Bid Sheet.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Nederman Exhaust System State and local contract opportunity
- Solicitation number
- 60645A
- Issued by
- Arapahoe County, Colorado
About this file
The document is a Bid Sheet for the City of Aurora Public Safety Training Center (CAPSTC) diesel exhaust removal system replacement project in Colorado. The project involves completely removing the existing Plymovent exhaust system from three truck bays and installing a new Nederman diesel exhaust removal system, which will span the length of the 2nd and 3rd truck bays and a portion of the 1st bay. The scope includes installing new ductwork, a new exhaust fan, and revised electrical connections, with third-party commissioning by NORESCO to ensure proper installation and performance.
The bid breakdown sheet details multiple construction divisions, including General Requirements, Existing Conditions, Masonry, Thermal and Moisture Protection, Openings, Finishes, HVAC, and Electrical. The bid sheet provides a structure for contractors to price out different segments of the project, with a total bid compilation section. While specific pricing is not visible in the provided document, the bid sheet suggests a comprehensive approach to project costing across various technical and construction disciplines, indicating a structured procurement process for this specialized infrastructure upgrade at the public safety training facility.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment C.pdf | ||
| Attachment A.pdf | ||
| Project Manual Nederman Exhaust System (6065A).pdf | ||
| Attachment B.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID BREAKDOWN SHEET | ||||
| CAPSTC - NEDERMAN EXHAUST SYSTEM | ||||
| Date: | ||||
| Bidder (Name of Firm): | ||||
| Bidder (Representative): | ||||
| Division # | Division Name | Division Description | Base Bid Price | Alternate #1 |
| Division 1 | General Requirements | Site Access, Storage, Quality Control, Temporary Facilities and Controls, Execution, Cleaning and Waste Management, Starting and Adjusting, Etc. | ||
| Division 2 | Existing Conditions | Maintenance of Existing Conditions, Assessment, Demolition, Removal and Diversion of Construction Materials, etc. | ||
| Division 4 | Masonry | |||
| Division 7 | Thermal and Moisture Protection | |||
| Division 8 | Openings | |||
| Division 9 | Finishes | |||
| Division 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |||
| Division 26 | Electrical | |||
| Total Bid |
File details come from the government source that posted it. Updated .