Bid Notice.pdf

PDF 4 MB Posted

Attached to
Rock Pile Communications Improvement Project State and local contract opportunity
Solicitation number
G25109
Issued by
Kern County, Torrance City, California

About this file

This is a bid notice and contract documents package issued by the City of Tehachapi, a municipal government in Kern County, California, for the Rock Pile Communications Improvement project. The work consists of concrete, minor mechanical and electrical work, coordinating the installation of a precast building, and selective demolition on top of the Rock Pile within the Tehachapi Event Center and Rodeo Grounds located at Tehachapi, CA 93561. The bid schedule includes 12 line items covering mobilization and demobilization, clearing and grubbing, construction survey and staking, preparation of aggregate base (30 tons), prefab building coordination, electrical and lighting components, mechanical components, concrete foundations for a door landing and HVAC condenser (2 cubic yards), concrete foundation for a radio antenna and tower baseplate (4 cubic yards), installation of exterior site electrical conduit and conductors (200 linear feet), a new sub panel, and selective demolition. Sealed proposals must be submitted by 10:30 AM on May 26, 2026, at City Hall Annex, 117 South Robinson Street, Tehachapi, CA 93561. A non-mandatory job walk is scheduled for May 7, 2026, at 10:30 AM at the same location. Contract documents are available for examination at the City's office for a non-refundable $30 deposit per set.

Each bidder must submit a proposal guarantee in the form of cash, a cashier's check, certified check, or bidder's bond in an amount not less than 10 percent of the total bid amount, payable to the City of Tehachapi. The successful bidder must execute performance and payment bonds each equal to 100 percent of the contract amount within 15 calendar days of award notification. The contract requires compliance with prevailing wage requirements as determined by the Director of the California Department of Industrial Relations, workers' compensation insurance with statutory limits, general and automobile liability insurance, and builders' risk insurance. Contractors must be licensed to conduct business in California and licensed to perform the class of work defined by the contract documents, and must be registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. The contractor must provide a one-year guarantee on all materials and workmanship following acceptance of the work. The contract award will be made to the lowest responsible responsive bidder complying with all instructions and requirements contained in the contract documents.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF TEHACHAPI

Kern County, California

CONTRACT DOCUMENTS

CONSTRUCTION SPECIFICATIONS

G25209 Rock Pile Communications Improvement

April 2026

ROCK PILE COMMUNICATIONS IMPROVEMENT

MASTER TABLE OF CONTENTS

SECTION TITLE

001000 NOTICE INVITING SEALED PROPOSALS (BIDS) WHITE

004100 BID FORM WHITE

005200 AGREEMENT WHITE

006110 BID BOND WHITE

006111 PERFORMANCE BOND WHITE

006112 PAYMENT BOND WHITE

006220 CONTRACTOR’S CERTIFICATE REGARDING WORKERS’

COMPENSATION

WHITE

006221 WORKERS’ COMPENSATION AND EMPLOYERS’ LIABILITY

CERTIFICATE OF INSURANCE

WHITE

007000 GENERAL PROVISIONS GOLDENROD

SUPPLEMENTAL GENERAL PROVISIONS GREEN

TECHNICAL SPECIFICATIONS

ATTACHMENT A – STRUCTURE CAST PROPOSAL AND PLANS

GRAY

(PAGE LEFT BLANK INTENTIONALLY)

SECTION 001000 NOTICE INVITING SEALED PROPOSALS (BIDS)

FOR THE CONSTRUCTION OF: ROCK PILE COMMUNICATIONS IMPROVEMENT

FOR THE: CITY OF TEHACHAPI

NOTICE IS HEREBY GIVEN that the City Council of said City invites and will receive sealed proposals (bids) up to the hour of 10:30 AM on the 26th day of May 2026, for the furnishing to said City of all transportation, labor, materials, tools, equipment, services, permits, utilities, and other items necessary to construct said work. At said time, said proposals will be publicly opened and read aloud at, City Hall Annex 117 South Robinson Street

Tehachapi, CA 93561

Bids shall conform to and be responsive to the Contract Documents for the work. Copies of the Contract Documents are on file and may be examined in the office of the City, City Hall Annex 117 South Robinson Street

Tehachapi, CA 93561

Copies may be obtained from City of Tehachapi by depositing $30 per set, which deposit is non refundable.

Description of Work

Work will consist of concrete, minor mechanical and electrical work, coordinating the installation of a precast building, and selective demolition on top of the Rock Pile within the Tehachapi Event Center and Rodeo Grounds, Tehachapi, CA 93561.

A nonmandatory job walk will be held on May 7th at 10:30 AM beginning at Tehachapi City Hall Annex located at 117 South Robinson Street. Field visit to follow.

Each bid shall be submitted on a form furnished as part of the Contract Documents and must be accompanied by cash, a cashier's check, a certified check, or a Bidder's bond executed by an admitted surety insurer, or substitute pursuant to Section 995. 710 of the Code of Civil Procedure, in an amount not less than 10% of the amount of the bid, made payable to the order of or for the benefit of the CITY. The security of unsuccessful Bidders will be returned by the CITY no later than sixty (60) days following the date of award. Each bid shall be sealed and delivered to the CITY at the location designated in this notice for the opening of proposals at or before the time in this notice provided. The check or bond shall be given as security that the Bidder will enter into a contract with the CITY and furnish the required payment and performance bonds and certificates of insurance and endorsements if awarded the work, and will be declared forfeited if the Bidder refuses to timely enter into said contract or furnish the required bonds or certificates of insurance and endorsements if the Bidder's bid is accepted.

The City Council has obtained from the Director of the California Department of Industrial Relations a determination of the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which said work is to be performed for each craft, classification, or type of worker needed. Not less than the determined rates shall be paid to all workers employed in the

NOTICE INVITING SEALED PROPOSALS (BIDS)

G25209 - 16 Apr 2026 (S001000.DOC)

001000-1 of 2

BID FORM 004100-1 of 6 G25209 - 16 Apr 2026 (S004100.DOC)

SECTION 004100 BID FORM

PROPOSAL TO: CITY OF TEHACHAPI

FOR THE CONSTRUCTION OF: ROCK PILE COMMUNICATIONS IMPROVEMENT

Name of Bidder:

Business Address:

Phone No.

TO THE GOVERNING BODY OF THE CITY OF TEHACHAPI

Pursuant to and in compliance with your Notice Inviting Sealed Proposals (Bids) and the other documents relating thereto, the undersigned Bidder, being fully familiar with the terms of the Contract Documents, local conditions affecting the performance of the contract, subsurface and physical conditions, the character, quality, quantities, and scope of the work, the cost of the work at the place where the work is to be done, and having given such notice to the ENGINEER of all conflicts, errors and deficiencies that the Bidder has detected and that the resolution thereof by the ENGINEER is acceptable and that the Contract Documents are sufficient to convey an understanding of the terms and conditions for performing the work, hereby proposes and agrees to perform within the time stipulated in the contract, including all of its component parts and everything required to be performed, and to furnish any and all of the labor, material, tools, equipment, transportation, services, permits, utilities, and all other items necessary to perform the contract and complete in a workmanlike manner, all of the work required in connection with the construction of said work all in strict conformity with the plans and specifications and other contract documents, including Addenda Nos.____, ____, ____, and ____, for the prices hereinafter set forth.

The undersigned as Bidder, declares that the only persons or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any person, firm, or corporation; and he proposes and agrees, if the proposal is accepted, that he will execute a contract with the OWNER in the form set forth in the Contract Documents and that he will accept in full payment thereof the following prices, to wit:

BID FORM 004100-2 of 6

SCHEDULE OF WORK ITEMS

Item No.

Estimated Qty

Unit of Measure Description Unit Price Total Amount

Bid Schedule 1 1 LS Mobilization & Demobilization $_________ $____________ 2 1 LS Clearing / Grubbing / Scarify and Re-compact Top

Soil (95% RC) $_________ $____________ 3 1 LS Construction Survey and Staking $_________ $____________ 4 30 TN Preparation of Aggregate Base (Class II) below

Building $_________ $____________ 5 1 LS Prefab Building Coordination of Installation $_________ $____________ 6 1 LS Furnish and Install Electrical and Lighting

Components $_________ $____________ 7 1 LS Furnish and Install Mechanical Components $_________ $____________ 8 2 CY Pour Concrete Foundation for Door Landing and

HVAC Condenser $_________ $____________ 9 4 CY Pour Concrete Foundation for Radio Antenna and install Radio Tower Baseplate $_________ $____________ 10 200 LF Install Exterior site electrical conduit (Sheet Plans

E1.1) and Conductors $_________ $____________ 11 1 LS Furnish and Install New Sub Panel LA $_________ $____________ 12 1 LS Selective Demolition $_________ $____________

Total Bid Schedule (Items 1 through 12) $____________

It is understood that the comparison of bids will be based on the sum of Bid Items 1 through 12. It is also understood that the foregoing sums are solely for comparison of bids and that the Contractor’s compensation will be computed upon the basis of actual quantities furnished in awarded contract and the unit prices set forth in the bid schedules. The Owner may reject any or all bids.

BID FORM 004100-3 of 6

The CONTRACTOR shall comply with the Subletting and Subcontracting Act as set forth in Chapter 4100 of the Public Contract Code and Labor Code Section 1725.5. As required by Section 4104 of the Public Contract Code, the CONTRACTOR bidding shall hereinafter list the subcontractor(s) who will be the subcontractor(s) on the job for each particular trade or subdivision of the work whose value is in excess of one half of one percent of the total bid value and will state the firm name and principal location of the mill, shop, or office of each:

ACCOMPANYING THIS PROPOSAL IS_________________________________ (insert the words “bidder’s bond,” “cashier’s check,” “certified check,” or appropriate description of substitute security, as the case may be) in an amount equal to at least 10% of the total amount of the bid, payable to the

CITY OF TEHACHAPI

The undersigned deposits the above-named security as a proposal guarantee and agrees that it shall be forfeited to the OWNER in case this proposal is accepted by the OWNER and the undersigned fails to execute a contract with the OWNER as specified in the Contract Documents or fails to furnish the required payment and performance bonds, or substitute, and insurance documents. Should the OWNER be required to engage the services of an attorney in connection with the enforcement of this bid, Bidder promises to pay OWNER’s reasonable attorneys’ fees, incurred with or without suit.

The names of all persons interested in the foregoing proposals as principals are as follows: (NOTICE - If Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a general partnership, state true name of firm, also names of all individual partners composing firm; if a limited partnership, the names of all general partners and limited partners; if Bidder or other interested person is an individual, state first and last names in full; if the Bidder is a joint venture, state the complete name of each venturer).

Subcontractor (Name, Business Address, Phone)

Division of Work or Trade

Contractor License No. & Public Works

Contractor Registration No.

Bid Item No.

% of Bid Item Sub-contracted

Dollar Amount Based on Bid

Amount

BID FORM 004100-4 of 6

Bidder hereby confirms that it has all licenses and permits required by federal, state, and local statutes, regulations, and ordinances. The following are the CONTRACTOR’s applicable license numbers (add pages if needed):

CONTRACTOR’s License No. Expiration Date

Public Works Contractor Registration Number:

Pursuant to the requirements of California Business and Professions Code Section 7028.15(e), a bid submitted to the OWNER by a contractor who is not licensed pursuant to Chapter 9 of Division 3 of the Business and Professions Code shall be considered nonresponsive and shall be rejected as provided for by law.

Signature of Bidder:

Dated: ______________________, 20__.

NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation and the corporate seal; if Bidder is a partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership; if the Bidder is an individual, his signature shall be placed above; if the Bidder is a joint venture, the name of the joint venture shall be set forth above with the signature of an authorized representative of each venturer.

(SPACE LEFT BLANK INTENTIONALLY)

BID FORM 004100-5 of 6

NONCOLLUSION AFFIDAVIT

____________________________________________________, being first duly sworn, deposes and says that he/she is ________________________ of__________________________________ the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true;

and, further, that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository or to any member or agent thereof to effectuate a collusive or sham bid.

Bidder State of California ) ) ss.

County of )

On _________________ before me, , (Insert name and title of officer) personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

(Notary Seal) Signature of Notary Public

END OF SECTION

BID FORM 004100-6 of 6

AGREEMENT 005200-1 of 6 G25209 - 16 Apr 2026 (S005200.DOC)

SECTION 005200 AGREEMENT

THIS AGREEMENT, made and entered into by and between the

CITY OF TEHACHAPI

hereinafter referred to as “OWNER” and a corporation under the laws of the state of ;

a partnership composed of a joint venture composed of an individual doing business as ;

hereinafter referred to as “CONTRACTOR.”

OWNER and CONTRACTOR agree as follows:

(1) SCOPE OF WORK: CONTRACTOR will furnish all materials and will perform all of the work for the construction of

ROCK PILE COMMUNICATIONS IMPROVEMENT

in accordance with the plans and specifications and other contract documents therefor.

(2) TIME FOR COMPLETION: The work shall be completed within the times set forth in Section 007300. Time is of the essence, and forfeiture due to delay will be assessed as provided for in the General Provisions.

(3) CONTRACT SUM: OWNER will pay CONTRACTOR in accordance with the prices shown in the Bid Form.

(4) PAYMENTS: Monthly progress payments and the final payment will be made in accordance with the General Provisions as modified by the Special Provisions. The filing of the notice of completion by OWNER shall be preceded by acceptance of the work made only by an action of the Governing Body of OWNER in session.

(5) COMPLIANCE WITH PUBLIC CONTRACTS LAW: OWNER is a public agency in the State of California and is subject to the provisions of law relating to public contracts. It is agreed that all provisions of law applicable to public contracts are a part of this contract to the same extent as though set forth herein and will be complied with by CONTRACTOR.

AGREEMENT 005200-2 of 6

(6) CONTRACTOR’S REPRESENTATIONS: In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations:

(a) CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents;

(b) CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

(c) CONTRACTOR is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, and performance of the Work;

(d) CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except underground facilities) which have been identified in the Supplementary Conditions as provided in the General Provisions;

(e) CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) any additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereof;

(f) CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract times, and in accordance with the other terms and conditions of the Contract Documents;

(g) CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Contract Documents;

(h) CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data within the Contract Documents;

(i) CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR; and

(j) The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

AGREEMENT 005200-3 of 6

(7) ACCOUNTING RECORDS: CONTRACTOR shall check all materials, equipment, and labor entering into the Work and shall keep such full and detailed accounts as may be necessary for proper financial management under this Agreement, and the accounting methods shall be satisfactory to OWNER. OWNER shall be afforded access to all Contractor’s records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the cost of the Work and CONTRACTOR’S fee.

CONTRACTOR shall preserve all such documents for a period of three years after the final payment by OWNER.

(8) CONTRACT DOCUMENTS: The complete contract includes all the Contract Documents set forth herein, to wit: Notice Inviting Sealed Proposals (Bids), Bid Form, Agreement, Bid Bond, Performance Bond, Payment Bond, CONTRACTOR’s Certificate Regarding Workers’ Compensation, Certificate of Workers’ Compensation Insurance, Insurance documentation required, General Provisions, Special Provisions, Standard Specifications, Drawings, Plans, and also addenda thereto and supplemental agreements.

(9) SUCCESSOR AND ASSIGNS: OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.

(10) PROMPT PAYMENT: As required by California law, the provisions of California Public Contract Code Section 20104.50, regarding prompt payment to contractors, are hereby incorporated in their entirety.

(11) AIR POLLUTION: The CONTRACTOR shall comply with all air pollution control rules, regulations, ordinances, and statutes which apply to any work performed pursuant to the Contract, including any air pollution control rules, regulations, ordinances, and statutes specified in Section 11017 of the Government Code.

(12) COMPLIANCE WITH IRCA: Contractor acknowledges that contractor, and all subcontractors hired by contractor to perform services under this Agreement are aware of and understand the Immigration Reform and Control Act of 1986 (“IRCA”). Contractor and all subcontractors will not employ any person to perform labor or services under this Agreement who is not authorized to work in the United States under the terms of the IRCA. Contractor and all subcontractors are responsible for accurately and fully completing and submitting all Employment eligibility Verification forms for all of its employees and shall comply with all provisions set forth in the IRCA. If at any time the City becomes aware that contractor or subcontractor is employing a person to perform labor or services under this Agreement who is not authorized to work in the United States, the City retains the right to terminate the Agreement pursuant to Article 7-19 of the General Provisions of this Agreement. In addition, contractor agrees to indemnify, defend, and hold harmless, City, its agents, officers and employees, for any liability, damages, penalties, fines, or cause of action arising out of or relating to any claims that contractor’s employees or the employees of any subcontractor hired by contractor, are not authorized to work in the United States for contractor or its subcontractor and any other claims based on alleged IRCA violations committed by contractor or contractor’s subcontractors.

This Agreement is executed by the OWNER pursuant to an action of its Governing Body in session on _______________, 20__, authorizing the same, and CONTRACTOR has caused this Agreement

AGREEMENT 005200-4 of 6 to be duly executed. The effective date will be the last date of execution by the parties.

Dated: , 20__ By (Authorized Representative of OWNER)

Title:

Dated: , 20__

(CONTRACTOR)

By (Authorized Representative of CONTRACTOR)

(Seal if Corporation) Title

(Attach Acknowledgment for Authorized Representative of CONTRACTOR)

AGREEMENT 005200-5 of 6

CERTIFICATE OF CONTRACTOR

I,___________________________________________________, certify that I am a/the

______________________ [designate sole proprietor, partner in partnership, or specify corporate office, e.g., secretary] in the entity named as CONTRACTOR in the foregoing contract.

I hereby expressly certify that the name of the entity to which I am associated is

___________________________________; that this entity is in good standing and has complied with all applicable laws and regulations, and that I have been expressly authorized by the proper parties in this entity to execute this contract on behalf of the above-named entity.

ATTEST:

Name _______________________ (Please Type)

Title ______________________

State of California ) County of )

On this _______ day of ____________________, 20__, before me personally came ____________________________, proved to me on the basis of satisfactory evidence, who being duly sworn, did depose and say: that (he/she) is an authorized representative of the CONTRACTOR and acknowledged to me that (he/she) executed the within instrument on behalf of said CONTRACTOR, _____________________________.

In witness whereof, I have signed and affixed my official seal on the date in this certificate first above written.

Signature (Seal) Notary Public

AGREEMENT 005200-6 of 6

BID BOND 006110-1 of 2 G25209 - 16 Apr 2026 (S006110.DOC)

SECTION 006110 BID BOND

We, as Principal, and as Surety, jointly and severally, bind ourselves, our heirs, representatives, successors and assigns, as set forth herein, to the

(herein called OWNER) for payment of the penal sum of

_________________________ Dollars ($________________________), lawful money of the United States. Principal has submitted the accompanying bid for the construction of

ROCK PILE COMMUNICATIONS IMPROVEMENT

If the Principal is awarded the contract and enters into a written contract, in the form prescribed by the OWNER, at the price designated by his bid, and files two bonds with the OWNER, or substitute security in lieu thereof, one to guarantee payment for labor and materials and the other to guarantee faithful performance, in the time and manner specified by the OWNER, and carries all insurance in type and amount which conforms to the Contract Documents and furnishes required certificates and endorsements thereof, then this obligation shall be null and void; otherwise it shall remain in full force and effect.

Forfeiture of this bond, or any deposit made in lieu thereof, shall not preclude the OWNER from seeking all other remedies provided by law to cover losses sustained as a result of the Principal’s failure to do any of the foregoing.

BID BOND 006110-2 of 2 G25209 - 16 Apr 2026 (S006110.DOC)

Principal and Surety agree that if the OWNER is required to engage the services of an attorney in connection with the enforcement of this bond, each shall pay OWNER’s reasonable attorney’s fees incurred with or without suit.

Executed on , 20

PRINCIPAL

(Seal if Corporation) By

Title

(Attach Acknowledgment of Authorized Representative of Principal)

Any claims under this bond may be addressed to:

(name and address of Surety)

(name and address of Surety’s agent for service of process in California, if different from above)

(telephone number of Surety’s agent in California)

(Attach Acknowledgment)

SURETY

By (Attorney-in-Fact)

NOTICE:

No substitution or revision to this bond form will be accepted. Sureties must be authorized to do business in and have an agent for service of process in California. Certified copy of Power of Attorney must be attached.

PERFORMANCE BOND 006111-1 of 2 G25209 - 16 Apr 2026 (S006111.DOC)

SECTION 006111 PERFORMANCE BOND

as Surety, jointly and severally, bind ourselves, our heirs, representatives, successors and assigns, as set forth herein, to the

____________________________ Dollars ($_____________________), lawful money of the United States. OWNER has awarded Principal a contract for the construction of

ROCK PILE COMMUNICATIONS IMPROVEMENT

THE CONDITION OF THIS OBLIGATION IS SUCH that if the Principal shall in all things abide by and well and truly keep and perform the covenants, and agreements in the said contract, and any alteration thereof made as therein provided, on his part to be kept and performed at the time and in the manner therein specified, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall indemnify and save harmless the OWNER, the ENGINEER, the OWNER'S REPRESENTATIVE, and their consultants, and each of their directors, officers, employees and agents, as therein stipulated, this obligation shall become null and void, otherwise, it shall be and remain in full force and effect.

Surety agrees that no change, extension of time, alteration, or addition to the terms of the contract, or the work to be performed thereunder, or the plans and specifications shall in any way affect its obligation on this bond, and it does hereby waive notice thereof.

PERFORMANCE BOND 006111-2 of 2 G25209 - 16 Apr 2026 (S006111.DOC)

Principal and Surety agree that if the OWNER is required to engage the services of an attorney in connection with the enforcement of this bond, each shall pay OWNER’s reasonable attorney’s fees incurred, with or without suit, in addition to the above sum.

Executed in three original counterparts on , 20

PRINCIPAL

(Seal if Corporation) By

Title

(Attach Acknowledgment of Authorized Representative of Principal)

Any claims under this bond may be addressed to:

(name and address of Surety)

(name and address of Surety’s agent for service of process in California, if different from above)

(telephone number of Surety’s agent in California)

(Attach Acknowledgment)

SURETY

By (Attorney-in-Fact)

NOTICE:

No substitution or revision to this bond form will be accepted. Sureties must be authorized to do business in and have an agent for service of process in California. Certified copy of Power of Attorney must be

PAYMENT BOND 006112-1 of 2 G25209 - 16 Apr 2026 (S006112.DOC)

SECTION 006112 PAYMENT BOND

as Surety, jointly and severally, bind ourselves, our heirs, representatives, successors and assigns, as set forth herein, to the

________________________ Dollars ($__________________________), lawful money of the United States. OWNER has awarded Principal a contract for the construction of

ROCK PILE COMMUNICATIONS IMPROVEMENT

If Principal or any of his subcontractors fails to pay any of the persons named in Section 3181 of the California Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract or during the one-year guarantee period, or for any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to such work and labor, then Surety will pay the same in an amount not exceeding the sum specified above, and also will pay, in case suit is brought upon this bond, such reasonable attorney’s fees as shall be fixed by the court.

This bond shall inure to the benefit of any of the persons named in Section 3181 of the California Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Surety agrees that no change, extension of time, alteration, or addition to the terms of the contract, or the work to be performed thereunder, or the drawings and specifications shall in any way affect its obligation on this bond, and it does hereby waive notice thereof.

Principal and Surety agree that should OWNER become a party to any action on this bond that, each will also pay OWNER’s reasonable attorney’s fees incurred therein in addition to the sum above set forth.

PAYMENT BOND 006112-2 of 2 G25209 - 16 Apr 2026 (S006112.DOC)

Executed in three original counterparts on , 20

PRINCIPAL

(Seal if Corporation) By

Title

(Attach Acknowledgment of Authorized Representative of Principal)

Any claims under this bond may be addressed to:

(name and address of Surety)

(name and address of Surety’s agent for service of process in California, if different from above)

(telephone number of Surety’s agent in California)

(Attach Acknowledgment)

SURETY

(Attorney-in-Fact)

NOTICE:

No substitution or revision to this bond form will be accepted. Sureties must be authorized to do business in and have an agent for service of process in California. Certified copy of Power of Attorney must be

CONTRACTOR'S CERTIFICATE REGARDING WORKERS' 006220-1 of 2

COMPENSATION

G25209 - 16 Apr 2026 (S006220.DOC)

SECTION 006220 CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION

Description of Contract: CITY OF TEHACHAPI

ROCK PILE COMMUNICATIONS IMPROVEMENT

Labor Code Section 3700 provides (in part):

“Every employer except the State shall secure the payment of compensation in one or more of the following ways:

(a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State.

(b) By securing from the Director of Industrial Relations a certificate of consent to self-insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his employees.”

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

Dated: _______________, 20___

(CONTRACTOR)

By

(Official Title)

(SEAL)

(Labor Code Section 1861 provides that the above certificate must be signed and filed by the CONTRACTOR with the OWNER prior to performing any work under this contract.)

CONTRACTOR'S CERTIFICATE REGARDING WORKERS' 006220-2 of 2

COMPENSATION

G25209 - 16 Apr 2026 (S006220.DOC)

WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY 006221-1 of 2

CERTIFICATE OF INSURANCE

G25209 - 16 Apr 2026 (S006221.DOC)

SECTION 006221 WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY CERTIFICATE OF

INSURANCE

Description of Contract: CITY OF TEHACHAPI

ROCK PILE COMMUNICATIONS IMPROVEMENT

Type of Insurance: Workers’ Compensation and Employers’ Liability Insurance

THIS IS TO CERTIFY that the following policy has been issued by the below-stated company in conformance with the requirements of Article 3-4 of the General Provisions and is in force at this time, and is in a form approved by the Insurance Commissioner.

The Company will give at least ten (10) days’ written notice to the OWNER prior to cancellation of said policy for nonpayment of premium and thirty (30) days’ written notice to the OWNER prior to cancellation of said policy for any other reason.

POLICY NUMBER EXPIRATION DATE LIMITS OF LIABILITY

Workers’ Compensation:

Statutory Limits Under the Laws of the State of California

Employers’ Liability:

$ Each Accident

$ Disease - Policy Limit

$ Disease - Each Employee

Named Insured (CONTRACTOR) Insurance Company

Street Number Street Number

City and State City and State

(Company Representative)

(SEE NOTICE ON PAGE 2)

WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY 006221-2 of 2

CERTIFICATE OF INSURANCE

G25209 - 16 Apr 2026 (S006221.DOC)

Insurance Company Agent for Service of Process in California:

Name

Agency

Street Number

City and State

Telephone Number

This certificate is issued as a matter of information only and confers no rights upon the certificate holder.

This certificate does not amend, extend, or alter the coverage afforded by the policy listed herein.

This is to certify that the policy has been issued to the named insured for the policy period indicated, notwithstanding any requirement, term, or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afforded by the policy described herein is subject to all the terms, exclusions, and conditions of such policy.

NOTICE:

If the insurance called for is provided by more than one insurance company, a separate certificate in the exact above form shall be provided for each insurance company.

GENERAL PROVISIONS TABLE OF CONTENTS-1

CA122007C

SECTION 007000 GENERAL PROVISIONS

TABLE OF CONTENTS

ARTICLE 1 DEFINITIONS, TERMS, AND ABBREVIATIONS

1-1 DEFINITIONS

1-2 TERMS

1-3 ABBREVIATIONS

ARTICLE 2 PROPOSAL REQUIREMENTS AND CONDITIONS

2-1 CONTRACT DOCUMENTS

2-2 LICENSE

2-3 PROPOSALS

2-4 WITHDRAWAL OF BID

2-5 BIDDERS INTERESTED IN MORE THAN ONE BID

2-6 INTERPRETATION OF PLANS AND OTHER CONTRACT DOCUMENTS

2-7 ADDENDA

2-8 EXISTING CONDITIONS AND EXAMINATION OF CONTRACT DOCUMENTS

2-9 PUBLIC WORK CONTRACT BIDDER QUALIFICATION

ARTICLE 3 AWARD AND EXECUTION OF CONTRACT

3-1 AWARD OF CONTRACT OR REJECTION OF BIDS

3-2 EXECUTION OF CONTRACT

3-3 BONDS

3-4 INSURANCE REQUIREMENTS

3-5 FAILURE TO EXECUTE CONTRACT

ARTICLE 4 SCOPE OF WORK

4-1 WORK TO BE DONE

4-2 CHANGES IN THE WORK

4-3 OBSTRUCTIONS

4-4 UTILITIES

4-5 PLANS AND SPECIFICATIONS FURNISHED BY THE OWNER

4-6 FINAL CLEANUP

ARTICLE 5 QUALITY OF THE WORK

5-1 AUTHORITY OF THE OWNER'S REPRESENTATIVE

5-2 SUPPLEMENTAL DRAWINGS

5-3 CONFORMITY WITH CONTRACT DOCUMENTS AND ALLOWABLE DEVIATIONS

5-4 MANUFACTURER'S INSTRUCTIONS

5-5 COORDINATION OF PLANS AND SPECIFICATIONS

5-6 INTERPRETATION OF PLANS AND SPECIFICATIONS

5-7 ERRORS OR DISCREPANCIES NOTED BY CONTRACTOR

5-8 SUPERVISION AND SUPERINTENDENCE

5-9 SHOP DRAWINGS

5-10 QUALITY AND SAFETY OF MATERIALS AND EQUIPMENT

5-11 STANDARDS, CODES, SAMPLES, AND TESTS

5-12 OBSERVATION OF WORK BY OWNER'S REPRESENTATIVE

5-13 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK

5-14 ONE-YEAR GUARANTEE

ARTICLE 6 PROSECUTION AND PROGRESS

6-1 SUBCONTRACTING

6-2 ASSIGNMENT

6-3 CONTRACTOR'S CONSTRUCTION SCHEDULE AND COST BREAKDOWN

GENERAL PROVISIONS TABLE OF CONTENTS-2

6-4 TIME FOR COMPLETION AND FORFEITURE DUE TO DELAY

6-5 EXTENSION OF TIME

6-6 USE OF COMPLETED PORTIONS

ARTICLE 7 LEGAL RELATIONS AND RESPONSIBILITIES

7-1 OBSERVING LAWS AND ORDINANCES

7-2 PERMITS AND LICENSES

7-3 INVENTIONS, PATENTS, AND COPYRIGHTS

7-4 PUBLIC CONVENIENCE AND SAFETY

7-5 RESPONSIBILITY FOR LOSS, DAMAGE, OR INJURIES

7-6 CONTRACTOR'S RESPONSIBILITY FOR THE WORK

7-7 PRESERVATION OF PROPERTY

7-8 REGIONAL NOTIFICATION CENTER CONTACT

7-9 EXCAVATION

7-10 SAFETY

7-11 PERSONAL LIABILITY

7-12 INDEMNITY

7-13 HOURS OF LABOR

7-14 PREVAILING WAGE

7-15 APPRENTICES

7-16 WARRANTY OF TITLE

7-17 PROPERTY RIGHTS IN MATERIALS

7-18 MUTUAL RESPONSIBILITY OF CONTRACTORS

7-19 TERMINATION FOR BREACH

7-20 TERMINATION FOR GRIEVANCE

7-21 NOTICE AND SERVICE THEREOF

7-22 PROVISION INTEGRITY

7-23 ATTORNEYS' FEES

7-24 LANDS AND RIGHTS-OF-WAY

7-25 WAIVER OF RIGHTS

7-26 TAXES

7-27 ASSIGNMENT OF ANTI-TRUST ACTIONS

7-28 PAYROLL RECORDS

7-29 RESOLUTION OF CLAIMS

7-30 CONTROLLING LAW

7-31 HEADINGS

ARTICLE 8 CONTRACTOR'S INSURANCE

8-1 GENERAL

8-2 WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY INSURANCE

8-3 GENERAL AND AUTOMOBILE LIABILITY INSURANCE

8-4 BUILDERS' RISK "ALL RISK" AND INSTALLATION FLOATER INSURANCE

8-5 EARTHQUAKE AND FLOOD INSURANCE

8-6 CONTRACTOR’S POLLUTION LIABILITY INSURANCE

8-7 CONTRACTOR'S LIABILITY NOT LIMITED BY INSURANCE

ARTICLE 9 ESTIMATES AND PAYMENTS

9-1 PAYMENT FOR CHANGES IN THE WORK

9-2 PROGRESS PAYMENTS

9-3 FINAL ESTIMATE AND PAYMENT

9-4 OWNER'S RIGHT TO WITHHOLD

9-5 WITHHELD CONTRACT FUNDS

9-6 REQUIRED RELEASES

GENERAL PROVISIONS 007000-1

ARTICLE 1 DEFINITIONS, TERMS, AND ABBREVIATIONS

1-1 DEFINITIONS

Whenever the following terms occur in the Contract Documents, the meaning shall be interpreted as follows:

ACCEPTANCE, FINAL ACCEPTANCE. The formal action by the Owner accepting the work as being complete.

ACCEPTED BID. The bid (proposal) accepted by the Owner.

ADDENDA. Written or graphic instruments issued prior to the opening of bids which clarify, correct, or change the bidding requirements and the Contract Documents.

AGREEMENT. The written instrument which is evidence of the agreement between Owner and Contractor covering the work.

BIDDER. Any individual, partnership, corporation, joint venture, or other combination thereof submitting a proposal for the work contemplated, acting directly or through an authorized representative.

CALENDAR DAYS. Of which the contract is based refers to consecutive days as measured on a calendar without regard for weekends or holidays.

CONTRACT. The entire and integrated written agreement executed between the Owner and the Contractor concerning the work. The Contract supersedes prior negotiations, representations or agreements, whether written or oral.

CONTRACTOR. The individual, partnership, corporation, joint venture, or other combination thereof who has entered into the Contract with the Owner for the performance of the work. The term "Contractor" means the Contractor or its authorized representative.

CONTRACT DOCUMENTS. The Contract Documents set forth in the Agreement; also any and all supplemental agreements amending or extending the work contemplated. Supplemental agreements are written agreements covering alterations, amendments, or extensions to the Contract and include Contract change orders.

DAYS. Unless otherwise specified, days shall mean calendar days.

ENGINEER. The term "Engineer" means the Engineer or its authorized representative.

OWNER. The public entity identified as such in the Agreement. The term "Owner" means the Owner or its authorized representative.

OWNER'S REPRESENTATIVE. The person or firm authorized in writing by the Owner to represent it during the performance of the work by the Contractor. The Owner's Representative means the Owner's Representative or its assistants.

PLANS, DRAWINGS. The plans (drawings), or reproductions thereof, which show the location, character, dimensions, and scope of the work to be done.

SPECIAL PROVISIONS. Additions, deletions, and changes to the General Provisions and Standard Specifications.

GENERAL PROVISIONS 007000-2

SPECIFICATIONS. The written provisions and requirements contained in the General Provisions and Standard Specifications as supplemented by the Special Provisions.

STANDARD SPECIFICATIONS. The Contract Documents identified or referenced as such.

SUBCONTRACTOR. An individual, partnership, corporation, joint venture, or other combination thereof who has a contract with the Contractor to perform any of the work at the site.

Subcontractor also means an individual, partnership, corporation, joint venture, or other combination thereof who has a contract with another subcontractor to perform any of the work at the site.

STANDARD DRAWINGS, STANDARD PLANS. That portion of the plans identified or referenced as such.

UTILITY. Public or private fixed works for the transportation of fluids, gases, power, signals, or communications.

WORK. Any and all obligations, duties, and responsibilities necessary to complete the construction assigned to, or undertaken by, the Contractor pursuant to the Contract Documents including all labor necessary to produce such construction and all materials, equipment, and supplies incorporated or to be incorporated in the construction. Also, the completed construction or parts thereof required to be provided under the Contract Documents.

WORKING DAYS. When in reference to contract timeline refers to Monday through Friday and excludes weekends and holidays.

1-2 TERMS

Wherever the terms "required," "permitted," "ordered," "designated," "directed," "prescribed," or terms of like import are used, it shall be understood that the requirements, permission, order, designation, prescription, or direction of the Owner's Representative is intended. Similarly, the terms "acceptable," "satisfactory," "or equal," or terms of like import shall mean acceptable to or satisfactory to the Owner's Representative, unless otherwise expressly stated. The word "provide" shall be understood to mean furnish and install. Whenever the context so requires, the singular shall include the plural, and the masculine and neuter genders shall each include the other.

1-3 ABBREVIATIONS

Wherever the following abbreviations are used, they shall have the meanings indicated:

AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute AGA American Gas Association AI The Asphalt Institute AIA American Institute of Architects AIEE American Institute of Electrical Engineers AISC American Institute of Steel Construction AISI American Iron & Steel Institute ANSI American National Standards Institute (formerly USASI, USAS, ASA) API American Petroleum Institute APWA American Public Works Association AREA American Railway Engineering Association ASA American Standards Association (Now ANSI) ASCE American Society of Civil Engineers

GENERAL PROVISIONS 007000-3

ASHRAE American Society of Heating, Refrigerating, and Air-Conditioning Engineers

ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWS American Welding Society AWWA American Water Works Association CRSI Concrete Reinforcing Steel Institute IEEE Institute of Electrical and Electronics Engineers NBFU National Board of Fire Underwriters NEMA National Electrical Manufacturers Association PCA Portland Cement Association State Specifications California Standard Specifications, State of California, Department of

Transportation, Division of Highways SSPC Steel Structures Painting Council UBC Uniform Building Code, Pacific Coast Building Officials Conference of the International Conference of Building Officials U/L or UL Underwriters' Laboratories, Inc.

USASI or USAS United States of American Standards Institute (Now ANSI) USGS United States Geological Survey

GENERAL PROVISIONS 007000-4

ARTICLE 2 PROPOSAL REQUIREMENTS AND CONDITIONS

2-1 CONTRACT DOCUMENTS

The Contract Documents are set forth in the agreement form and the definition of "Contract Documents" in the article on DEFINITIONS, TERMS, AND ABBREVIATIONS.

2-2 LICENSE

No bid will be accepted from a Bidder who is not licensed to conduct business in the state of California and licensed to perform the class of work defined by the Contract Documents.

2-3 PROPOSALS

Bids shall be made upon the bid form furnished by the Owner and a part of the Contract Documents. All bids shall be properly executed and with all items filled in; the signatures of all persons signing shall be in longhand. Erasures, interlineations, or other corrections shall be authenticated by affixing in the margin immediately opposite the correction the initials of a person signing the bid. If the unit price and the total amount named by a Bidder for any item are not in agreement, the unit price alone shall be considered as representing the Bidder's intention, and the totals shall be corrected to conform thereto.

Bids shall not contain any recapitulation of the work to be done. Alternative proposals will not be considered, except as called for. No oral, telegraphic, or telephonic proposals or modifications will be considered.

Bids shall be accompanied by a "Proposal Guarantee" in the form of a cashier's or a certified check, or bidder's bond or substitute security, in an amount not less than 10 percent of the amount of bid, made payable to or for the benefit of the Owner. Said check or bond or substitute shall be given as a guarantee that the Bidder will enter into a Contract and furnish the required bonds or substitutes and insurance certificates and endorsements if awarded the Contract, and in case of refusal or failure to enter into said Contract and furnish the required bonds or substitutes and insurance certificates and endorsements within 15 calendar days after notice of award by the Owner in writing, the check and the money represented by said check shall be forfeited to the Owner, or in the event that a bond or other security is deposited, said security shall be forfeited. Forfeiture does not preclude the Owner from seeking all other remedies provided by law to recover losses sustained as a result of the Contractor's failure to enter into the Contract or to furnish the required bonds or substitutes, or insurance certificates and endorsements, including without limitation, attorneys’ fees and other costs reasonably incurred by the Owner, with or without legal proceedings.

Bids shall be sealed in an envelope marked and addressed as set forth in the Special Provisions. Bids shall be delivered to the addressee at the location designated in the Notice Inviting Sealed Proposals on or before the day and hour set for the opening of bids in the Notice Inviting Sealed Proposals, and shall bear the name of the Bidder. A bid will not be accepted after the date and time designated in the Notice Inviting Sealed Proposals. It is the sole responsibility of the Bidder to see that its bid is delivered and received in proper time. Any bid received after said designated date and time shall be returned to the Bidder unopened.

2-4 WITHDRAWAL OF BID

A Bidder may withdraw its bid by a signed written request any time prior to the date and time for receiving bids designated in the Notice Inviting Sealed Proposals.

The withdrawal of a bid does not prejudice the right of a Bidder to file a new bid so long as the new bid is delivered as set forth in the article on PROPOSALS prior to the closing time specified for all bids.

GENERAL PROVISIONS 007000-5

2-5 BIDDERS INTERESTED IN MORE THAN ONE BID

No person, partnership, or corporation shall be allowed to make or file, or be interested in more than one bid for the work, unless alternative bids are called for. A person, partnership, or corporation submitting a subproposal to a Bidder, or who has quoted prices on material to a Bidder, is not thereby disqualified from submitting a subproposal or quoting prices to other Bidders.

2-6 INTERPRETATION OF PLANS AND OTHER CONTRACT DOCUMENTS

If any person or entity contemplating submitting a bid for the proposed Contract is in doubt as to the true meaning of any part of the plans, specifications, or other contract documents, or finds discrepancies in, or omissions from the plans and specifications or other contract documents, it may submit to the Engineer a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery. An interpretation or correction of the Contract Documents will be made only by Addendum duly issued by the Engineer. A copy of such Addendum will be mailed or delivered to each person or entity that has received a set of such documents. The Owner and the Engineer will not be responsible for any other explanation or interpretation of the documents.

2-7 ADDENDA

Addenda issued before the time in which to submit bids expires shall be included in the bid and shall be made a part of the Contract.

2-8 EXISTING CONDITIONS AND EXAMINATION OF CONTRACT DOCUMENTS

The Bidder represents that it has carefully examined the Contract Documents and the site where the work is to be performed and that it has familiarized itself with all local conditions and federal, state and local laws, ordinances, rules, and regulations that may affect in any manner the performance of the work. The Bidder further represents that it has studied all surveys and investigation reports about subsurface and latent physical conditions pertaining to the jobsite, that it has performed such additional surveys and investigations as it deems necessary to complete the work at its bid price, and that it has correlated the results of all such data with the requirements of the Contract Documents. The submittal of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, including locality, uncertainty of weather and all other contingencies, and as to the character, quality, quantities, and scope of the work.

The plans and specifications for the work show subsurface conditions or otherwise hidden conditions as they are supposed or believed by the Engineer to exist; but it is not intended or to be inferred that the conditions as shown thereon constitute a representation that such conditions are actually existent.

This is the start of the file's text. The full file is on GovTribe.