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of the meeting time, date, and place. The purpose of the meeting will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
MT-01009-7
2. Attendance: Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.
3. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for the project. The Contractor shall also present all submittals and construction schedules requested in the specifications.
B. Progress Meetings:
1. Location: Meetings shall be held at the project site or as determined by the Government.
2. Notification: Meetings may be called by either the Government or the
Contractor. The request shall state who should attend.
C. Final Inspection:
1. Location: The final inspection shall be held at the project site, or as determined by the Government.
2. Notification: Contractor shall notify the Government, in writing, at least five working days prior to the completion date so the Government can schedule final inspection.
3. Attendance: The Contractor shall require the superintendent to be present during this inspection.
3.02 CLEANUP:
A. Waste Removal: Contractor shall keep the premises free from accumulation of waste materials or rubbish resulting from the construction process.
This includes any waste produced from employees at the construction site.
At the completion of the work, it is the Contractor’s responsibility to remove any remaining waste materials from the work site. If waste materials are not promptly removed from the site, the Government may remove the waste and charge the cost of removal to the Contractor.
PART 4: MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT:
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT:
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
MT-01009-8
END OF SECTION
SECTION MT-01500
TEMPORARY FACILITIES AND CONTROLS
TEMPORARY FACILITIES AND CONTROLS 05/20
MT-01500-1
1.01 SUMMARY:
A. Section Includes: Requirements for sanitary facilities, vehicular access, temporary barriers, permits, erosion control, and controls for storm water.
1.02 DEFINITIONS:
A. Landscape Preservation: The term "injury" includes, without limitation, bruising, scarring, tearing, and breaking of roots, trunks, or branches.
1.03 SUBMITTALS:
A. Requirements: The Contractor shall submit the Manufacturer's Certificate of Compliance for materials. Submittals shall be in accordance with Section MT-01009 - General Information and Requirements.
1.04 QUALITY ASSURANCE:
A. Regulations: Comply with applicable local regulations for haul routes over public highways, roads, or bridges. Comply with industry standards and applicable laws and regulations of authorities having jurisdiction including, but not limited to, the following:
1. Health and Safety regulations.
2. Utility company regulations.
3. Environmental protection regulations.
4. Prevention and control of water pollution.
B. Manuals: Comply with latest Manual on Uniform Traffic Control Devices
(MUTCD), Part VI.
1.05 PROJECT CONDITIONS:
A. Access Routes: Use only established roadways, areas, and haul routes, or temporary roadways, areas, or haul routes constructed by the Contractor when and as authorized by the Government.
B. Staging Area: Contractor shall utilized a weed-free staging area and shall avoid traveling through any weed infested areas.
MT-01500-2
2.01 MATERIALS:
A. Water: Water for compaction and dust control is available at the site from The Yellowstone River. Contractor shall obtain all permits required and bear any costs for the permits to draft water from the river. The Contractor shall abide by the rules and procedures contained in Department of Environmental Quality’s erosion control manual to draft water from the river.
B. Toilet Units: Provide self-contained, single occupant toilet units of the chemical, aerated recirculation, or combustion type. Provide units properly vented and fully enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material.
C. Construction Signs: Only signs to expedite deliveries, maintain traffic flow, project site closure, promote safety, and caution against danger shall be erected, as necessary.
D. Silt Fence Geotextile: Any silt fence materials shall be made of ultra-violet resistance material. The fabric shall have a minimum width of 6 feet.
E. Silt Fence Post: Posts shall be a minimum of 5 feet long and either wood or steel posts may be used.
F. Fasteners: The fabric shall be fastened using heavy-duty wire staples at least 1 inch long, tie wires or hog rings.
PART 3: EXECUTION
3.01 INSTALLATION:
A. Erosion Control Methods: Erosion control will be placed as described in the Department of Environmental Quality’s (DEQ) “Montana Sediment and Erosion Control Manual.” At no time will sediment be allowed to leave the staked construction area or to enter any water source. All erosion control items and devices will be completely setup and installed prior to construction. All erosion control will remain in place throughout the construction process and until the soil is stabilized. Contractor is responsible for implementing and removal of erosion control measures.
B. Pollution Controls: Control pollutants by use of Construction site management practices, and other controls including State and local control requirements.
1. Construction Site Management: Perform construction activities by methods that will prevent entrance, or accidental spillage, of solid matter, contaminants, debris, or other pollutants or wastes into streams, flowing or dry watercourses, lakes, wetlands, reservoirs, or underground water sources.
MT-01500-3
2. Erosion Control Best Management Practices: Contractor is responsible for placing sediment control materials, incorporating grading techniques, managing vehicle tracking areas and providing roadway management to limit potential stormwater influences. Contractor is solely responsible for any sediment loss from the construction site onto non-construction areas and will bear the costs to fix, repair and replace the damaged areas.
3. Silt Fence: All silt fence shall to be placed as specified in the Montana DEQ Stormwater Management During Construction Field Guide for Best Management Practices. Fabric shall be buried in soil to ensure sediment does not wash under the silt fence. Silt fences shall stay in place until the surrounding soil is stabilized.
C. Toilets: Install self-contained toilet units. Shield toilets to ensure privacy. Use of pit type privies will not be permitted.
1. Provide toilet tissue, paper towels, paper cups, and similar disposable materials for each facility. Provide covered waste containers for used material.
D. Vehicle Traffic Control: Provide, erect, and maintain all necessary traffic control devices, including traffic cones, delineators, barricades, suitable and sufficient flasher lights, flag persons, danger signals, and signs, as required by the State and local authorities having jurisdiction.
Take all necessary precautions for protection of the work and safety of the public on roads affected by the work during the contract period as construction work proceeds.
1. Do not start any construction work along public roads until the proper traffic control devices for warning, channeling, and providing safety for the motorists are in place at the construction site.
2. Protect all roads closed to traffic with effective barricades.
Illuminate all barricades and obstructions at night, and keep all lights burning from sunset until sunrise.
3. Erect such additional warning and directional signs in connection with the work as may be required by the Government.
4. Maintain the condition, operation, and effectiveness of all traffic control devices throughout their period of use. Remove all temporary traffic control devices when no longer needed.
E. Established Roadways as Haul Routes: Use existing available Public highways and roads as haul routes subject to the governing of local, state and federal regulations. Contractor is responsible for any damage caused by construction traffic.
MT-01500-4
1. Provide barricades, flag persons, lighting, signs, and other necessary precautions for safety of the public where haul routes cross public highways or roads.
F. Storage/Staging Areas: Contractor shall use a staging area as approved by the Government for trailers, equipment, and materials. Fencing of materials or equipment shall not be required at this site, however the Contractor shall be responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area.
3.02 Permits, Responsibilities and Controls:
A. Contractor Water Pollution Violations: If noncompliance should occur, of applicable Federal, State, or local laws, orders, regulations, or Water Quality Standards may result in the Government stopping all site activity until compliance is ensured. Contractor shall not be entitled to any extension of time, claim for damage, or additional compensation by reason of such a work stoppage. Corrective measures required to bring activities into compliance shall be at the Contractor's expense.
B. Stormwater Discharge Permit Associated with a Construction Site: A Notice of Intent (NOI) and Storm Water Pollution Protection Plan (SWPPP) shall be acquired by the Contractor under a stormwater general permit to control stormwater discharges from the construction site as required under section 402 of the Clean Water Act (Public Law 92-500, as amended). A copy of the permit shall be supplied to the Government at the Pre-Work Conference. Contractor shall adhere to all terms and conditions of the permit.
3.03 LANDSCAPE PRESERVATION:
A. Preservation: Preserve the natural landscape and preserve and protect existing vegetation not required or otherwise authorized to be removed.
Conduct operations, to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the work.
Move crews and equipment within the rights-of-way and over routes provided for access to the work in a manner to prevent damage to grazing land, cultural sites or other government property.
B. Damaged Vegetation: The repair or treatment of injured vegetation and the replacement of trees or shrubs shall be at the expense of the Contractor.
1. The Contractor is responsible for injuries to vegetation caused by
Contractor operations, personnel, or equipment.
2. Restore temporary roads to original landscape. Scarify and re-grade the Government land used for construction purposes not required for the completed installation so that surfaces blend with the natural terrain, provide proper drainage and prevent erosion. Seed disturbed areas according to Section MT-02933 - Seeding.
MT-01500-5
3.04 MAINTENANCE AND REMOVAL:
A. Maintenance: Maintain temporary structures, facilities, and controls as needed for safe and proper completion of the work and as directed by the Government.
B. Removal: Remove temporary structures, facilities, and controls as rapidly as progress of the work will permit and as approved by the Government.
3.05 CLEANUP:
A. Requirements: Construction debris, waste materials, packaging material and the like shall be removed from the work site daily.
B. Restoration of Storage Area: Upon completion of the project and after removal of trailers, materials, and equipment, restore the areas to its original condition, including topsoil and seeding as necessary in accordance with Section MT-02923 - Seeding.
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT:
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
SECTION MT-02201
WATERING
WATERING 05/20
MT-02201-1
1.01 SUMMARY:
A. Section Includes: Distributing and applying water required for compaction of subgrade, aggregate base course, and for dust control.
A. American Association of State Highway and Transportation Officials
AASHTO T 239-86 Moisture Content of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
1.03 PROJECT/SITE CONDITIONS:
A. Water Source: Contractor shall be responsible for obtaining the water source and any permits required. The Yellowstone River is adjacent to the project site.
2.01 MATERIALS:
A. Water: Shall be clean and free from deleterious materials.
2.02 EQUIPMENT:
A. Requirements: Provide necessary pumping equipment and water trucks.
Water trucks shall be equipped with a pressure pump and spray bar of adequate capacity and design to ensure uniform application of water in the amounts designated.
PART 3: EXECUTION
3.01 APPLICATION:
A. Requirements: Water shall be applied in such a manner to ensure uniform moisture content.
B. Compaction: The amount of water added or applied shall be sufficient to obtain the percent relative compaction required.
C. Dust Control: Water dry material to prevent dust on the project site, waste sites and haul roads to the waste sites.
WATERING 05/20
MT-02201-2
4.01 METHOD OF MEASUREMENT:
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT:
A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other scheduled items of the Contract.
SECTION MT-02213
SITE GRADING
SITE GRADING 05/20
MT-02213-1
1.01 SUMMARY:
A. Section Includes: All earthwork required to complete the subgrade sections of the project, including clearing and grubbing, excavation, embankment, grading, compacting, and all miscellaneous landscaping related work to prepare the site as indicated and as shown on the drawings.
A. American Association of State Highway and Transportation Officials
AASHTO T 99-86 Moisture-Density Relations of Soils Using a 5.5-lb (2.5
kg) Rammer and a 12-inch (305 mm) Drop
AASHTO T 239-86 Moisture Content of Soil and Soil-Aggregate in Place by
Nuclear Methods (Shallow Depth)
1.03 DEFINITIONS:
A. Excavation: All excavation materials shall be considered as unclassified excavation, regardless of its nature.
B. Embankment: Shall be mineral soil, free from peat, frozen material, brush, trees, roots over 2 inches in diameter and rocks over 6 inches in greatest diameter. All embankment material shall be obtained from on-site during excavation. Embankment is that material placed beneath roads, parking lots, and other areas on the site.
C. Waste Excavation: Excavation that is not used for construction of embankments shall be wasted in designated area, as directed by the Government and shown on the drawings.
1.04 QUALITY ASSURANCE:
A. Failure Criteria: Not limited to the following:
1. Formation of pools of moisture where positive drainage is indicated on the drawings and in waste embankment areas.
2. Settlement of embankment.
3. Flow of moisture toward, or entrapment against, building foundations.
MT-02213-2
1.05 PROJECT/SITE CONDITIONS:
A. Excess Material:
1. Excavated material unsuitable for building up embankment sections of the subgrade surface shall be wasted at the designated waste areas.
2. Usable excess material excavated shall be used in the subgrade embankment construction before the use of imported borrow is allowed.
Borrow wasting is not permitted.
3. All oversized rocks removed below subgrade elevations shall be brought back to the original subgrade elevation using excavated material before the use of imported borrow is allowed. Borrow wasting is not permitted.
4. Rocks and boulders greater than 2 feet in diameter shall be separated and set aside at the direction of the Government in the field. Rocks shall be individually placed by Contractor in designated locations to create access barriers. All rock removal is considered incidental to site grading.
B. Elevations: Verify the grade elevations existing on the site. Notify the Government immediately if adjustments are required to provide finish elevations indicated. Site drainage shall be considered of prime importance.
C. Environmental Conditions: Do not attempt to grade saturated material.
Water dry material to prevent dust.
2.01 MATERIALS:
A. General: See definitions.
3.01 CLEARING AND GRUBBING:
A. Requirements: The area to be excavated, and the surface area to be covered by embankments, shall be thoroughly cleared and stripped of objectionable vegetative matter, brush, trees, stumps, roots, and rocks and shall be wasted in areas at the project site, as directed by the Government and as shown on the drawings.
MT-02213-3
3.02 SCARIFYING:
A. Requirements: Sod and vegetation shall be removed from the surface upon which the fill shall be placed. The cleared surface shall be completely broken up by scarifying to a minimum depth of 6 inches. Scarifying furrows shall be a maximum of 3 feet apart and shall be parallel to the center line of the fill. No embankment materials shall be placed until the surface upon which the embankment material shall be placed has been approved.
3.03 PREWATERING:
A. Requirements: Excavation areas may be prewatered before excavating the material. The area to be excavated shall be moistened to the full depth from the surface to the bottom of the excavation. The application of water shall be controlled so that the excavated material will be near the optimum moisture content as specified in paragraph 3.06 A of this specification. When necessary, prewatering shall be supplemented to assure that embankment material and backfill material moisture content comply with paragraph 3.06 A of this specification. Obtain water for prewatering in accordance with Section MT-02201 - Watering.
3.04 INSTALLATION:
A. Excavation: Excavated material shall be used to bring the roadway, parking lots, campground loops and other areas to the required subgrade elevations where shown on the drawings or as staked in the field.
Contractor shall obtain sands and gravels from the excavated material and mix to obtain the best possible embankment for which the fill is intended.
B. Grades: Grades not otherwise indicated shall be level, or maintain uniform slopes between points where elevations are given, or between such points and existing finished grades. Any abrupt change in slopes shall be rounded and blended with adjacent topography.
C. Earthfill Placement: Embankment materials used to construct the roadway and parking lots, or any other fill areas shall be spread over the full width of the cross section of the embankment to a maximum loose thickness of 6 inches, and shall be compacted as specified in paragraph 3.06 A and B before the next layer is spread. Contractor shall use compaction equipment suitable to the type and depth of material being compacted to obtain the required degree of compaction. The in-place materials shall be free of lenses, pockets, streaks, or layers of materials that differ substantially in texture or gradation from the surrounding materials.
D. Disposal of Materials: Excess excavation shall be disposed of at the project site in the designated waste areas as shown on the drawings. Waste material shall be shaped and blended in with the surrounding terrain and shall not exceed 4:1 slopes unless otherwise specified by the Government in the field.
MT-02213-4
E. Use of Borrow Material: Do not use imported borrow material until after the materials obtained from the required excavation have been placed in the fill, or unless otherwise directed by the Government.
3.05 FINISHING:
A. Subgrade shall be finished with equipment capable of shaping and grading the finished surface within the tolerance specified below.
1. Subgrade surface will be checked for the required grades staked in the field by the Government with a tolerance of ± 5 hundredths of an inch.
3.06 FIELD QUALITY CONTROL:
A. Moisture Content: During watering and compacting of the embankment subgrade, the optimum moisture content (-4 percent to +2 percent), as determined by AASHTO T 99 and AASHTO T 239, shall be maintained by wetting or drying.
1. The waste area shall be watered to control dust. Compaction of the waste area shall be limited to wheel rolling from the equipment used for placing and shaping the waste material.
B. Field Density Testing: The embankment subgrade and all crushed aggregate base course material shall be compacted to a minimum density of 95 percent of the maximum dry density obtained by AASHTO T 99. All field density testing shall be performed by a Certified Geotechnical Laboratory.
1. Contractor shall include test results from a Geotechnical Laboratory of onsite material that will be utilized as subgrade materials.
2. In-place field density tests for quality assurance are at the Contractor’s expense and must pass at least one of the following tests: AASHTO T238 and T239 (ASTM D2922 and D3017), Nuclear Densometer Methods. Quality assurance field density testing frequency shall be two passing tests for every 1,000 linear feet of subgrade and two passing tests for every 1,000 linear feet of finish grade.
Tests shall be in locations as designated by the Government.
3. Re-testing failing areas is at the expense of the Contractor.
4. At the direction of the Government, the Contractor may be directed to provide necessary equipment and labor to excavate and replace materials for test holes up to 5 feet deep into the compacted backfill to allow testing below any site grading surface.
5. Government reserves the right to require additional testing to re-affirm suitability of completed work including compacted soils that have been exposed to adverse weather conditions.
MT-02213-5
A. Units: The site grading described in this section, including all clearing and grubbing, excavation, embankment, grading, general earthwork, watering, compacting, and all miscellaneous landscaping will be measured and paid for on a lump sum basis.
B. Units: All compaction testing work described in this section will be measured and paid for on a lump sum basis.
C. Units: Imported screened topsoil will be paid separately from site grading work under Section MT-02933 Imported Screened Topsoil.
D. Units: Crushed aggregate base course material will be paid separately from site grading work under Section MT-02233 Crushed Aggregate Base Materials.
4.02 BASIS OF PAYMENT:
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
MT-02213(1) Site Grading . . . . . . . . . . . . . . . . . . Lump Sum MT-02213(2) Compaction Testing . . . . . . . . . . . . . . . Lump Sum
SECTION MT-02233
CRUSHED AGGREGATE BASE MATERIALS
CRUSHED AGGREGATE BASE MATERIALS 05/20
MT-02233-1
1.01 SUMMARY:
A. Section Includes: This work shall include furnishing, placing, and compacting aggregate base course materials on the prepared subgrade of the entrance road, campground loops, parking lot, foundations of structures, and around building areas according to these specifications and to the lines, grades, and thickness as shown on the drawings or as staked in the field.
1.02 REFERENCES
A. American Association of State Highway and Transportation Officials:
AASHTO T 99-86 Moisture-Density Relationship of Soils Using a 5.5-lb
(2.5 kg) Rammer and a 12-inch (305 mm) Drop
AASHTO T 239-86 Moisture Content of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
1.03 CERTIFICATE OF CONFORMANCE:
A. Certification: Contractor to submit two copies of written certification from the supplier that the Contractor-furnished material to be used on this project conforms to the requirements of this specification section.
Contractor shall include in the submittal, test results from a Certified
Geotechnical Laboratory: Samples shall be obtained from the stockpile of material to be used on this project at the time of Construction for the 3/4-Inch Crushed Aggregate.
1. Sieve Analysis according to AASHTO T 99.
2. Standard Proctor according to AASHTO T 99.
3. A Loose Wet Density of the material according to Jigging Method
ASTM C 29.
4. Atterburg limits according to ASTM D 4318
5. Percentage of Mechanically Fractured Particles according to Montana Department of Transportation (MDT), MT-217.
MT-02233-2
2.01 MATERIALS: Shall be in conformance with the following requirements:
A. General: Aggregate material shall consist of hard, durable particles or fragments of slag, stone, or gravel crushed of the required size and gradation. Material shall be visually free from organic matter and lumps or balls of clay and shall meet the requirements for the gradation given.
B. 3/4-Inch Crushed Aggregate Base: Shall meet the following gradation and requirements including added binder or blending material:
Sieve Size Percent Passing
3/4 inch 100 percent No. 4 40-80 percent No. 10 25-60 percent No. 200 10-20 percent
1. The Maximum liquid limit for the material passing the No. 40 sieve is
35.
2. The Plasticity Index for the material passing the No. 40 sieve may vary between 0 and 9.
3. At least 35 percent by weight of the aggregate retained on the No. 4 sieve must have at least one mechanically-fractured face. Test for determining percentage of mechanically fractured particles shall be according to MDT, MT-217.
PART 3: EXECUTION
3.01 PREPARATION:
A. The subgrade shall be prepared in accordance with Section MT-02213 - Site
Grading.
3.02 INSTALLATION:
A. All aggregate base course materials shall have water added as required in
Section MT-02201 - Watering. The aggregate shall then be mixed and processed to produce a uniform blend of material before final placement.
After processing, the material shall be placed on the prepared subgrade in a uniform layer not exceeding 6 inches in compacted depth. The method of dumping and spreading shall be determined by the Contractor. The spread material shall be free of segregation.
3.03 COMPACTION:
A. Each layer of aggregate base shall be compacted to the full width by
MT-02233-3
means of compaction equipment suitable to the type and depth of material being compacted. Compaction of each layer shall continue until density of not less than 95 percent of the maximum dry density is achieved as determined by AASHTO T 99.
3.04 FINISHING:
A. The final layer of each aggregate base course material shall be finished with equipment capable of shaping and grading the finished surface within the tolerance specified below.
1. The finish grade surface will be checked for the required grades specified on the drawings by the Government with tolerances being ± 3-hundredths of an inch.
A. Units: The work described in this section will be measured and paid for by the cubic yard compacted in place for imported aggregate base material. Determination of quantities shall be as follows:
1. Loose Material hauled shall be weighed at a certified scale and tickets given to the Government.
2. Loose material hauled shall then be divided by the Loose Wet Density of the material to obtain the loose cubic yards delivered.
3. The loose cubic yards shall be divided by the Factor of 1.33 to obtain the compacted yards in place.
Factor Derivation:
25 percent shall be used for shrink and loss. 20% for shrink and 5% for loss.
Factor = 100% = 1.33 100%-25%
A. Payment: The accepted quantities will be paid for at the contract price per unit of measurement, respectively, for the pay item shown in the Bid Schedule. Price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools, and incidentals necessary to complete the work described in this section.
Payment will be made under:
MT-02233-4
Payment Pay Unit
MT-02233(1) - 3/4-Inch Crushed AB - Compacted in Place. . . . Compacted Cubic Yard
End of Section
SECTION MT-02878
MISCELLANEOUS PROJECT SITE ITEMS
MISCELLANEOUS PROJECT SITE ITEMS 05/20
MT-02878-1
1.01 SUMMARY:
A. Section Includes: Removal and placement of the existing vault toilet atop of a new vault; installing a new double vault toilet, installing concrete parking curbs; installing camp pad accessories such as picnic tables, fire rings and food storage lockers; and all other related appurtenances and miscellaneous work in accordance with the drawings and specifications as staked in the field or as directed by the Government.
1.02 PROJECT/SITE CONDITIONS:
(There are no applicable requirements).
1.03 SUBMITTALS:
A. Requirements: Contractor shall submit the Manufacturer's Certificate of
Compliance for all Contractor-supplied materials. Submittals shall be in accordance with Section MT-01009 - General Information and Requirements.
2.01 GOVERNMENT-FURNISHED MATERIALS:
A. Concrete Toilet: Contractor responsible for relocating concrete single-stall toilet, located at the existing day-use site, to location shown on drawings. Concrete toilet refers to the superstructure only does not include substructure vault. Existing substructure vault shall be hauled away by Contractor and disposed of at an EPA approved landfill by Contractor.
B. Single Concrete Vault: Structure to be delivered to the site by manufacturer. Placement location to be prepped by Contractor and set by manufacturer. Old concrete vault located in the day-use area shall be hauled off site and disposed of at an EPA approved landfill by Contractor.
C. Double Vault Toilet: Structure to be delivered to the site by manufacturer. Placement location to be prepped by Contractor and set by manufacturer.
2.02 CONTRACTOR-FURNISHED MATERIALS:
A. Concrete Vault Toilets:
MT-02878-2
1. Vault Bedding: Shall conform to the requirements of Section MT-02233 3/4-Inch Crushed Aggregate Base Materials.
2. Timber Sills: Shall be 4” x 12” x 8.5’ Douglas Fir rough sawn timber.
3. Vault Backfill: Shall consist of existing embankment material.
Material shall not contain any rocks greater than thee inches in diameter.
4. Finish Material: The materials used to finish around the toilet buildings shall be 3/4-inch crushed aggregate base as shown on the drawings and meeting the requirements of Section MT-02233 3/4-Inch Crushed Aggregate Base.
B. Pre-cast Concrete Curb and #5 rebar for pinning down curbs: Curbs shall be eight inches wide, and between 7-8 feet in length. All curbs shall be of matching dimensions. Each curb to be pinned with two, 18-inch #5 rebar.
C. Camp Pad Accessories:
1. Pilot Rock WXT Series – Universal Access, V-Type Thermo-plastic coated expanded steel snow-load rated, basis of design (or approved equal).
a. Length: 6 foot.
b. Color:
i. Table and seats: Brown.
ii. Frame: Black (powder coated).
c. Material type:
i. Frame: round steel tubing
ii. Decking (top and seats): thermo-plastic coated expanded steel
(V-type).
d. Loading:
i. Minimum load rating: 1,420 psf.
e. Accessibility:
i. Wheel chair accessible on both length-wise ends.
f. Anchoring:
i. Drive-in Ground Anchor: Pilot Rock Model 88-AT1, 3000 lb.
capacity, ¼” x 6’ galvanized wire rope (or approved equal).
2. Food Storage Lockers: Pilot Rock 30-cubic foot, powder-coated food locker, basis of design (or approved equal).
a. Capacity: 30 cf.
b. Dimension: 37.5” x 47.75” x 30” box. 7.5” legs
c. Color: Brown
d. Anchoring:
i. Embedded post mount
ii. Dimension: 3-1/2” (O.D.)x 61-1/4” long post embedded into a
12” Ø x 18” concrete footing.
3. Fire Rings: Pilot Rock 11” fire ring with angle spade anchors, basis of design (or approved equal).
MT-02878-3
a. Dimension: 11” high x 32” nominal diameter.
b. Color: Black.
c. Anchoring: Angle spade
i. Dimension: 3/16” x 1-3/4” x 1-3/4” A-36 steel with welded on spade (1/8” steel).
3.01 PREPARATION:
A. Project Site Item Removal:
1. Concrete Vault Toilet: Contractor shall secure a vault toilet pumping service to remove all excrement from the day-use vault toilet prior to moving the structure.
a. Vault toilet was fabricated by CXT.
b. Further information concerning the vault toilet may be obtained from the manufacturer.
www.cxtinc.com/
(509) 703-3384
(800) 696-5766
c. Contractor shall be responsible for excavating around the vault toilet before removing the structure.
d. Contractor shall use suitable equipment to move the vault toilet structure from its existing location to its proposed location as detailed in the drawings and specifications.
e. Contractor to backfill the excavated hole of the existing vault toilet with embankment material. The backfilled area shall be compacted to a minimum dry density of 95 percent as outlined in Section MT-02213 – Site Grading.
2. Camp Pad Accessories: Contractor shall place camp pad accessories on level ground. Levelness of placement areas to be confirmed by Contractor using a laser or auto level.
3.02 INSTALLATION:
A. Concrete Vault Toilets
1. Excavation: Perform excavation to the lines, grades, and elevations indicated on the drawings and as staked in the field to allow for safety, placing and inspection. Provide proper depth with allowance made for crushed aggregate base bedding.
MT-02878-4
2. Bedding: Bedding shall be 3/4-inch crushed aggregate base course in accordance with Section MT-02233 – Crushed Aggregate Base Materials.
Bedding shall be placed to the depth as shown on the drawings and compacted to 95 percent of the maximum dry density as determined by
AASHTO T 99.
a. Timber Sills: Place timber sills in bedding as shown on the drawings, screed level and compact bedding material.
3. Backfill: Concrete Vault Toilet Backfill: Place backfill around vault toilet using suitable embankment materials (2-inch minus).
Embankment material to be backfilled around concrete vault toilet using 6-inch lifts that are compacted to 95 percent of the maximum dry density as determined by AASHTO T 99. This method of backfilling shall be continued until the embankment has reached the required elevation.
4. Finishing: Finish slopes around the finished elevation of the concrete slab with 3/4-inch crushed aggregate base course material.
Spread material out to the distances staked in the field. Hand rake as necessary to remove excess material and to smooth out in areas inaccessible to construction equipment and as directed by the Government in the field for a quality, finished appearance. Compact to 95 percent of the maximum dry density of the material used according to AASHTO T 99.
a. Wash and/or sweep concrete slab upon completion in order to clean off gravel or other earthen materials.
b. Clean off all structures that are affected by hydroseeding operations.
B. Concrete Parking Curbs: The pre-cast concrete parking curb shall be installed after final grading of the parking lot is completed and as shown on the drawings. Contractor to install two 18” - #5 rebar per concrete curb after placement of curb is approved by the Government.
C. Camp Pad Accessories:
1. Place picnic tables, fire rings, and food storage lockers in locations designated by Government in the field.
2. Install camp pad accessories in accordance with manufacturer’s specifications.
3. Anchor all camp pad accessories with anchoring system listed in section 2.02 of these specifications.
4. In the event of any shortage of accessories, Government will instruct Contractor where to place available inventory. In the event of an
MT-02878-5
excess of accessories, Government will take possession of any additional accessories and place items in storage or haul off site.
3.03 PROTECTION:
A. Concrete Vault Toilet: Any damage to the toilet structure by the
Contractor during relocating, placement, backfilling and finishing operations shall be repaired or replaced at no additional cost to the Government.
A. Units: All work required to move the existing concrete vault toilet, excavate and construct the subgrade toilet, as well as installing the timber sills, and any other appurtenances will be paid for each installation under Toilet Building Installation.
B. Units: Quantities for the Crushed Aggregate Base Materials used to construct the concrete vault toilet bedding, backfilling and finishing materials are included in the Crushed Aggregate Base Course compacted cubic yard quantities of this Contract, and are paid for under Section MT-02233(1) 3/4-Inch Crushed Aggregate Base – Compacted Cubic Yard.
C. Units: Installation of the pre-cast concrete curb and rebar will be paid for each installed under Parking Concrete Curb.
D. Units: Installation of picnic tables will be paid for each installed under
MT-02878(3) Picnic Table.
E. Units: Installation of food storage lockers will be paid for each installed under MT-02878(4) Food Storage Locker.
F. Units: Installation of fire rings will be paid for each installed under MT-02878(5) Fire Ring.
described in this section. Payment will be made under:
Pay Item Pay Unit
MT-02878(1) Toilet Building Installation . . . . . . . . Each MT-02878(2) Concrete Parking Curb . . . . . . . . . . . . Each MT-02878(3) Picnic Table . . . . . . . . . . . . . . . . . Each MT-02878(4) Food Storage Locker . . . . . . . . . . . . . Each
MT-02878-6
MT-02878(5) Fire Ring. . . . . . . . . . . . . . . . . . . Each
SECTION MT-02933
SEEDING
SEEDING 05/20
MT-02933-1
1.01 SUMMARY:
A. Section Includes: Furnishing labor, equipment, supplies and materials to apply topsoil, native seed, mulch and erosion control matting to the cut and fill slopes of the entrance road, parking lot, designated waste area, boat ramp area, and all other reclamation areas identified in the specifications, and as shown on the drawings and as directed by the Government in the field.
A. Federal Specifications:
Fed. Spec. JJJ-S-181B Seeds, Agricultural
1.03 SUBMITTALS:
A. General: Submittals shall be according to Section MT-01009 - General
Information and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .