BLANK IGE SOS.xls
XLS spreadsheet 44 KB Posted
- Attached to
- USCGC EDGAR CULBERTSON DD FY24 Federal contract opportunity
- Solicitation number
- 70Z08024QPBPL0008
About this file
This document contains a pricing estimate for ship repair and maintenance services. The estimate includes line items for inspecting, repairing, overhauling, cleaning, preserving, and maintaining various systems and components of the USCGC Edgar Culbertson, such as the topside exterior structure, hull plating, tanks and voids, watertight closures, propulsion shafting system, electrical power distribution system, bilge surfaces and piping, machinery ventilation system, HVAC duct system, rudder assemblies, stabilizing fins, bow thruster propeller and tunnel, and more. Pricing is provided using unit prices and estimated quantities. Additional line items cover composite labor rates, travel and per diem costs, and over and above/growth work labor rates and material markups. The related federal contract opportunity lists the solicitation number and name as 70Z08024QPBPL0008 for the USCGC Edgar Culbertson DD FY24 opportunity through the Department of Homeland Security US Coast Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 70Z08024QPBPL0008_0_US.pdf | ||
| 70Z08024QPBPL0008_0_US.pdf | ||
| EDGAR CULBERTSON (WPC 154) DD FQ2 BCM 24R0.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING ESTIMATE FOR: | |||||
| USCGC EDGAR CULBERTSON (WPC-154) DRYDOCK AVAILABILITY FY2024 | |||||
| Solicitation: 70Z08024QPBPL0008 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Topside Exterior Structure, Repair | JOB | |||
| D-002 | Hull Plating, Inspect | JOB | |||
| D-003 | Tanks and Voids, Inspect and Preserve | JOB | |||
| D-004 | Watertight Closures, Assess | JOB | |||
| D-005 | Louver Assembly, Overhaul | JOB | |||
| D-006 | Propulsion Shafting System, Inspect and Repair | JOB | |||
| D-007 | ASW/Firemain System Components, Renew/Overhaul | JOB | |||
| D-008 | Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below) | JOB | |||
| D-009 | Bilge Surface and Piping, Clean and Inspect | JOB | |||
| D-010 | Machinery Ventilation System, Clean | JOB | |||
| D-011 | HVAC Duct System, Clean | JOB | |||
| D-012 | Intake Plenums, Inspect and Repair | JOB | |||
| D-013 | Rudder Assemblies, Inspect and Repair | JOB | |||
| D-014 | Stabilizing Fins, Inspect and Repair | JOB | |||
| D-015 | Bow Thruster Propeller and Tunnel, Inspect and Repair | JOB | |||
| D-016 | Stern Launch Door, Inspect and Preserve | JOB | |||
| D-017 | Sewage and Grey Water System, Clean and Inspect | JOB | |||
| D-018 | Freeboard, Preserve | JOB | |||
| D-019 | Superstructure, Preserve | JOB | |||
| D-020 | Mast, Preserve | JOB | |||
| D-021 | Weatherdecks, Preserve | JOB | |||
| D-022 | U/W Body, Preserve | JOB | |||
| D-023 | Impressed Current Cathodic Protection (ICCP) and Anti-Fouling System, Inspect and Maintain | JOB | |||
| D-024 | Drydocking | JOB | |||
| D-025 | Temporary Services, Provide - Cutter | JOB | |||
| D-026 | Sea Trial Performance, Support, Provide | JOB | |||
| D-027 | Grey Water Tank, Preserve (Opt) | JOB | |||
| D-028 | Stern Tube Interiors, Preserve | JOB | |||
| O-00A | Composite Labor Rate | 0 | Hour | 0 | 0 |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||
| OA/G-001 | **Provide breakdown, as follows: | Hour | 3529 | ||
| Over and Above/Growth Labor Rate | |||||
| Unit Price: $________; Quantity: 3529; Unit of Issue: Hour; Extended Price: $____________ | |||||
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $300,000.00 | % | ||
| Unit Price: $300,000; Quantity: 1; Unit of Issue: Percent ________%; | |||||
| Extended Price: [$300,000.00 X percentage quoted]: $______________ | |||||
| Total Price of Over and Above/Growth |
&C(8/2/2023) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .