BOR_CCAO_2018(1)_Plans.pdf
PDF 7 MB Posted
- Attached to
- OR BOR CCAO 2018(1), HAYSTACK RESERVOIR PAVING PROJECT Federal contract opportunity
- Solicitation number
- 69056720B000022
About this file
This is a solicitation for the OR BOR CCAO 2018(1) Haystack Reservoir Paving Project. The solicitation involves minor grading and drainage work, placing crushed aggregate and asphalt concrete pavement on existing roads and campsites at the Haystack Reservoir in Oregon. The work will be performed for the Department of Transportation Federal Highway Administration and includes removing existing pavement and signs; installing erosion control measures, roadway aggregate, asphalt concrete pavement, culverts and signage; and temporary traffic control. The estimated quantities, plans, and specifications are provided for contractors to submit bids by the specified due date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| QA_11-13-2020.pdf | ||
| QA_11-12-2020.pdf | ||
| IFB Haystack.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location
APPROVED:
DATE
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
H.4-5
H.2-3
H.1
G.1-3
F.2-3
F.1
E.2-4
E.1
D.12
D.9-11
D.2-8
D.1
C.1-2
B.1
A.4
A.3
A.2
A.1
STANDARD DRAWINGS
PERMANENT TRAFFIC CONTROL
GROUP SITES
QUANTITIES
TABULATION OF PERMENANT TRAFFIC CONTROL
STANDARD DRAWINGS
TEMPORARY TRAFFIC CONTROL
EROSION CONTROL STANDARD DRAWINGS
TABULATION OF EROSION CONTROL QUANTITIES
DRAINAGE STANDARD DRAWINGS
TABULATION OF DRAINAGE QUANTITIES
COTTONWOOD 1 PLAN VIEW
GROUP SITES
PLAN-PLAN
TABULATION OF ROADWAY QUANTITIES
TYPICAL SECTIONS
SUMMARY OF QUANTITIES
SITE MAP
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
H. PERMANENT TRAFFIC CONTROL PLAN
G. TEMPORARY TRAFFIC CONTROL PLAN
F. EROSION CONTROL
E. DRAINAGE
D. PLAN SHEETS
C. TYPICAL SECTIONS
B. SUMMARIES
A. GENERAL INFORMATION
INDEX TO SHEETS
C. SANDERS
PROJECT MANAGER
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
P A
C F
I C
I O
E C
A N
COLUMBIA R
IV
ER
S N
A K E
R
IV
E R
D E S
C H
U T
E S
R I
V E
R
OREGON KEY MAP
Grants Pass
MEDFORD
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Bend
North
City
Baker
Dalles
The
WASHINGTON
I D
A H
O
NEVADACALIFORNIA
20 26
SCALE IN MILES
5 10 15 205
N
Opal City
Powel Butte
Roberts
Tumald Deschutes
Cline Falls Redmond
Prineville Junction O'Neil
Terretonne
Grizzly
Harrison Lake
Dry C re ek
D ry
R iv e r
D e s c h u te s
M c K e n z ie
C a n y o n
C re ek
Lake Simtustus
JEFFERSON
PROJECT LOCATION
Prineville Reservoir
CROOK
DESCHUTES
Lower Bridge
C. SANDERS
PROJECT MANAGER
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
V
ADT (2039)
ADT (2019)
15 MPH
minor grading and drainage work.
asphalt concrete pavement on the existing roads and campsites, Work includes placing crushed aggregate and
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
OREGON
JEFFERSON COUNTY
OR BOR CCAO 2018(1)
HAYSTACK RESERVOIR PAVING
LENGTH 1.2 MILES
Western Federal Lands Highway Division
Acting Chief of Engineering, on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
Lake
Malheur Lake
Harney
Lake
Summer
Lake
Klamath
Upper
Abert
Lake
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
Falls
Klamath
Culver
Metolius
Madras
Pilot Butte Alfalfa
Prineville
Reservoir
Haystack
State Park
Smith Rock
State Park
The Cove Palisades
See Sheet A.3 for Vicinity Map
FOREST
NATIONAL
OCHOCO
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
OREGON
JEFFERSON COUNTY
OREGON
JEFFERSON COUNTY
:2
P
M
A u g u s t
T it le
S h e e t
C
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \D e s ig n F il e s \o r a a a .d g n
STATE PROJECT
NUMBER
SHEET
OR BOR CCAO 2018(1) A.1
AND ABBREVIATIONS
PLAN SYMBOLS
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
U.S. CUSTOMARY DETAIL
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
DI
T
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Treeline; Individual Trees
Silt Fence
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
- no symbol -
EXISTING PROPOSED
wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Miscellaneous Utility Features
Building
Fiber Roll or Wattle
BH
TP
National Boundary
W west
RIP
G G
W
WNOTE:
NO SCALE
1.
Above Ground Tank; Underground Tank
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Control Point (Terrestrial and GPS); Jump Hub
Riprap
CP GPS
JH
T
DIdrwg(s).
dist.
diaph.
diag.
dia.
DHV
D jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o.c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Intermittent Drainage or Small Creek θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Transition
Toe of Fill
Top of Cut
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
M.P.
M.L.
mile post main line yd3 yd2 cubic yard(s) square yard on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
:3
A u g u s t
D e ta il
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \D e s ig n
F il e s \B
O R c c a o
(1
A
.d g n
DETAIL
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) A.2
HAYSTACK RESERVOIR
S W H a y s ta c k D r.
SW Rd.Haystack Reservoir
SW King Ln.
Rd
S W S o u th S id e R d
S W H a y s ta c k D r
N
See Site Map on Sheet A.4
SCALE IN MILES
Scale in miles
0.25 0.500.25
To H wy 9
~2 m ile s m ile s
C u lv e r
Prineville
~33 miles
Spring
Osborne
RECREATION AREA
SOUTH SHORE
SHORE CAMPGROUND
HAYSTACK WEST
CAMPGROUND & DAY USE
HAYSTACK RESERVOIR
NORTH PIER
:4
J u ly
V ic in it y M a p
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\D e s ig n
F il e s \o r a a c .d g n
VICINITY MAP
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) A.3
kcats yaH WS
Reservoir Rd
SCALE IN FEET (APPROXIMATE)
Scale in miles
250250 125 500
Site
Willow Group
Site
Juniper Group
Group Site
Cottonwood
Begin Project
W il lo w
W il lo w
A
W illow
W illow
1B
W il lo w
Ju n ip e r 1
Ju n ip e r 1
A
Ju ni pe r 2
C o tt o n w o o d
C o tto n w o o d
Main lin e
Mainline
Mainline
M a in li n e
RESERVOIR
HAYSTACK
SOUTH SHORE RECREATION AREA
end of loop stationing project begin stationing and
1. See Sheets D.2 and D.8 for
NOTES:
:5
A u g u s t
V ic in it y
M p
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \F o r S ig n o f f \o r a a d .d g n
SITE MAP
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) A.4
Sheet and Description
SECTION D SECTION E SECTION F SECTION G SECTION H
PLAN SHEETS DRAINAGE
EROSION
CONTROL
TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15701-0000 SOIL EROSION CONTROL LPSM All ALL
A0140 20301-2400 REMOVAL OF SIGN EACH 2 2
A0160 20301-3400 REMOVAL OF WHEELSTOP EACH 2 2
A0180 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 442 28 470
A0200 25126-0000 REMOVE AND RESET BOULDER EACH 34 2 36
A0220 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 3,448 252 3,700
A0240 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 2,114 186 2,300
A0260 60201-0800 24-INCH PIPE CULVERT LNFT 60 6 66
A0280 60704-0000 CLEANING CULVERT IN PLACE EACH 2 2
A0300 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 50 50
A0320 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40 40
A0340 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 30 30
A0360 62201-3750 CHAIN SAW HOUR 5 5
A0380 62301-0000 GENERAL LABOR HOUR 60 60
A0400 63302-0000 SIGN SYSTEM SQFT 17 17
A0420 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 526 4 530
A0440 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 4 4
A0460 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
A0480 64620-0000 REMOVE AND RESET (FIRE RING) EACH 3 3
MileStone: 100% Date Completed: In Progress Report Date: 08/27/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-A u g -2
:2 A
M
Remarks and/or Determination of Estimated Quantity
Pay Item Description Unit
Estimated Quantities
C
M yF ile s\
FH
W
A \D es ig n \H a ys ta ck
\F o r_
S ig n o ff
C C A O
(1
S O
Q .x ls m
]S h ee t
STATE PROJECT
B.1BOR CCAO 2018(1)OR
NUMBER
Existing ground
3-inch compacted depth
Asphalt concrete pavement, type 1
3-inch compacted depth
Asphalt concrete pavement, type 1
4-inch compacted depth
Roadway aggregate, method 2
4-inch compacted depth
Roadway aggregate, method 2
CL
FOOTNOTE:
[2]
[1]
CL
2%
2% 2%
2%
[2]
10'10'
Traveled way Traveled way
12'
Traveled way
1:2
VariesVaries
Varies Varies
NO SCALE
20 FOOT ROAD WIDTH
12 FOOT ROAD WIDTH
1:2 1:
1:
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
Mainline 26+86 to 34+47;
Mainline 10+00 to 18+89;
'Cottonwood 2' 800+00 to 803+10
'Cottonwood 1' 700+00 to 702+56;
'Juniper 2' 600+00 to 604+41;
'Juniper 1A' 550+00 to 551+64;
'Juniper 1' 500+00 to 503+24;
'Juniper 2' 604+41 to 604+89
'Willow 3' 400+00 to 402+26.98;
'Willow 2' 200+00 to 201+53;
'Willow 1B' 300+00 to 301+07;
'Willow 1A' 150+00 to 151+44;
'Willow 1' 100+00 to 104+87;
Mainline 34+47 to 47+06.06;
Mainline 18+89 to 26+86;
Willow 3 pavement width decreases to 18'-0" at 400+76.
Width varies at intersections.
C o n s tr u c ti o n l im it s
:1
A u g u s t
T y p ic a l
S e c ti o n s r t o f
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\F o r_ S ig n o ff
\T y p ic a l_
S e c ti o n a c .d g n
PART 1 OF 2
TYPICAL SECTIONS
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) C.1
4-inch compacted depth
Roadway aggregate, method 2
3-inch compacted depth
Asphalt concrete pavement, type 1, 2-inch compacted depth
Asphalt concrete pavement, type 1, 5-inch compacted depth
Roadway aggregate, method 2
2% Max slope all directions
2% Max
VariesVaries
VariesVaries Varies
1:4
1:4
1:
1:2
NO SCALE
Varies
CAMPSITE PADS
WILLOW, JUNIPER, AND COTTONWOOD
AND COTTONWOOD PARKING LOTS
WILLOW, JUNIPER,
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s will be marked by the CO.
2. The limits of the paved campsite pads and parking areas grade and slope requirements of the Architectural Barriers Act.
the Cottonwood Restroom Access Trail must meet the
1. Campsite paved pads, accessible parking spaces and
NOTES:
:1
A u g u s t
T y p ic a l
S e c ti o s r t o f
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \F o r_
S ig n o ff
\T y p ic a l_
S e c ti o n b c .d g n
PART 2 OF 2
TYPICAL SECTIONS
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) C.2
:4
A
A u g u s t
Q u a n ti ty
S h e e t
S h e t]
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \F o r_
S ig n o ff
\C C
A O
(1
Q
U A
N T
IT
IE
S .d g n
ROADWAY QUANTITIES
TABULATION OF
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.1
10+00
Saw cut
Proposed edge of pavement
Existing edge of gravel
Construction limits
Station reference line
BEGIN PROJECT
protect in place
Gate, Construction limits
Existing edge of gravel
Station reference line
Begin paving 10+00
10+00 to 10+30
Removal of pavement, asphalt
1 1
STOP
Mainline
Mainline
Removal of pavement, asphalt
LEGEND:
10+00
HAYSTACK RESERVOIR PAVING
BOR CCAO 2018(1)
10+00
R1-1
E= 2122416.17
N= 16167716.05
2. Centerlines are approximate.
1. See Section H for sign quantities.
NOTES:
4. Place signs according to the CO.
widths specified in typical sections.
3. Match existing radii with road
:2 e p te m b e r
D c m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
10+00 TO 15+70
PLAN-PLAN
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.2
Construction limits
Existing edge of gravel
Station reference line in place, 16+32
Cleaning culvert
See sheet D.8
End of Mainline loop, 18+63
24-inch pipe culvert, Station reference line
Construction limits
Existing edge of gravel
Mainline 16+72
Willow 1 100+00 =
Begin Willow 1, one way
Mainline 18+15
Willow 2 200+00 =
Begin Willow 2, one way
Mainline 18+15
Willow 2 200+00 =
Begin Willow 2, one way
Mainline 18+89
Willow 3 400+00 =
Begin Willow 3, two way of pavement
Proposed edge of pavement
Proposed edge begin 100+00 LT
Soil erosion control, fiber roll, begin 100+00 LT
Soil erosion control, silt fence, X
X begin mainline one way
End mainline two way
19+12 to 20+05
Removal of pavement, asphalt do not disturb
Existing restroom, Willow parking lot of pavement
Proposed edge
Silt fence
Fiber rolls
Remove and reset boulder
Removal of pavement, asphalt
Mainline
W ill o w
W il lo w
M a in li n e
LEGEND:
-0
'-0
2. Centerlines are approximate.
signing and striping quantities.
1. See Section H for parking lot
NOTES:
widths specified in typical sections.
3. Match existing radii with road
:4 e p te m b e r m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
15+25 TO 20+90
PLAN-PLAN
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.3
Construction limits
Existing edge of gravel
Station reference line
Proposed edge of pavement
Mainline 22+57
Juniper 1 500+00 =
Begin Juniper 1, one way
Construction limits
Existing edge of gravel
Proposed edge of pavement
Station reference line
23+64
Cleaning culvert in place, begin 25+63
Soil erosion control, fiber roll, begin 25+52
Soil erosion control, silt fence, Mainline
J u n ip e r
Mainline
LEGEND:
Silt fence
Fiber rolls
12' -0 widths specified in typical sections.
2. Match existing radii with road
1. Centerlines are approximate.
NOTES:
:4 e p te m b e r m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
20+50 to 26+75
PLAN-PLAN
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.4
Mainline 27+98
Juniper 2 600+00 =
Begin Juniper 2, one way line reference
Station line reference
Station
Construction limits
Construction limits of gravel
Existing edge of gravel
Existing edge of pavement
Proposed edge of pavement
Proposed edge
Mainline 29+58
Cottonwood 1 700+00 =
Begin Cottonwood 1, one way
Mainline 30+01
Cottonwood 2 800+00 =
Begin Cottonwood 2, one way end 27+39
Soil erosion control, silt fence, end 27+39
Soil erosion control, fiber roll, access trail
Cottonwood restroom
Cottonwood parking lot
X
0 3
X
X X
X
X X X X X X
X
X
X
X
Mainline
C o tto n w o o d
Cottonwood 2
LEGEND:
Silt fence
Fiber rolls
Remove and reset boulder
2'
-0
' -0
12' -0"
Mainline
J u n ip e r
29+54 LT
R6-1
2. Centerlines are approximate.
signing and striping quantities.
1. See Section H for parking lot
NOTES:
widths specified in typical sections.
3. Match existing radii with road
:4 e p te m b e r m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
26+50 to 31+75
PLAN-PLAN
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.5
R
Proposed edge of pavement
Construction limits
Existing edge of gravel
Station reference line
Construction limits
Proposed edge of pavement
Existing edge of gravel
Mainline 34+24
Cottonwood 2 803+10 =
End Cottonwood 2, one way begin 32+33
Plastic fence, begin 32+35
Soil erosion control, fiber roll, Station reference line
31+74 to 32+45
Removal of pavement, asphalt match existing, max 10% slope grade transition from 7 inches to
Roadway aggregate, Method 2 max 10% slope grade match existing, from 7 inches to
Method 2, transition
Roadway aggregate, Cottonwood parking lot do not disturb
Existing restroom, access trail
Cottonwood restroom
M ai nl in e
Mainline
C o tto n w o o d
LEGEND:
Silt fence
Fiber rolls Removal of pavement, asphalt
20'-0"
-0 widths specified in typical sections.
3. Match existing radii with road
2. Centerlines are approximate.
signing and striping quantities.
1. See Section H for parking lot
NOTES:
Method 2
Roadway aggregate, :4 e p te m b e r m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
31+50 to 36+50
PLAN-PLAN
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.6
Mainline 37+02
Cottonwood 1 702+56
End Cottonwood 1, one way
Station reference line
Station reference line
Construction limits
Construction limits
Existing edge of gravel
Existing edge of gravel
Proposed edge of pavement
Proposed edge of pavement
Mainline 40+23
Juniper 2 604+89 =
End Juniper 2, one way
X
XX
Mainl ine
Mainline
J u n ip e r
C o tt o n w o o d
LEGEND:
Silt fence
Fiber rolls
Remove and reset boulder
12' -0"
20'-0" widths specified in typical sections.
2. Match existing radii with road
1. Centerlines are approximate.
NOTES:
:3 e p te m b e r m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
36+25 to 41+75
PLAN-PLAN
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.7
END OF LOOP
Mainline 16+72
Willow 1 100+00 =
Begin Willow 1, one way
Willow 1 100+66
Willow 1A 150+00 =
Begin Willow 1A, one way
Station reference line
Station reference line
Construction limits
Construction limits
Existing edge of gravel
Existing edge of gravel
Proposed edge of pavement
Proposed edge of pavement
Main lin e
Mainli ne
M a in li n e
W illo w
W il lo w
A
LEGEND:
Silt fence
Fiber rolls
' -0
-0
20'-0"
47+06.06
BOR CCAO 2018(1)
E= 2122379.33
N=16168419.07 widths specified in typical sections.
2. Match existing radii with road
1. Centerlines are approximate.
NOTES:
:3 e p te m b e r m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
42+00 TO 47+06.06
PLAN-PLAN
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.8
Mainline 16+72
Willow 1 = 100+00
Begin Willow 1, one way
Willow 1 100+66
Willow 1A 150+00 =
Begin Willow 1A, one way
Willow 1 103+84
Willow 1B 300+00 =
Begin Willow 1B, one way
Mainline 18+15
Willow 2 200+00 =
Begin Willow 2, one way
Mainline 18+89
Willow 3 400+00 =
Begin Willow 3, two way
Willow 3 400+66
Willow 1 104+87 =
End Willow 1, one way
Willow 2 201+16
Willow 1A 151+44 =
End Willow 1A, one way
Willow 3 400+59
Willow 1B 301+07 =
End Willow 1B, one way
Willow 1 102+61
Willow 2 201+53 =
End Willow 2, one way
402+26.98
18' travel way
End Willow 3
Construction limits gravel
Edge of existing of pavement
Proposed edge end 102+24
Soil erosion control, silt fence, end 102+38
Soil erosion control, fiber roll, (fire ring)
Remove and reset match existing, max 10% slope grade transition from 7 inches to
Roadway aggregate, Method 2
10% longitudinal taper from edge of pavement
Roadway aggregate, Method 2
Willow parking lot match existing, max 10% slope grade transition from 7 inches to
Roadway aggregate, Method 2
Do not disturb restroom
Willow paved parking lot campsite pad
Willow paved slope max
2%
X
8 1
LEGEND:
Silt fence
Fiber rolls
M a in lin e
Main line
Willow 1
W illo w
W il lo w
A
W il lo w
B
W il lo w
12'-0"
12'-0"
12'-0"
12'- 0"
'-0 campsite pad parking lot and all directions
2% max slope parking lot all directions
2% max
Method 2
Roadway aggregate, reset boulder
Remove and
2. Centerlines are approximate.
signing and striping quantities.
1. See Section H for parking lot
NOTES:
marked by the CO.
4. Paved campsite pad limits will be widths specified in typical sections.
3. Match existing radii with road
:3 e p te m b e r m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
SITE
WILLOW GROUP
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.9
x x x
Mainline 22+57
Juniper 1 500+00 =
Start Juniper 1, one way
Juniper 1 501+38
Juniper 1A 550+00 =
Start Juniper 1A, one way
Mainline 27+98
Juniper 2 600+00 =
Start Juniper 2, one way
Juniper 1 502+82
Juniper 1A 551+64 =
End Juniper 1A, one way
Juniper 2 604+40
Juniper 1 503+24
End Juniper 1, one way
Begin 25+52
Soil erosion control, silt fence, End 27+34
Soil erosion control, silt fence, End 27+34
Soil erosion control, fiber roll, Begin 25+63
Soil erosion control, fiber roll, Remove and reset (fire ring)
Juniper paved parking lot A
Juniper paved parking lot B
Juniper paved parking lot C campsite pad
Juniper paved parking
RV
slope max
2%
X x x x x x xx x
Mainline 40+23
Juniper 2 604+89 =
End Juniper 2, one way x x
LEGEND:
Silt fence
Fiber rolls
Mainline
J u n ip e r
Ju ni pe r
J u n ip e r
A
M ainline
12'-0"
0"
20'-0" campsite pad all directions
2% max parking lot all directions
2% max reset boulder
Remove and widths specified in typical sections.
2. Match existing radii with road
1. Centerlines are approximate.
NOTES:
marked by the CO.
3. Paved campsite pad limits will be
:3 e p te m b e r
D m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
SITE
JUNIPER GROUP
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.10
R
.5
Mainline
Mainline 29+58
Cottonwood 1 700+00 =
Begin Cottonwood 1, one way
Construction limits
Mainline 30+01
Cottonwood 2 800+00 =
Begin Cottonwood 2, one way begin 32+35
Soil erosion control, fiber roll, begin 32+33
To protect wetland, Plastic fence, 802+37 pipe culvert, 24-inch
Remove and reset (fire ring)
Proposed edge of pavement
Mainline 34+24
Cottonwood 2 803+10 =
End Cottonwood 2, one way
Edge of existing gravel end 33+35 fiber roll, control, Soil erosion end 33+35
Plastic fence, X
X
X X X
X X X X
X
X
X X
X X X X
X do not disturb
Existing restroom, max 10% slope grade match existing, from 7 inches to
Method 2, transition
Roadway aggregate, slope grade match existing, max 10% transition from 7 inches to
Roadway aggregate, Method 2 campsite pad
Cottonwood paved
2-inch compacted depth
Asphalt concrete pavement, type 1, Existing ground
5-inch compacted depth
Roadway aggregate, method 2 access trail
Cottonwood restroom
Mainline 27+98
Juniper 2 600+00 =
Begin Juniper 2, one way
X
N
0 8
600600
2% Max
1:
1:2
Varies 5'-0" Varies
LEGEND:
Silt fence
Fiber rolls
Mainline
J u n ip e r 2 Cottonw ood 1
Cottonwood 2
12'-0"
'-0
12'-0"
27'-0" pad campsite directions
2% max all slope trail
5% max slope parking lot
2% max
RV parking slope max
2%
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
ACCESS TRAIL
COTTONWOOD RESTROOM
2. Centerlines are approximate.
signing and striping quantities.
1. See Section H for parking lot
NOTES:
Method 2
Roadway aggregate, reset boulder
Remove and marked by the CO.
4. Paved campsite pad limits will be widths specified in typical sections.
3. Match existing radii with road
:4 e p te m b e r
C O
T T
O N
W O
O D
G R
O U
P S
IT
E m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
COTTONWOOD GROUP SITE
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.11
Station reference line
Construction limits
Existing edge of gravel
X
Mainline 37+02
Cottonwood 1 702+56
End Cottonwood 1, one way
Mainline 29+58
Cottonwood 1 700+00 =
Begin Cottonwood 1, one way
X
X X
Proposed edge of pavement
M a in li n e
Remove and reset boulder
LEGEND:
Cotton wood 1
C o tt o n w o o d
12' -0"
' -0
20'-0"
M a in li n e
M a in lin e widths specified in typical sections.
2. Match existing radii with road
1. Centerlines are approximate.
NOTES:
:3 e p te m b e r
C O
T T
O N
W O
O
L A
N V
IE
W m y fi le s \f h w a \d e s ig n \h a y s ta c k
\f o r_ s ig n o ff \B
O R
C
C A
O
(1
P L
A N
.d g n
PLAN VIEW
COTTONWOOD 1
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) D.12
J H
10.4 x 16 60201 -0800
60704 -0000
Station M
IN
IM
U M
C O
V E R
-I
N C H
P
IP
E C
U
LV
E R T
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
S K E W
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el o w
B E V E
LS
V :n
H
B E V E
LS
V :n
H
REMARKS
See below for numbered notes
FEET LNFT EACH Lt Rt 16+32 1
18+63 1 36
AS, C,
GS
23+64 1
Cottonwood 2
802+37 1 24
AS, C,
GS
60 2 Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is thickness required AS Aluminized steel by the Std. 602-1 fill height table. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material
4. Minimum Cover is required by the Stds. 602-1 and 602-7. except __
PAY ITEM NUMBER
PROJECT TOTAL
TABULATION OF DRAINAGE QUANTITIES
C
M yF ile s\
FH
W
A \D es ig n \H ay st ac k\
Fo r_
S ig n of f\ [D ra in ag e_
Q u an ti ti es
.x ls x] S h ee t -A u g -2
:2 P
M Le ah W ilm ot
/2
N
Fi sc h er
/2
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
E.1
SHEET
NUMBER
BOR CCAO 2018(1)OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
NO SCALE
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
4.
3.
2.
1.
pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) E.2
:3
A u g u s t
D e p w w o r k \d
\S td D e t-
V ie w e r .d g
MULTIPLE PIPE INSTALLATION
PIPING PLUG
ON UNSTABLE MATERIAL
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
or SPAN
DIAMETER
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2017
REVISED: 4/1994 6/2005
not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
See Section 704 for bedding and backfill requirements.
dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
3.
2.
1.
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
NATURAL GROUND
ABOVE AND BELOW
whichever is less
Half diameter or or 36" (max.) for embankment installations
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) E.3
A u g u s t
S ta n d a r d
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\F o r_ S ig n o ff
\D ra in a g e
D e ta il s .d
MULTIPLE ROUND PIPE INSTALLATION SUPPLEMENTAL CONCRETE PIPE TIE
PIPING PLUG
TRENCH INSTALLATIONEMBANKMENT INSTALLATION
CONCRETE ROUND PIPE CULVERT LEGEND:
Bedding material (uncompacted).
Embankment material placed in layers
Impermeable backfill material.
FILL HEIGHT AND PIPE CLASS TABLE
BEDDING DEPTH
SIZE
PIPE
MINIMUM SPACING
EMBANKMENT TRENCHDIAMETER
DEPTHPIPE SIZE (H)
CLASS VCLASS IVCLASS IIICLASS II
TRENCH
CLASS VCLASS IVCLASS IIICLASS II
EMBANKMENT
Roadway embankment
Limits of pipe compaction
SECTION A-A
A
A
Bedding (See table)Bedding (See table)
H
Width
° 60°
H
H
H
H
(See table)
Minimum spacing
H
Finished subgrade before trench excavation embankment height
Finished subgrade or to springline backfill
Compacted
Piping plug end treatment
Culvert
Embankment slope
High water elevation
Pipe culvert holes (typ.)
Concrete pipe tie when precast
Tapered holes permitted over pipe joint
Do not install fastener
O Ring if required
2H2H
602-7
STANDARD APPROVED FOR USE 12/1993
DRAFT: 6/2008
REVISED: 4/1994 6/2005
CULVERT INSTALLATION
CONCRETE PIPE
compaction shown on Standard 602-3.
INCHES
DIAMETER
INCHES
COVER
MINIMUM
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET
> 54"
12" TO 54"
6"
4"
OVER 96"
36"-96"
12"-36"
48"
0.5H
15"
72"
72"
2H not exceeding 6" compacted depth.
1'-0" (min.)
" max.2
2'-9 ty p ic a l m a x
1'-0"±
1'-3" min.
1'-5" max.
1" dia. Joint tie
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
H H
H H
6.
5.
4.
3.
2.
1.
adjusted to tie into impervious material.
material is used for backfill. Width may be material at the pipe inlet where granular
Construct a piping plug of impermeable backfill install the pipe culvert according to the limits of pipe
Where unyielding or unstable material is encountered, the compaction limits shall be the walls of the trench.
in an embankment. For pipe installation in a trench, Pipe compaction limits shown are for pipe installation and rigid pavements.
pipe to the top of the pavement for both flexible
Measure maximum fill height from the top of the to the top of the pavement for rigid pavements.
culvert to the subgrade for flexible pavements, and
Measure minimum cover from the top of the pipe of camber or increase the pipe culvert gradient.
the elevation of the inlet invert, reduce the amount elevation on the parabolic curve as designed exceeds
Develop camber on a parabolic curve. If the midpoint ordinate amount equal to 1% of the pipe length.
a chord through the inlet and outlet inverts an
When directed, camber pipe culverts upwards from in the contract documents.
Use Supplemental Concrete Pipe Tie when specified
AASHTO Standard Specifications for Highway Bridges.
structural pipe designs meeting the criteria of may be increased on approval of site-specific
Maximum fill heights for pipe culvert installations lean concrete backfill in accordance with Section 614
Compacted backfill material placed in layers
" min.2 12'-6 not exceeding 6" compacted depth, or
" dia. hole for4
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) E.4
A u g u s t
S ta n d a r d
C o p y
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\F o r_ S ig n o ff
\D ra in a g e
D e ta il s .d
:1 e p te m b e r
P la n
S h e
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\F o r_ S ig n o ff
\B O
R
C C
A O
(1 h a .d g n
QUANTITIES
EROSION CONTROL
TABULATION OF
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) F.1
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil f o r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Silt fence reinforcement
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow m in m in m in
4" min.
6" min. trench 4.
3.
2.
1.
running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) F.2
:4
A u g u s t
S ta n d a r d p w w o r k \d
\E r o s io n C o n tr o l_
D e ta il s .d
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
Step 2: Backfill soil against fiber rolls
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø
U.S. CUSTOMARY DETAIL
DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber
NOTE:
disturbed areas
Runoff from ff o n ur f o n oi t c er i
D
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) F.3
:2
A u g u s t
D e
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\D e s ig n
F il e s \E ro s io n
C o n tr o l_
D e ta il s .d
G20-2
G20-2
G20-2M in o r R o a d
M a jo r R o a d
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
G20-2
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional) W13-1P
(optional) W13-1P xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
See Note 11 G20-1
See Note 11 G20-1
See Note 10 W20-1
See Note 10 W20-1
See Note 9 W16-8P W20-1 over
See Note 9 W16-8P W20-1 over
W20-1
Ro ad N ame
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
See Note 10 W20-1
See Note 10 W20-1 the distance to the work area in feet or in miles. Install an additional W20-1 The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) G.1
:5
A u g u s t
D e
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \D e s ig n
F il e s \T
T C
D e ta il s .d
Traffic flow
Traffic flow
W20-7W20-4
(optional)
WORK SPACE (optional)(optional)
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
50' - 100'
See Note 6
10' min.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
See Note 4
W20-1
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
50' - 100' (optional)
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) G.2
:0
A u g u s t
S ta n d a r d
C o p y
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\D e s ig n
F il e s \T
T C
D e ta il s .d
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f t r a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.5
1.5
1.5
1.5
NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, " dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) G.3
:5
A u g u s t
S ta n d rd
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \D e s ig n
F il e s \T
T C
D e ta il s .d
:1 e p te m b e r
P la n
S h e
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \F o r_
S ig n o ff
\B O
R C
C A
O (1 ja
Q u a n ti ti e s .d g n
QUANTITIES
PERMENANT TRAFFIC CONTROL
TABULATION OF
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) H.1
solid (white)
Pavement markings, type B, accessibility symbol
Pavement markings, type B, 45°
Removal of wheelstops
Removal of 2 signs
R7-8P
R7-8
RESERVED
PARKING
VAN
ACCESSIBLE
W il lo w
'-0
5'- 0"
Mainline
1. Place signs according to the CO.
NOTES:1
:0 e p te m b e r
W il lo w G ro u p S it
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\F o r
S ig n o f f \c a m p a n d p a r k in g a r e a s .d g n
WILLOW GROUP SITE
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) H.2
R7-8P
R7-8 accessibility symbol type B, Pavement markings, solid (white)
Pavement markings, type B, 45°
VAN
ACCESSIBLE
RESERVED
PARKING
11'-0"
5'-0"
Main line
Cottonwood 2
1. Place signs according to the CO.
NOTES:1
:5 e p te m b e r
C o tt o n w o o d
G r o u p
S it
M y
F il e s \F
H W
A \D e s ig n \H a y s ta c k
\F o r
S ig n o f f \c a m p a n d p a r k in g a r e a s .d g n
SITE
COTTONWOOD GROUP
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) H.3
SINGLE POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
MINIMUM DISTANCE TO SIGN
SIGN INSTALLATION ANGLE
WOOD POST SELECTION TABLE
Direction of traffic flow
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
TWO POST SIGNS
E d g e o f s h o u ld e r
E d g e o f t r a v e le d w a y
E d g e o f s h o u ld e r
E d g e o f t r a v e le d w a y
E d g e o f t r a v e le d w a y
E d g e o f s h o u ld e r
Location
Rural Districts
Residence Districts
Business or
See table for hole size post, parallel to sign face.
Field drill holes through a secondary sign mounted below another sign.
exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
E d g e o f t r a v e le d w a y
E d g e o f s h o u ld e r
Finish ground line
NO SCALE
CL post
Backfill material
W
0.15X0.35X0.35X0.15X ty p
Z
Y
H
H
H
V Y
Backfill material
W
0.125X0.25X0.25X0.25X0.125X
.5
Y Z
H
H
H
H ty p
D
V Y
V Y
H
Z ty p
D
Same post size
Same post size
Bottom of sign
Long side of post single post installations of post. Omit notch for
Saw cut notch full width
H
Same post size
Backfill material
(See Post Selection table)
Notch depth (where required)
W
W
Backfill material
Y
Z ty p
D
V Y
H
.5
Y
0.2X0.6X0.2X
W633-7
REVISED:
DETAIL APPROVED FOR USE 10/2009
WESTERN FEDERAL LANDS HIGHWAY DIVISION
(inch)
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
Product of X-Y-Z in CUFT
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
For all retroflectorized signs where W > 25'
6 ft 5 ft
7 ft 2 ft
V may be reduced by 1 foot in rural districts for
22 ft (max.)
X=14 ft (min.) to maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
18 ft (max.)
X=10 ft (min.) to
WOOD POSTS
INSTALLATION
PERMANENT SIGN
U.S. CUSTOMARY DETAIL
DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
" outside dia.) 4 1(1 oversized washer
" nonmetallic16
" oversized washer16 5" lock nut16
" bolt16
" bolt thru the post8
6" x 8" when located within the clear zone or if the post
NOTE:
all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
5.
4.
3.
2.
1.
of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions of a dimensions of the signs.
- Single sign, or back to back signs: X and Y are the overall
For the purpose of post selection X and Y are as follows:
longest post.
Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average soil fit field conditions.
indicate overall post length. Select post lengths to 4 thru H1H is vulnerable to being struck when placed outside the clear zone.
Traffic barrier protection is required for all posts larger than
STATE PROJECT
NUMBER
OR BOR CCAO 2018(1) H.4
:1
A u g u s t
D e
M y F il e s \F
H W
A \D e s ig n \H a y s ta c k \D e s ig n F il e s \P
T C
D e ta il s .d
TYPE
ACCESSIBILITY PARKING SPACE MARKING
"AHEAD" WORD MARKING "SCHOOL" WORD MARKING
"ONLY" WORD MARKING"YIELD" WORD MARKING"STOP" WORD MARKING
TURN LANE-USE ARROW PAVEMENT MARKING AREAS
NOTE:
NO SCALE
Turn and Through Lane-Use Arrow
Turn Lane-Use Arrow
Through Lane-Use Arrow
YIELD Word Marking
STOP Word Marking
SCHOOL Word Marking
ONLY Word Marking
AHEAD Word Marking
Accessibility Marking w/ border (Blue)
Accessibility Marking w/ border (White)
Accessibility Marking (symbol only) specified in the Striping Plans
Blue background when border in the Striping Plans
Wh…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .