Bid_Schedule.pdf

PDF 109 KB Posted

Attached to
WINNEMUCCA SEEDLING HANDPLANTING Federal contract opportunity
Solicitation number
140L3922Q0069
Issued by
Department of the Interior Bureau of Land Management Nevada Region

View the file

Other files for this federal contract opportunity

Other files attached to WINNEMUCCA SEEDLING HANDPLANTING, newest first.
File Type Posted
A04_SOW.pdf PDF
B03_SCA_Wage_Determination.pdf PDF
A06_Maps.pdf PDF
Sol_140L3922Q0069.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2022 Winnemucca District Seedling Hand Planting

Bid Schedule

Unit No. Description

Total

Unit

Acres*

Estimated

Plantable

Acres

Unit Price

(per acre) Total Price

Planting 1 year-old container and/or bare root Big

Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

1,950* 1,921 $ $

Planting 1 year-old container and/or bare root Big

Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

155* 127 $ $

Planting 1 year-old container and/or bare root Big

Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

410* 382 $ $

Planting 1 year-old container and/or bare root Big

Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

296* 268 $ $

Planting 1 year-old container and/or bare root Big

Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

330* 302 $ $

Contingency 1

Planting 1 year-old container and/or bare root

Big Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

545** ** - -

Contingency 2

Planting 1 year-old container and/or bare root

Big Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

1,300** ** - -

Contingency 3

Planting 1 year-old container and/or bare root

Big Sagebrush seedlings at 20’ x 20’ spacing (110 seedlings/plantable acre).

400** ** - -

TOTAL = 3,000 $ $

*Total acres accounts for the number of acres within the project area for the planting unit but is not a measure of actual planting area acres within the unit. 3,000 actual acres are to be planted across Units 1-5 at a planting rate of

110 plants/acre (330,000 seedlings total).

**Contingency Units 1-3 are only to be utilized if all plantable areas within Units 1-5 have been used and seedlings remain available for planting (330,000 seedlings = 3,000 acres).

NOTE:

The bid shall include the cost of all labor, equipment, supplies, materials, and incidentals to complete the work in the contract. Mobilization includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, plants, and incidentals to the project site;

and for other work and operations which must be performed, or cost incurred prior to beginning work and after completion on the various items on the project site. All costs associated with mobilization and transportation of plants to the project site need to be incorporated into the total cost per acre for planting.

Work will be measured and paid for by the number of acres that are satisfactorily completed in accordance with specifications in this contract. Payment will be made at the unit price per acre specified in the Bid Schedule and shall include cost of all work described in these specifications. All measurements will be based on a horizontal plane and will not include the unplantable areas of the project locations.

File details come from the government source that posted it. Updated .