C1(a) - 70FBR920R00000007 Final.pdf
PDF 718 KB Posted
- Attached to
- PHC - New Housing Construction Federal contract opportunity
- Solicitation number
- 70FRB920R00000007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pricing_Sheet_for_Scopes_of_Work.xlsx | XLSX spreadsheet | |
| Block.pdf | ||
| concblock.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
FEMA REGION 09
FEDERAL EMERGENCY MGMT AGENCY REGION 09
ATTN
1111 BROADWAY
FEMA R09
SUITE 1200
OAKLAND CA 94607-4052
Ralph La Rosa
DR-4404-MP
x 04/24/2020
70FBR920R00000007
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The purpose of this procurement is to acquire services to Construct 20 new applicant's dwellings (1,2, & 3 Bedroom units) destroyed in Saipan and Tinian under DR-4404-MP.
Order of Magnitude - between 10 to 25 million
DOL Wage Determination Decision Number: CM20200002 01/03/2020
FEMA intends to award an IDIQ Contract to at least 1 but no more than 3 vendors from this solicitation. Task Orders will be issued in groups up to 20 per order
Period of Performance is 1 year for the contract - anticipated dates are 7/5/2020 to
6/30/2021 - The Task Orders will have an individual Period of Performance of 180 days
The Contractors shall ensure compliance with 2018 International Building Code (IBC) for high wind (195MPH) and flooding standard shall be completed in compliance with
2012 IBC standards to include seismic zone 4 code, permitting, licensing, Federal floodplain management standards and environmental/historical preservation
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 180 calendar days and complete it within ________________ ________________ calendar days after receiving
05/25/2020
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
FEMA REGION 09
FEDERAL EMERGENCY MGMT AGENCY REGION 09
ATTN
1111 BROADWAY
FEMA R09
SUITE 1200
OAKLAND CA 94607-4052
Ralph La Rosa
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 49
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FBR920R00000007
requirements.
Please see exceptions to the applicable code requirements. Utilizing the Government provided drawings. The work must be performed by licensed building Contractors, authorized to work in the CNMI, using materials of average quality for the lowest price (“builder grade”), IBC minimum code compliant materials and employing at a minimum 30% local labor (IAW FAR 52.226-5), to the greatest extent possible.
The Program activities require the services of professional construction technicians, engineers,and other related technical specialists with knowledge, experience, and expertise in the professional field of construction services, project management; supply chain/logistics, workforce mobilization & sustainment.
Site Visit is tentatively scheduled for 8AM local time on 7 May 2020 - 8 May 2020 if all sites can not be completed on the 7th.
Period of Performance: 06/01/2020 to 05/31/2021
0001 Construction Cost of 20 Homes (Firm Fixed Price) 1 LS included the cost of Sub-CLINs:
001A Construction
001B Key Personnel
001C Profit
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
0001001A Build up to 20 Residences (1,2, &3 bedroom units)on Saipan and Tinian (Firm Fixed Price)
This cost is for all cost to include material, equipment, general labor, permits, bonds, insurance, fuel, ect.
(Not Separately Priced)
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 49
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FBR920R00000007
Period of Performance: 07/01/2020 to 12/31/2020
0001001B Key Personnel - Firm Fixed Price
(Not Separately Priced)
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Period of Performance: 07/01/2020 to 12/31/2020
0001001C Profit to be negotiated - Firm Fixed Price
(Not Separately Priced)
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Period of Performance: 07/01/2020 to 12/31/2020
0002 Miscellaneous 1 LS
Must be supported by an approved Request For
Change document (Cost Reimbursable) This would include things that are not readily noticeable at the site visit. Such as an object being discovered during excavation that may cause a change in scope, or a change to the design or scope directed by FEMA
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Period of Performance: 07/01/2020 to 12/31/2020
1001 Construction Cost of 20 Homes (Firm Fixed Price) 1 LS included the cost of Sub-CLINs:
1001A Construction
1001B Key Personnel
1001C Profit
(Option Line Item)
Date Option to be Exercised 170 Days After Award
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 49
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
70FBR920R00000007
1001001A Build up to 20 Residences (1,2, & 3 Bedroom units)on Saipan and Tinian (Firm Fixed Price)
This cost is for all cost to include material, equipment, general labor, permits, bonds, insurance, fuel, ect.
(Option Line Item)
Date Option to be Exercised 170 Days After Award
(Not Separately Priced)
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Period of Performance: 01/01/2021 to 06/30/2021
1001001B Key Personnel (Firm Fixed Price)
(Option Line Item)
Date Option to be Exercised 170 Days After Award
(Not Separately Priced)
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Period of Performance: 01/01/2021 to 06/30/2021
1001001C Profit to be negotiated (Firm Fixed Price)
(Option Line Item)
Date Option to be Exercised 170 Days After Award
(Not Separately Priced)
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Period of Performance: 01/01/2021 to 06/30/2021
1002 Miscellaneous 1 LS
Must be supported by an approved Request For
Change (RFC) document (Cost Reimbursable)
(Option Line Item)
Date Option to be Exercised 170 Days After Award
Product/Service Code: Y1FA
Product/Service Description: CONSTRUCTION OF
FAMILY HOUSING FACILITIES
Period of Performance: 01/01/2021 to 06/30/2021
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
A - Solicitation/Contract Form
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 2 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.216-1 Type of Contract. (APR 1984)
The Government contemplates award of contract with Firm Fixed Price. See the contract line items resulting from this solicitation.
(End of provision)
B - Supplies or Services/Prices (Complete CLINs and Sub CLINs 0001 – 0002 only)
CLIN Description (Reference Page 3-4) Quantity Unit of Measure
Unit Price Total
0001 CONSTRUCTION OF UP TO 20 PROPERTIES (FFP)
Includes Sub-CLINs 001A, 001B, and 001C
1 LS
001A CONSTRUCTION OF UP TO 20 PROPERTIES (FFP)
001B Key Personnel Only (FFP)
001C Profit (FFP)
Miscellaneous (CR)
LS
1001 CONSTRUCTION OF UP TO 20 PROPERTIES (FFP)
Includes Sub-CLINs 1001A, 1001B, and 1001C
1 LS
1001A CONSTRUCTION OF UP TO 20 PROPERTIES (FFP)
1001B Key Personnel Only (FFP)
1001C Profit (FFP)
Miscellaneous (CR) 1 LS
C - Description / Specifications
The Contract requires the construction of 20 new residential dwellings – in a 1, 2, or 3-bedroom footprint as specified on the pricing sheet. See attached Government provided Drawings and Specifications.
D - Packaging and Marking No clauses
E - Inspection and Acceptance
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.246-12 Inspection of Construction. (AUG 1996)
F - Deliveries or Performance
52.236-15 Schedules for Construction Contracts. (APR 1984)
52.242-15 Stop-Work Order. (AUG 1989)
52.242-17 Government Delay of Work. (APR 1984)
G - Contract Administration Data
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-17 Layout of Work. (APR 1984)
52.242-14 Suspension of Work. (APR 1984)
Technical Direction and Surveillance TECHNICAL
DIRECTION AND SURVEILLANCE
(a) Performance of the work under this contract shall be subject to the surveillance and written technical direction of the Contracting Officer's Representative (COR) who shall be specifically appointed by the Contracting Officer in writing. Technical direction is defined as a directive to the Contractor which approves approaches, solutions, designs, or refinements; fills in details or otherwise completes the general description of work of documentation items; shifts emphasis among work areas or tasks; or otherwise furnishes guidance to the Contractor. Technical direction includes the process of conducting inquiries, requesting studies, or transmitting information or advice by the COR, regarding matters within the general tasks and requirements in the statement of work for this contract.
(b) The COR does not have the authority to, and shall not, issue any technical direction which:
(1) Constitutes an assignment of additional work outside the Statement of Work;
(2) Constitutes a change as defined in the contract clause entitled "Changes";
(3) In any manner causes an increase or decrease in the total estimated contract cost, the fixed fee (if any), or the time required for contract performance;
(4) Changes any of the expressed terms, conditions, or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the specifications of the contract.
(c) All technical directions shall be issued in writing by the COR.
(d) The Contractor shall proceed promptly with the performance of technical directions duly issued by the COR in the manner prescribed by this clause and within his/her authority under the provisions of this clause. Any instruction or direction by the COR which falls within one, or more, of the categories defined in (b)(1) through (5) above, shall cause the Contractor to notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and shall request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer shall either issue an appropriate contract modification within a reasonable time or advise the Contractor in writing within thirty (30) days after receipt of the Contractor's Letter that:
(1) the technical direction is rescinded in its entirety.
(2) the technical direction is within the scope of the contract, does not constitute a change under the "Changes" clause of the contract and that the Contractor should continue with the performance of the technical direction.
(e) A failure of the Contractor and Contracting Officer to agree that the technical direction is within scope of the contract, or a failure to agree upon the contract action to be taken with respect thereto shall be subject to the provisions of the "Disputes" clause of this contract.
(f) Any action(s) taken by the Contractor in response to any direction given by any person other than the Contracting
Officer or the COR shall be at the Contractor's risk.
Issuing Task Orders
The Contracting Officer will issue task order that include the following information (but not limited to):
1) IDIQ Number and Task Order Number
2) FEMA Points of Contacts
3) Place & Period of Performance
Ordering Procedures
1) The Contracting Officer will issue a task order proposal request to include statement of work, pricing schedule, project schedule request, and repair coordinates.
2) A site visit will be scheduled.
3) Contractors can submit questions for Government answers (if needed).
4) Government will review and evaluate the Contractors’ prices and project schedules.
5) The Contracting Officer award task order(s).
6) The Contracting Officer anticipates awarding a task order to each IDIQ contractor; however, if it becomes necessary, the Contracting Officer will use ordering procedures under FAR 16.505(b)(1) Fair Opportunity.
IDENTIFICATION OF GOVERNMENT OFFICIALS
IDENTIFICATION OF GOVERNMENT OFFICIALS (AUG 2014)
The Government Officials assigned to this contract are as follows:
Administrative Contracting Officer:
Name: Ralph J. La Rosa
Phone: 202-826-5685
Email: ralph.larosa@fema.dhs.gov
Contracting Officer’s Representative:
mailto:ralph.larosa@fema.dhs.gov
Name: Charlotte Glaspie
Phone: TBD
Email:
charlotte.glaspie@fema.dhs.gov
Fax: N/A
H - Special Contract Requirements
52.211-18 Variation in Estimated Quantity. (APR 1984)
52.236-4 Physical Data. (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Statement of Work were inspected via visual inspections and surveys.
(b) Weather conditions: Visit National Weather Service sites for regional weather patterns and conditions.
(c) Transportation facilities Saipan is the second-largest island in the Mariana Islands archipelago, after Guam.
It is located about 120 mi (190 km) north of Guam and 5 nautical miles (9.3 km) northeast of Tinian, from which it is separated by the Saipan Channel. Saipan is about 12 mi (19 km) long and 5.6 mi (9.0 km) wide, with a land area of 115.38 km 2 (44.55 sq. mi).
(d) N/A.
(End of clause)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-13 Accident Prevention. (NOV 1991)
I - Contract Clauses
52.202-1 Definitions. (NOV 2013)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)
52.203-7 Anti-Kickback Procedures. (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)
52.203-13 Contractor Code of Business Ethics and Conduct. (OCT 2015)
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights. (APR 2014) mailto:charlotte.glaspie@fema.dhs.gov
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011)
52.204-7 System for Award Management. (OCT 2018) 52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011)
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillances Service or Equipment (DEC 2019)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillances Service or Equipment (AUG 2019)
52.204-26 Covered Telecommunications Equipment or Services Representation (DEC 2019)
52.209-5 Certification Regarding Responsibility Matters. (OCT 2015) As prescribed in 9.104-7(a), insert the following provision:
Certification Regarding Responsibility Matters (Oct 2015) (a)
(1) The Offeror certifies, to the best of its knowledge and belief, that-
(i) The Offeror and/or any of its Principals-
(A) Are□ are not□ presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;
(B) Have□ have not□, within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract;
violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property (if offeror checks “have”, the offeror shall also see 52.209-7, if included in this solicitation);
(C) Are□ are not□ presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in paragraph (a)(1)(i)(B) of this provision;
(D) Have□, have not□, within a three-year period preceding this offer, been notified of any delinquent Federal taxes in an amount that exceeds $3,500 for which the liability remains unsatisfied.
(1) Federal taxes are considered delinquent if both of the following criteria apply:
(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.
(ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
(2) Examples.
(i) The taxpayer has received a statutory notice of deficiency, under I.R.C. § 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. § 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. § 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.
(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code).
(ii) The Offeror has ⇐ has not ⇐, within a three-year period preceding this offer, had one or more contracts terminated for default by any Federal agency.
https://www.acquisition.gov/content/9104-7-solicitation-provisions-and-contract-clauses#i1116212 https://www.acquisition.gov/content/52209-7-information-regarding-responsibility-matters#i1062621
(2) “Principal,” for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
This Certification Concerns a Matter Within the Jurisdiction of an Agency of the United States and the Making of a False, Fictitious, or Fraudulent Certification May Render the Maker Subject to Prosecution Under Section 1001, Title 18, United States Code.
(b) The Offeror shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Offeror learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
(c) A certification that any of the items in paragraph (a) of this provision exists will not necessarily result in withholding of an award under this solicitation. However, the certification will be considered in connection with a determination of the Offeror’s responsibility. Failure of the Offeror to furnish a certification or provide such additional information as requested by the Contracting Officer may render the Offeror non-responsible.
(d) Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (a) of this provision. The knowledge and information of an Offeror is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
(e) The certification in paragraph (a) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this solicitation for default.
(End of provision)
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (OCT 2018)
52.211-12 Liquidated Damages - Construction. (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,600.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-13 Time Extensions. (SEP 2000)
52.215-1 Instructions to Offerors-Competitive Acquisition. (JAN 2017)
As prescribed in 15.209(a), insert the following provision:
Instructions to Offerors-Competitive Acquisition (Jan 2017)
(a) Definitions. As used in this provision-
Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
In writing, “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
https://www.acquisition.gov/content/15209-solicitation-provisions-and-contract-clauses#i1109112
Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show–
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, revision, and withdrawal of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii) (A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-
(1) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed-in whole or in part-for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of-or in connection with-the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.
https://www.acquisition.gov/content/52215-5-facsimile-proposals#i1059231 https://www.acquisition.gov/content/52225-17-evaluation-foreign-currency-offers#i1054275
(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
https://www.acquisition.gov/content/15306-exchanges-offerors-after-receipt-proposals#i1108639
52.215-2 Audit and Records - Negotiation. (OCT 2010)
52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)
52.216-18 Ordering. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of award through end of period of performance.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
52.216-19 Order Limitations. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $3,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of $7,500,000.00;
(2) Any order for a combination of items in excess of $15,000,000.00; or
(3) A series of orders from the same ordering office within 5 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 2 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 Indefinite Quantity. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the maximum. The Government shall order at least the quantity of supplies or services designated in the Schedule as the minimum.
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 12/04/2020.
52.216-27 Single or Multiple Awards. (OCT 1995)
The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to one or more sources under this solicitation.
(End of provision)
52.217-7 Option for Increased Quantity - Separately Priced Line Item. (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 calendar days. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
52.217-8 Option To Extend Services. (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 calendar days.
52.217-9 Option To Extend the Term of the Contract. (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 60 calendar days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 360 days.
52.219-8 Utilization of Small Business Concerns. (OCT 2018)
52.219-14 Limitations on Subcontracting. (JAN 2017)
52.222-3 Convict Labor. (JUN 2003)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (AUG 2018)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-21 Prohibition of segregated facilities. (APR 2015)
52.222-26 Equal Opportunity. (SEP 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)
52.222-38 Compliance with Veterans' Employment Reporting Requirements. (FEB 2016)
52.222-35 Equal opportunity for Veterans (OCT 2015)
52.222-37 Employment Reports on Veterans. (FEB 2016)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010)
52.222-50 Combating Trafficking in Persons. (JAN 2019)
52.223-1 Biobased Product Certification (MAY 2012)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013)
52.223-3 Alt 1 Hazardous Material Identification and Material Safety Data. (July 1995)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.
(JUN 2016)
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving. (AUG 2011)
52.225-12 Notice of Buy American Requirement-Construction Materials. Under Trade Agreements
(MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,”
“designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled
“Buy American-Construction Materials Under Trade Agreements” (Federal Acquisition Regulation
(FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225- 11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
https://www.acquisition.gov/content/52225-11-buy-american-construction-materials-under-trade-agreements#i1054019 https://www.acquisition.gov/content/52225-11-buy-american-construction-materials-under-trade-agreements#i1054019 https://www.acquisition.gov/content/52225-11-buy-american-construction-materials-under-trade-agreements#i1054019
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs
(c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
52.225-11 Buy American-Construction Materials under Trade Agreements.
As prescribed in 25.1102(c), insert the following clause:
Buy American-Construction Materials under Trade Agreements (Oct 2019)
(a) Definitions. As used in this clause-
Caribbean Basin country construction material means a construction material that–
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country…
This is the start of the file's text. The full file is on GovTribe.