C-17_PSE_Solicitation_Template-FA8526-XX-P-XXXX-FINAL.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Tensiometer, Cable - Life Raft Retractor Federal contract opportunity
Solicitation number
FA8526-21-Q-0023
Issued by
Department of the Air Force

View the file

Other files for this federal contract opportunity

Other files attached to Tensiometer, Cable - Life Raft Retractor, newest first.
File Type Posted
FA852621Q0023_______0001.pdf PDF
Attachments.pdf PDF
FA8526-21-Q-0023_RFQ.pdf PDF
Use_and_Non-Disclosure_Agreement.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR INSTRUCTIONS

Solicitation #-FA8526-XX-P-XXXX
Title-Peculiar Support Equipment XYZ
INSTRUCTIONAL GUIDANCE
Spreadsheet Worksheet TabInstructions for Specific SpreadSheet Worksheet Tab
NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED
Incorporate into Column A, rows 1-4 the information requested as it relates to your solicitation (information will flow into the other tabs)
Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation
Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided)
Total Summary Tab by CLINIncorporate into Columns C-F Labeled "Proposed Sum of Hours by Labor Category/Material (Contractor Use) the applicable labor categories and rates utilized by CLIN (Replace Labor Categories as necessary)
Add in additional rows under the related CLIN for additional labor categories needed (ensure formulas are adhered to for calculation purposes)
Incorporate the hours for each labor category identified by CLIN
Incorporate your total sum of material dollars proposed by CLIN from the Material Tab
Incorporate your total dollars for Option CLINs (sample escalation provided)
Ensure your data calculates appropriately
NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED
Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation
Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided)
Task Summary by CLINIncorporate into Columns C-F Labeled "Proposed Sum of Hours by Task (Contractor Use) " the applicable tasks utilized by CLIN (Replace tasks as necessary)
Add in additional rows under the related CLIN for additional tasks needed (ensure formulas are adhered to for calculation purposes)
Incorporate the hours for each task identified by CLIN against the categories provided (i.e. PM/LE/QUALITY)
Ensure your data calculates appropriately
NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED
Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation
Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided)
Materials Breakout TemplateIncorporate into Columns C-H Labeled "Material" the applicable material utilized by CLIN (Replace material as necessary)
Add in additional rows under the related CLIN for additional material as needed (ensure formulas are adhered to for calculation purposes)
Incorporate the part number, unit of measure, unit price, and quantity
Add in Shipping Costs as appropriate (Shipping Cost will be respresented as part of the sum of material pulled into the Summary Tab)
Ensure your data calculates appropriately

Total Summary Tab by CLIN

Solicitation #-FA8526-XX-P-XXXX
Quote # 1234 (Valid for 30 days)
Contractor-ABC Company
Date 2 May 2020
PROPOSED-Sum of Hours by Labor Category/Material (CONTRACTOR USE)Government Technical Review (For Official Use Only)
CLINSDescriptionTaskTotal HoursRatesTotalTotal HoursRationale
BASIC PERIOD
0001First Article/Production-FAT required
0001AAFirst ArticleProgram Management40.00$ 30.00$ 1,200.0040.00
Engineering20.00$ 45.00$ 900.0020.00
Engineering Support12.00$ 35.00$ 420.0012.00
Materials Management/Production Control30.00$ 23.00$ 690.0030.00
Quality Assurance16.00$ 32.00$ 512.0016.00
Shipping/Receiving6.00$ 30.00$ 180.006.00
Fixturing/Tooling20.00$ 22.00$ 440.0020.00
Total Hrs/Category:144.00$ 4,342.00144.00
MATERIAL (SUM FROM MATERIAL TAB)$ 11,872.82
CLIN 0001AA TOTAL$ 16,214.82
0001ABProduction UnitProgram / Setup161.34$ 30.00$ 4,840.20161.34
Sheet Metal Shop52.19$ 45.00$ 2,348.5552.19
Waterjet/Speciality Machine96.51$ 35.00$ 3,377.8596.51
Machine Shop89.18$ 23.00$ 2,051.1489.18
Welding Shop120.00$ 32.00$ 3,840.00120.00
Material Prep - Corrosion Ctrl8.00$ 30.00$ 240.008.00
Paint Shop$ - 0$ - 00.00
Assembly Shop63.00$ 32.00$ 2,016.0063.00
Material Control$ - 00.00
Packing/Crating
Total Hrs/Category:590.22$ 18,713.74590.22
MATERIAL (SUM FROM MATERIAL TAB)$ 1,206.32
CLIN 0001ABTOTAL$ 19,920.06
0002DATA/CDRLs
0002AATest PlanProgram Management15.00$ 30.00$ 450.0015.00
Engineering5.00$ 45.00$ 225.005.00
Engineering Support16.00$ 35.00$ 560.0016.00
Total Hrs/Category:36.00$ 1,235.0036.00
0002AATest ReportProgram Management15.00$ 30.00$ 450.0015.00
Engineering5.00$ 45.00$ 225.005.00
Engineering Support10.00$ 35.00$ 350.0010.00
Total Hrs/Category:30.00$ 1,025.0030.00
BASIC PERIOD TOTAL
Total Proposed Hours800.22800.22800.22
Total Proposed Labor$ 25,315.74
Total Proposed Material$ 13,079.14
Total Price Basic Period$ 38,394.88
OPTION YearsProduction
1001Production$ 19,920.06
escalation1.035
CLIN 1001 TOTAL$ 20,617.26
2001Production$ 20,617.26
escalation1.035
CLIN 2001 TOTAL$ 21,338.87
3001Production$ 21,338.87
escalation1.035
CLIN 3001 TOTAL$ 22,085.73

EXAMPLE

Replace W/ Proposal Data

Task Summary by CLIN

Solicitation #-FA8526-XX-P-XXXX
Quote # 1234 (Valid for 30 days)
Contractor-ABC Company
Date 2 May 2020
PROPOSED-Sum of Hours by Task (Contractor Use)GOVERNMENT Technical Review (For Official Use Only)
CLINSDescriptionTask

JACKSON, ROBERT A CIV USAF AFMC AFLCMC/WNKE:

Please modify this section to correspond with the Labor Task that are applicable with the requirement.

The tasks on the template are only examples and should be modified.# Hours PM# Hours LE# Hours SDE# Hours ASSY-3# Hours MACH# Hours QUALITYTotal Hours# Hours PM# Hours LE# Hours SDE# Hours ASSY-3# Hours MACH# Hours QUALITYTotal HoursRationale
BASIC PERIOD
0001First Article/Production-FAT required
0001AAFirst ArticleManufacturing-Machining220
Manufacturing-Fabrication00
Manufacturing Instructions00
Project Management550
In process inspections00000000
Test Unit712190
Assemble (per unit)00
Paint Unit00
Package for ship to customer00
Total Hrs/Category:7700120260000000
0001ABProduction UnitProject management00
In process inspections330
Manufacturing-Machining00
Manufacturing-Fabrication00
Test Unit660000000
Assemble (per unit)0
Paint Unit0
Package for ship to customer1212

Total Hrs/Category: 3 12 6 0 0 0 21 0 0 0 0 0 0 0

0002DATA/CDRLs
0002AATest PlanCreate work instructions00
Machining Proof Load Fixture330
First Article Test Plan (FATP)220
Total Hrs/Category:30002050000000
0002AATest ReportCreate work instructions00
Machining Proof Load Fixture660
First Article Test Report (FATR)880
Total Hrs/Category:806000140000000

Total Proposed Hours: 66 Total Objective Hours: 0

Option Year I
OPTION YearsProduction
1001ProductionLearning curve Hr Calculator
FA Starting PointLearning Curve
Prod190%
2001ProductionProd2
Prod3
Avg ProdERROR:#DIV/0!
3001Production

Option Year II

Option Year III

EXAMPLE

Replace W/ Proposal Data

Materials Breakout Template

Solicitation #-FA8526-XX-P-XXXX
Quote # 1234 (Valid for 30 days)
Contractor-ABC Company
Date 2 May 2020
MaterialsTechnical Review (For Official Use Only)
CLINSDescriptionPart NumberDescription/TypeUnit of MeasureUnit of CostQuantityExtended PriceQuantityRationale
0001First Article/Production-FAT required
0001AAFirst ArticleInsert, Foam, TopEA$ 540.241.00$ 540.24
Case, 29.75"x17.87"x18.49" (ID)EA$ 1,545.001.00$ 1,546.00
Insert, Foam, BottomEA$ 523.081.00$ 524.08
Transducer Assy, PressureEA$ - 01.00$ - 0
Plate, IdentEA$ 125.661.00$ 125.66
Bar Code PlateEA$ 125.661.00$ 125.66
Pressure Tranducer/Read Out (17G233286-1)EA$ 8,943.221.00$ 8,943.22
Nut, Locking, 4-40EA$ 0.128.00$ 0.96
Screw, Pan, #4-40x.625EA$ 0.258.00$ 2.00
SHIPPING COST$ 65.00
CLIN 0001AA MATERIAL TOTAL$ 11,872.82
0001ABProduction UnitWasher, Flat, #4EA$ 0.128.00$ 0.96
Cap, Pressure, ModifiedEA$ - 01.00$ - 0
Hose Assy, 20'EA$ 125.661.00$ 125.66
PadEA$ 125.661.00$ 125.66
TabEA$ 95.254.00$ 381.00
SpacerEA$ 63.184.00$ 252.72
Bolt AssyEA$ - 01.00$ - 0
AdapterEA$ 255.321.00$ 255.32
SHIPPING COST$ 65.00
CLIN 0001AB MATERIAL TOTAL$ 1,206.32
0002DATA/CDRLs
0002AATest Plan

0002AA Test Report

Total Proposed Qty: 44.00 26158.28 0 Total Objective Qty:

EXAMPLE

Replace W/ Proposal Data

File details come from the government source that posted it. Updated .