C-17_PSE_Solicitation_Template-FA8526-XX-P-XXXX-FINAL.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- Tensiometer, Cable - Life Raft Retractor Federal contract opportunity
- Solicitation number
- FA8526-21-Q-0023
- Issued by
- Department of the Air Force
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA852621Q0023_______0001.pdf | ||
| Attachments.pdf | ||
| FA8526-21-Q-0023_RFQ.pdf | ||
| Use_and_Non-Disclosure_Agreement.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR INSTRUCTIONS
| Solicitation #-FA8526-XX-P-XXXX | |
| Title-Peculiar Support Equipment XYZ | |
| INSTRUCTIONAL GUIDANCE | |
| Spreadsheet Worksheet Tab | Instructions for Specific SpreadSheet Worksheet Tab |
| NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED | |
| Incorporate into Column A, rows 1-4 the information requested as it relates to your solicitation (information will flow into the other tabs) | |
| Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation | |
| Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided) | |
| Total Summary Tab by CLIN | Incorporate into Columns C-F Labeled "Proposed Sum of Hours by Labor Category/Material (Contractor Use) the applicable labor categories and rates utilized by CLIN (Replace Labor Categories as necessary) |
| Add in additional rows under the related CLIN for additional labor categories needed (ensure formulas are adhered to for calculation purposes) | |
| Incorporate the hours for each labor category identified by CLIN | |
| Incorporate your total sum of material dollars proposed by CLIN from the Material Tab | |
| Incorporate your total dollars for Option CLINs (sample escalation provided) | |
| Ensure your data calculates appropriately |
| NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED | |
| Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation | |
| Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided) | |
| Task Summary by CLIN | Incorporate into Columns C-F Labeled "Proposed Sum of Hours by Task (Contractor Use) " the applicable tasks utilized by CLIN (Replace tasks as necessary) |
| Add in additional rows under the related CLIN for additional tasks needed (ensure formulas are adhered to for calculation purposes) | |
| Incorporate the hours for each task identified by CLIN against the categories provided (i.e. PM/LE/QUALITY) | |
| Ensure your data calculates appropriately |
| NOTE: "EXAMPLE-REPLACE W/ PROPOSAL DATA" IN RED | |
| Incorporate into Columns A & B the correct Contract Line Items (CLINS) and descriptions of each as located in Schedule B of the solicitation | |
| Add in new lines if more CLINS are required than what is presented in this tab (follow the exact layout as provided) | |
| Materials Breakout Template | Incorporate into Columns C-H Labeled "Material" the applicable material utilized by CLIN (Replace material as necessary) |
| Add in additional rows under the related CLIN for additional material as needed (ensure formulas are adhered to for calculation purposes) | |
| Incorporate the part number, unit of measure, unit price, and quantity | |
| Add in Shipping Costs as appropriate (Shipping Cost will be respresented as part of the sum of material pulled into the Summary Tab) | |
| Ensure your data calculates appropriately |
Total Summary Tab by CLIN
| Solicitation #-FA8526-XX-P-XXXX |
| Quote # 1234 (Valid for 30 days) |
| Contractor-ABC Company |
| Date 2 May 2020 |
| PROPOSED-Sum of Hours by Labor Category/Material (CONTRACTOR USE) | Government Technical Review (For Official Use Only) | ||||||
| CLINS | Description | Task | Total Hours | Rates | Total | Total Hours | Rationale |
| BASIC PERIOD | |||||||
| 0001 | First Article/Production-FAT required | ||||||
| 0001AA | First Article | Program Management | 40.00 | $ 30.00 | $ 1,200.00 | 40.00 | |
| Engineering | 20.00 | $ 45.00 | $ 900.00 | 20.00 | |||
| Engineering Support | 12.00 | $ 35.00 | $ 420.00 | 12.00 | |||
| Materials Management/Production Control | 30.00 | $ 23.00 | $ 690.00 | 30.00 | |||
| Quality Assurance | 16.00 | $ 32.00 | $ 512.00 | 16.00 | |||
| Shipping/Receiving | 6.00 | $ 30.00 | $ 180.00 | 6.00 | |||
| Fixturing/Tooling | 20.00 | $ 22.00 | $ 440.00 | 20.00 |
| Total Hrs/Category: | 144.00 | $ 4,342.00 | 144.00 | |||
| MATERIAL (SUM FROM MATERIAL TAB) | $ 11,872.82 | |||||
| CLIN 0001AA TOTAL | $ 16,214.82 | |||||
| 0001AB | Production Unit | Program / Setup | 161.34 | $ 30.00 | $ 4,840.20 | 161.34 |
| Sheet Metal Shop | 52.19 | $ 45.00 | $ 2,348.55 | 52.19 | ||
| Waterjet/Speciality Machine | 96.51 | $ 35.00 | $ 3,377.85 | 96.51 | ||
| Machine Shop | 89.18 | $ 23.00 | $ 2,051.14 | 89.18 | ||
| Welding Shop | 120.00 | $ 32.00 | $ 3,840.00 | 120.00 | ||
| Material Prep - Corrosion Ctrl | 8.00 | $ 30.00 | $ 240.00 | 8.00 | ||
| Paint Shop | $ - 0 | $ - 0 | 0.00 | |||
| Assembly Shop | 63.00 | $ 32.00 | $ 2,016.00 | 63.00 | ||
| Material Control | $ - 0 | 0.00 | ||||
| Packing/Crating | ||||||
| Total Hrs/Category: | 590.22 | $ 18,713.74 | 590.22 | |||
| MATERIAL (SUM FROM MATERIAL TAB) | $ 1,206.32 | |||||
| CLIN 0001ABTOTAL | $ 19,920.06 | |||||
| 0002 | DATA/CDRLs | |||||
| 0002AA | Test Plan | Program Management | 15.00 | $ 30.00 | $ 450.00 | 15.00 |
| Engineering | 5.00 | $ 45.00 | $ 225.00 | 5.00 | ||
| Engineering Support | 16.00 | $ 35.00 | $ 560.00 | 16.00 | ||
| Total Hrs/Category: | 36.00 | $ 1,235.00 | 36.00 | |||
| 0002AA | Test Report | Program Management | 15.00 | $ 30.00 | $ 450.00 | 15.00 |
| Engineering | 5.00 | $ 45.00 | $ 225.00 | 5.00 | ||
| Engineering Support | 10.00 | $ 35.00 | $ 350.00 | 10.00 | ||
| Total Hrs/Category: | 30.00 | $ 1,025.00 | 30.00 | |||
| BASIC PERIOD TOTAL | ||||||
| Total Proposed Hours | 800.22 | 800.22 | 800.22 | |||
| Total Proposed Labor | $ 25,315.74 | |||||
| Total Proposed Material | $ 13,079.14 | |||||
| Total Price Basic Period | $ 38,394.88 | |||||
| OPTION Years | Production | |||||
| 1001 | Production | $ 19,920.06 | ||||
| escalation | 1.035 | |||||
| CLIN 1001 TOTAL | $ 20,617.26 | |||||
| 2001 | Production | $ 20,617.26 | ||||
| escalation | 1.035 | |||||
| CLIN 2001 TOTAL | $ 21,338.87 | |||||
| 3001 | Production | $ 21,338.87 | ||||
| escalation | 1.035 | |||||
| CLIN 3001 TOTAL | $ 22,085.73 |
EXAMPLE
Replace W/ Proposal Data
Task Summary by CLIN
| Solicitation #-FA8526-XX-P-XXXX |
| Quote # 1234 (Valid for 30 days) |
| Contractor-ABC Company |
| Date 2 May 2020 |
| PROPOSED-Sum of Hours by Task (Contractor Use) | GOVERNMENT Technical Review (For Official Use Only) | ||
| CLINS | Description | Task |
JACKSON, ROBERT A CIV USAF AFMC AFLCMC/WNKE:
Please modify this section to correspond with the Labor Task that are applicable with the requirement.
| The tasks on the template are only examples and should be modified. | # Hours PM | # Hours LE | # Hours SDE | # Hours ASSY-3 | # Hours MACH | # Hours QUALITY | Total Hours | # Hours PM | # Hours LE | # Hours SDE | # Hours ASSY-3 | # Hours MACH | # Hours QUALITY | Total Hours | Rationale | |||
| BASIC PERIOD | ||||||||||||||||||
| 0001 | First Article/Production-FAT required | |||||||||||||||||
| 0001AA | First Article | Manufacturing-Machining | 2 | 2 | 0 | |||||||||||||
| Manufacturing-Fabrication | 0 | 0 | ||||||||||||||||
| Manufacturing Instructions | 0 | 0 | ||||||||||||||||
| Project Management | 5 | 5 | 0 | |||||||||||||||
| In process inspections | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| Test Unit | 7 | 12 | 19 | 0 | ||||||||||||||
| Assemble (per unit) | 0 | 0 | ||||||||||||||||
| Paint Unit | 0 | 0 | ||||||||||||||||
| Package for ship to customer | 0 | 0 | ||||||||||||||||
| Total Hrs/Category: | 7 | 7 | 0 | 0 | 12 | 0 | 26 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0001AB | Production Unit | Project management | 0 | 0 | |||||||||
| In process inspections | 3 | 3 | 0 | ||||||||||
| Manufacturing-Machining | 0 | 0 | |||||||||||
| Manufacturing-Fabrication | 0 | 0 | |||||||||||
| Test Unit | 6 | 6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| Assemble (per unit) | 0 | ||||||||||||
| Paint Unit | 0 | ||||||||||||
| Package for ship to customer | 12 | 12 |
Total Hrs/Category: 3 12 6 0 0 0 21 0 0 0 0 0 0 0
| 0002 | DATA/CDRLs | |||||||||||||||
| 0002AA | Test Plan | Create work instructions | 0 | 0 | ||||||||||||
| Machining Proof Load Fixture | 3 | 3 | 0 | |||||||||||||
| First Article Test Plan (FATP) | 2 | 2 | 0 | |||||||||||||
| Total Hrs/Category: | 3 | 0 | 0 | 0 | 2 | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| 0002AA | Test Report | Create work instructions | 0 | 0 | ||||||||||||
| Machining Proof Load Fixture | 6 | 6 | 0 | |||||||||||||
| First Article Test Report (FATR) | 8 | 8 | 0 | |||||||||||||
| Total Hrs/Category: | 8 | 0 | 6 | 0 | 0 | 0 | 14 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total Proposed Hours: 66 Total Objective Hours: 0
| Option Year I | |||||
| OPTION Years | Production | ||||
| 1001 | Production | Learning curve Hr Calculator | |||
| FA Starting Point | Learning Curve | ||||
| Prod1 | 90% | ||||
| 2001 | Production | Prod2 | |||
| Prod3 | |||||
| Avg Prod | ERROR:#DIV/0! | ||||
| 3001 | Production |
Option Year II
Option Year III
EXAMPLE
Replace W/ Proposal Data
Materials Breakout Template
| Solicitation #-FA8526-XX-P-XXXX |
| Quote # 1234 (Valid for 30 days) |
| Contractor-ABC Company |
| Date 2 May 2020 |
| Materials | Technical Review (For Official Use Only) | ||||||||
| CLINS | Description | Part Number | Description/Type | Unit of Measure | Unit of Cost | Quantity | Extended Price | Quantity | Rationale |
| 0001 | First Article/Production-FAT required | ||||||||
| 0001AA | First Article | Insert, Foam, Top | EA | $ 540.24 | 1.00 | $ 540.24 | |||
| Case, 29.75"x17.87"x18.49" (ID) | EA | $ 1,545.00 | 1.00 | $ 1,546.00 | |||||
| Insert, Foam, Bottom | EA | $ 523.08 | 1.00 | $ 524.08 | |||||
| Transducer Assy, Pressure | EA | $ - 0 | 1.00 | $ - 0 | |||||
| Plate, Ident | EA | $ 125.66 | 1.00 | $ 125.66 | |||||
| Bar Code Plate | EA | $ 125.66 | 1.00 | $ 125.66 | |||||
| Pressure Tranducer/Read Out (17G233286-1) | EA | $ 8,943.22 | 1.00 | $ 8,943.22 | |||||
| Nut, Locking, 4-40 | EA | $ 0.12 | 8.00 | $ 0.96 | |||||
| Screw, Pan, #4-40x.625 | EA | $ 0.25 | 8.00 | $ 2.00 | |||||
| SHIPPING COST | $ 65.00 | ||||||||
| CLIN 0001AA MATERIAL TOTAL | $ 11,872.82 | ||||||||
| 0001AB | Production Unit | Washer, Flat, #4 | EA | $ 0.12 | 8.00 | $ 0.96 | |||
| Cap, Pressure, Modified | EA | $ - 0 | 1.00 | $ - 0 | |||||
| Hose Assy, 20' | EA | $ 125.66 | 1.00 | $ 125.66 | |||||
| Pad | EA | $ 125.66 | 1.00 | $ 125.66 | |||||
| Tab | EA | $ 95.25 | 4.00 | $ 381.00 | |||||
| Spacer | EA | $ 63.18 | 4.00 | $ 252.72 | |||||
| Bolt Assy | EA | $ - 0 | 1.00 | $ - 0 | |||||
| Adapter | EA | $ 255.32 | 1.00 | $ 255.32 | |||||
| SHIPPING COST | $ 65.00 | ||||||||
| CLIN 0001AB MATERIAL TOTAL | $ 1,206.32 |
| 0002 | DATA/CDRLs |
| 0002AA | Test Plan |
0002AA Test Report
Total Proposed Qty: 44.00 26158.28 0 Total Objective Qty:
EXAMPLE
Replace W/ Proposal Data
File details come from the government source that posted it. Updated .