BEP-RFP-16-0464_0_US.pdf
PDF 127 KB Posted
- Attached to
- BEP DCF Roof Garden Repair Project Federal contract opportunity
- Solicitation number
- BEP-RFP-16-0464
About this file
BEP-RFP-16-0464
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PAST_PERFORMANCE_QUESTIONNAIRE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
BEP-RFP-16-0464
TABLE OF CONTENTS:
Listing of Incorporated Purchase Requisitions Section 00010 - Solicitation Contract Form
Supplies or Services and Prices or Costs:
Packaging and Marking:
Inspection and Acceptance Terms:
Delivery or Performance:
List of documents, exhibits, and other attachments:
Section 00100 - Instructions, Conditions, and Notices to Offerors/Bidders Section 00600 - Representations and Certifications Section 00700 - Contract Clauses Section 00800 - Special Contract Requirements
Contract Administration Data:
Special Contract Requirements:
Listing of Incorporated Purchase Requisitions
Incorporated Purchase Requisition Numbers:
Section 00010 - Solicitation Contract Form
Supplies or Services and Prices or Costs:
Item Number Base Item Number
Supplies/Services Quantity Unit
0001 Repairs to the BEP DCF Roof Garden in accordance with the Statement of
Work (SOW)
1 EA
Contract Type:Firm Fixed Price Unit Price
Extended Price
Description:
Purchase Requisitions
NAICS Code: 238330 Flooring Contractors
Packaging and Marking:
Inspection and Acceptance Terms:
Delivery or Performance:
Line Item: 0001 Period Of Performance Start Date Period Of Performance End
Date Period Of Performance Address
BEP-ECF
14th and C Streets, S.W.
Washington DC 20228-0001
US
List of documents, exhibits, and other attachments:
Section 00100 - Instructions, Conditions, and Notices to Offerors/Bidders
Basis For Award
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR QUOTERS
L-1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(JUNE 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address (es): http://farsite.hill.af.mil.
Source: Federal Acquisition Regulation (48 CFR Chapter 1)
Clause
Number Title & Date
52.204-6 Data Universal Numbering System (DUNS) Number
(JUL 2013)
52.2151 Instructions to Offerors --
Competitive Acquisition. (JAN 2004)
52.232-38 Submission of Electronic Funds Transfer Information with Offer. (JUL 2013)
L-2 52.2161 TYPE OF CONTRACT (APR 1984)
http://farsite.hill.af.mil
The Government contemplates award of a Firm Fixed Price Contract from this solicitation.
L-3 52.233-2 SERVICE OF PROTEST. (SEP 2006)
Service of Protest (Sep 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Bureau of Engraving and Printing
Office of Acquisition
Attn: Richard Taylor
14th and C Streets, S.W., Room 708-A
Washington, DC 20228-0001
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
L-4 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.
A site visit is scheduled for 9 August 2016 at 1:30PM ET. Offerors will need to confirm attendance by contacting the Contract Specialist, C E John Hoddinott, at charles.hoddinott@bep.gov, before 12:00PM ET on 8 August 2016. No more than 2 attendees per contractor may attend. Attendees will meet at the 14th Street entrance of the "Annex Building" (located across 14th Street from the BEP Tour Entrance), and will be checked in by security for visitor badges.
(End of Provision)
L-5 INQUIRIES
The Contractor is instructed to contact only the solicitation Issuing Office shown on page 1 (Block 4 on SF1442) for information about any aspect of the solicitation. All communications prior to award must be directed to the Contract Specialist, C. E. John Hoddinott, charles.hoddinott@bep.gov, or 202-874-0798.
Answers to questions will be provided to the Contractor being solicited, giving due regard to the proper protection of proprietary information.
L-6 INCURRING COSTS
The Contracting Officer is the only person who can legally obligate the Government for the expenditure of public funds.
Costs shall not be incurred by recipients of this solicitation in anticipation of receiving direct reimbursement from the Government. It is understood that your bid/proposal will become part of the official file on this matter without obligation to the Government.
L-7 EXCEPTIONS TO SOLICITATION TERMS AND CONDITIONS
The Contractor must state in their proposals any exceptions taken to the terms and conditions of the solicitation. Omission of such a statement will be construed as the Contractor's acceptance of all solicitation terms and conditions.
mailto:charles.hoddinott@bep.gov
Exceptions shall be stated in a cover letter conveying the proposal. Identify the term or condition, state the reasons for the exception, and provide any other information concerning the exception(s).
L-8 PROPOSAL FORMAT AND SUBMISSION INSTRUCTIONS
(a) Proposals, signed by an official authorized to bind the Contractor, shall set forth full, accurate, and complete information as required by the corresponding contract. The penalty for making false statements is prescribed in 18 USC 1001. Failure to furnish full and complete information requested may cause an offer to be determined unacceptable.
(b) In responding to any request for proposal under a resulting contract, the Contractor must prepare and submit the indicated documents, which constitute the Contractor's complete proposal:
(1) Must have an active System for Award Management (SAM) entity profile, and have current Representations and Certifications.
(2) Price Proposal Electronic Submission;
SECTION M – EVALUATION FACTORS FOR AWARD
Factor 1 – Price
Price proposals shall be submitted in CSI Format. The offeror shall provide a total price on CLIN0001 of the Solicitation. See page 4).
Factor 2 – Past Performance
Past performance will be evaluated as technically acceptable or technically unacceptable. The offeror will be required to submit three (3) past performance questionnaire's (to be completed by other contracting offices/program offices) for requirements completed that are of a similar scope and nature. Past performance working on Dex-O-Tex floor applications is required (IAW) approved manufacturer requirements. To be technically acceptable, the questionnaire's must be fully completed, and provide evidence of successful completion of required tasks (ie, experience with Dex-O-Tex elastomeric floor coatings) as evaluated on the performance rating contained in the questionnaire. Completed questionnaire's should be emailed directly to the Contract Specialist, C. E. John Hoddinott, at charles.hoddinott@bep.gov, and should be received before the closing date for the Solicitation. The template for the questionnaire is provided as Attachment A.
Section 00600 - Representations and Certifications
SOW
BUREAU OF ENGRAVING AND PRINTING
EASTERN CURRENCY FACILITY
WASHINGTON D.C.
STATEMENT OF WORK FOR CONSTRUCTION SERVICES
Repairing the Garden Terrace Roofing System of the
Main Building
June 2016
1.0 BACKGROUND
The Bureau of Engraving and Printing (BEP) Garden Terrace is located in B-wing of the Main Building at 14th and D Streets S.W. Washington DC. The existing Dex-O-Tex roofing system was installed on the Garden Terrace in 1998. The Dex-O-Tex roofing system located in high traffic areas is deteriorating.
Therefore, the equipment and products on the 3rd floor of B- wing (located under the Garden Terrace) are experiencing rain water damage. It is therefore imperative that the Garden Terrace roof be repaired as soon as possible to prevent additional water damage.
2.0 SCOPE
Furnish all labor, materials, equipment, tools, supplies, supervision and general construction needed to remove and replace the damaged Dex-O-Tex roofing system on the Garden Terrace. The materials and equipment will remain on the 3rd floor of B-wing during construction. The contractor will be responsible for making sure that the Garden Terrace roof is watertight during and after construction. The Garden Terrace roof repairs will include the following:
• Cut out four (4') feet from both parapet walls to include the troughs approx. 1200 ft2. Cut out two areas on the 14th street side of the deck both approx. 1250 ft2 for a total of 2500 ft2.
• All areas will be repaired per Dex-O-Tex Application Specification S-614 Weatherwear Repairing, Resurfacing & Resealing.
• Repair approx. 500 L.F. of cracks throughout the Garden Terrace's deck.
3.0 APPLICABLE DOCUMENTS
N/A
4.0 TECHNICAL REQUIREMENTS
4.1 The Contractor is required to complete the repairs on the Garden Terrace (including all punch list items) within 45 calendar days after Notice To Proceed (NTP).
4.2 All work shall be performed and completed in accordance with the manufacturer (Dex-O-Tex) specifications.
4.3The following are additional requirements, clarifications, or changes to the bid documents:
4.3.1 The contractor will be allowed to place only one dumpster on the site located near BM-5 and the contractor will use this dumpster to remove all non-hazardous demolition debris (including roofing materials, concrete, etc.) from the job site.
4.3.2 A pre-construction meeting shall be held within 10
calendar days after award of Contract.
4.3.3 The contractor shall submit a "Safety and Fire Prevention Plan within 10 calendar days of award of Contract. After approval of the plan, a construction permit will be issued by the Bureau for construction.
4.3.4 Warranty
Special Project Warranty: Submit two executable copies of a Roofing Warranty, stating that the roofing installer shall warrant its materials and workmanship associated with the repaired sections of the roofing system, against defect due to faulty materials or workmanship for a period of one year. The roofing warranty shall be signed and countersigned by Installer (Roofer) and Contractor. Upon notification of such defective work, within the warranty period make the necessary repairs and replacements at the convenience of the BEP representative. Repairs and replacements shall include all necessary removal and replacement of finish materials, without cost to BEP.
Manufacturers Inspection: The Contractor shall be responsible for carrying out all recommendations of the manufacturer to ensure a total and complete installation of the roofing work. The issuance of the manufacturer's final inspection report shall be made prior to the acceptance of the work by the COR.
5.0 SECURITY
The work is being performed in a secure building. Badges must be worn by Contractors when on the premises at all times. Time will be allotted for badging of a site superintendent/on-site project manager.
6.0 PLACE OF PERFORMANCE
The place of performance for this project is the BEP Washington DC Facility (DCF) located at 14th and C Streets, S.W. Washington, D.C. 20228.
7.0 PERIOD OF PERFORMANCE
The Contractor is required to complete this contract (including all punch list items) within 45 days after issuance of Notice to Proceed and after issuance of any security badges required for the project.
8.0 MISCELLANEOUS
8.1 The Contracting Officer's Representative (COR) for this project is Mr. James Colvin at 202-874-3466.
8.2 Please refer to DTAR 1052.232-7003, Electronic Submission of Payment Requests (APR 2015) for payment instructions.
-- END STATEMENT OF WORK--
WAGE Determination
General Decision Number: DC160002 07/08/2016 DC2
Superseded General Decision Number: DC20150002
State: District of Columbia
Construction Type: Building
County: District of Columbia Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least
$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/08/2016
1 01/15/2016
2 02/19/2016
3 05/20/2016
4 06/03/2016
5 06/10/2016
6 06/17/2016
7 07/01/2016
8 07/08/2016
ASBE0024-007 10/01/2015
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 34.33 13.92
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-008 10/01/2015
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER.................$ 21.61 5.54
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems
ASBE0024-014 10/01/2015
Rates Fringes
FIRESTOPPER......................$ 26.81 5.98
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
BRDC0001-002 05/03/2015
Rates Fringes
BRICKLAYER.......................$ 30.36 9.69
CARP0177-003 01/01/2016
Rates Fringes
CARPENTER, Includes Drywall
Hanging, Form Work, and Soft
Floor Laying-Carpet..............$ 27.56 9.18
CARP0179-001 05/01/2016
Rates Fringes
PILEDRIVERMAN....................$ 29.19 9.45
CARP1548-001 04/01/2015
Rates Fringes
MILLWRIGHT.......................$ 31.99 9.28
ELEC0026-016 06/06/2016
Rates Fringes
ELECTRICIAN, Includes
Installation of
HVAC/Temperature Controls........$ 43.70 16.06
ELEC0026-017 09/01/2014
Rates Fringes
ELECTRICAL INSTALLER (Sound
& Communication Systems).........$ 27.05 8.58
SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside
Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEV0010-001 01/01/2016
Rates Fringes
ELEVATOR MECHANIC................$ 41.90 29.985+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
IRON0005-005 06/01/2016
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 30.85 19.435
IRON0201-006 05/01/2016
Rates Fringes
IRONWORKER, REINFORCING..........$ 27.90 19.13
LABO0657-015 06/01/2015
Rates Fringes
LABORER: Skilled................$ 22.63 7.31
FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.
MARB0002-004 05/01/2016
Rates Fringes
MARBLE/STONE MASON...............$ 35.91 16.17
INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement
(restoration work)
MARB0003-006 05/01/2016
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 27.25 10.68
MARB0003-007 05/01/2016
Rates Fringes
TERRAZZO FINISHER................$ 22.46 9.75
MARB0003-008 05/01/2016
Rates Fringes
TILE SETTER......................$ 27.25 10.68
MARB0003-009 05/01/2016
Rates Fringes
TILE FINISHER....................$ 22.46 9.75
PAIN0051-014 06/01/2014
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 24.77 9.85
Glazing Contracts over $2 million.....................$ 28.61 9.85
PAIN0051-015 06/01/2014
Rates Fringes
PAINTER
Brush, Roller, Spray and
Drywall Finisher............$ 24.89 9.05
PLAS0891-005 07/01/2013
Rates Fringes
PLASTERER........................$ 28.33 5.85
PLAS0891-006 02/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.15 9.61
PLAS0891-007 08/01/2015
Rates Fringes
FIREPROOFER
Handler.....................$ 16.50 4.59
Mixer/Pump..................$ 18.50 4.59
Sprayer.....................$ 23.00 4.59
Spraying of all Fireproofing materials. Hand application of
Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.
PLUM0005-010 08/01/2015
Rates Fringes
PLUMBER..........................$ 39.67 16.60+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's
Day, Martin Luther King's Birthday, Memorial Day and the
Fourth of July.
PLUM0602-008 08/01/2015
Rates Fringes
PIPEFITTER, Includes HVAC
Pipe Installation................$ 38.89 19.97+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-016 05/01/2016
ROOFER...........................$ 28.75 11.74
SFDC0669-002 04/01/2016
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 33.40 18.52
* SHEE0100-015 07/01/2016
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 40.27 17.24+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
SUDC2009-003 05/19/2009
LABORER: Common or General......$ 13.04 2.80
LABORER: Mason Tender -
Cement/Concrete..................$ 15.40 2.85
LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures
(restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
UAVG denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section 00700 - Contract Clauses
Clauses incorporated by reference Article Number Reference Text 52.203-5 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-7 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-17 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of
Whistleblower Rights (APR 2014) 52.222-50 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.223-18 52.223-18 Encouraging Contractor Policy to Ban Text Messaging While Driving (AUG 2011) 52.225-13 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.232-5 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-27 52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.233-3 52.233-3 Protest after Award (AUG 1996) 52.233-4 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-5 52.236-5 Material and Workmanship (APR 1984) 52.236-7 52.236-7 Permits and Responsibilities (NOV 1991) 52.244-6 52.244-6 Subcontracts for Commercial Items (FEB 2016) 52.232-39 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.202-1 52.202-1 Definitions (NOV 2013) 52.203-3 52.203-3 Gratuities (APR 1984) 52.203-8 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.204-4 52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011) 52.209-6 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) 52.211-13 52.211-13 Time Extensions (SEPT 2000) 52.215-2 52.215-2 Audit and Records-Negotiation (OCT 2010) 52.219-6 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-14 52.219-14 Limitations on Subcontracting (NOV 2011) 52.222-3 52.222-3 Convict Labor (June 2003) 52.222-4 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation (MAY 2014) 52.222-6 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-13 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY
2014) 52.222-14 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-21 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 52.222-26 Equal Opportunity (APR 2015) 52.222-27 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-37 52.222-37 Employment Reports on Veterans(FEB 2016) 52.223-5 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-12 52.223-12 Refrigeration Equipment and Air Conditioners (MAY 1995) 52.223-15 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.228-5 52.228-5 Insurance-Work on a Government Installation (JAN 1997) 52.229-4 52.229-4 Federal, State, and Local Taxes (State and Local Adjustments) (FEB 2013) 52.233-1 52.233-1 Disputes (MAY 2014) 52.236-2 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-6 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-8 52.236-8 Other Contracts (APR 1984) 52.236-9 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.(APR
1984)
52.236-10 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 52.236-12 Cleaning Up (APR 1984) 52.236-13 52.236-13 Accident Prevention (NOV 1991) 52.236-14 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-21 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 52.236-26 Preconstruction Conference (FEB 1995) 52.242-14 52.242-14 Suspension of Work (APR 1984) 52.243-4 52.243-4 Changes (JUNE 2007) 52.249-10 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.219-8 52.219-8 Utilization of Small Business Concerns (OCT 2014) 52.222-15 52.222-15 Certification of Eligibility (MAY 2014) 52.228-15 52.228-15 Performance and Payment Bonds-Construction (OCT 2010) 52.236-28 52.236-28 Preparation of Proposals-Construction (OCT 1997)
Clauses incorporated by full text
52.211-10 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days after issuance of NTP.* The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.222-35 52.222-35 Equal Opportunity for Veterans (JUL 2014)
(a) Definitions. As used in this clause-
"Active duty wartime or campaign badge veteran," "Armed Forces service medal veteran," "disabled veteran," "protected veteran," "qualified disabled veteran," and "recently separated veteran" have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.222-36 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.223-11 52.223-11 Ozone-Depleting Substances (May 2001)
(a) Definition. "Ozone-depleting substance," as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as-
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
(2) Class II, including, but not limited to, hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
Warning
Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
52.252-1 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil.vffar.htm
(End of provision)
52.252-2 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil.vffar.htm
52.225-9 52.225-9 Buy American-Construction Materials (MAY 2014)
(a) Definitions. As used in this clause-
"Commercially available off-the-shelf (COTS) item"-
(1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means-
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means-
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if-
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description
Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material
Domestic construction material
Item 2: _______ _______ _______
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
1052.201-70 DTAR 1052.201-70 Contracting Officer's Representative (COR) Appointment and
Authority (APR 2015)
(a) The COR is James Colvin, Office of Facilities Support, 301 14th St SW, Washington, DC 20228.
(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or a representative designated in writing. The term "technical direction" includes, without limitation, direction to the contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the work statement are accomplished satisfactorily.
(c) Technical direction must be within the scope of the contract specification(s)/work statement. The COR does not have authority to issue technical direction that:
(1) Constitutes a change of assignment or additional work outside the contract specification(s)/work statement;
(2) Constitutes a change as defined in the clause entitled "Changes";
(3) In any manner causes an increase or decrease in the contract price, or the time required for contract performance;
(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;
(5) Interferes with the contractor's right to perform under the terms and conditions of the contract; or
(6) Directs, supervises or otherwise controls the actions of the Contractor's employees.
(d) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.
(e) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR. If, in the opinion of the Contractor, any direction of the COR or the designated representative falls within the limitations of (c) above, the Contractor shall immediately notify the Contracting Officer no later than the beginning of the next Government work day.
(End of clause)
1052.232-7003 DTAR 1052.232-7003 Electronic Submission of Payment Requests (APR 2015)
(a) Definitions. As used in this clause—
(1) "Payment request" means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), "Content of Invoices" and the applicable Payment clause included in this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.
(c) The Contractor may submit payment requests using other than IPP only when the Contracting Officer authorizes alternate procedures in writing in accordance with Treasury procedures.
(d) If alternate payment procedures are authorized, the Contractor shall include a copy of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .