Baltimore Fire Penetration Deficiencies.pdf

PDF 4 MB Posted

Attached to
J012--CEILING AND FIRE WAL PENETRATIONS REPAIRS Federal contract opportunity
Solicitation number
36C24520Q0652
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5

View the file

Other files for this federal contract opportunity

Other files attached to J012--CEILING AND FIRE WAL PENETRATIONS REPAIRS, newest first.
File Type Posted
36C24520Q0652.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Baltimore VA Medical Center 2020 Fire Penetration Deficiencies www.DeCostaConstruction.com

Deficiency Number Floor / Location Deficiency Notes / Recommendations

A

1ST / 1B-125

HEAD OF WALL / NON

COMPLIANT MATERIAL

SEAL HEAD OF WALL / REMOVE NON

COMPLIANT MATERIAL / SEAL

B

1ST / DOUBLE DOORS TO

MRI

WALL REPAIR

COMPLETE SEAL

C

1ST / DOUBLE DOORS 1B-

HEAD OF WALL / REMOVE NON COMPLIANT

MATERIAL / SEAL

D

1ST / DOUBLE DOORS

HEAD OF WALL / MULTIPLE

PENETRATION / NON

COMPLIANT MATEIRAL

SEAL HEAD OF WALL / SEAL PENETRATION /

REMOVE NON COMPLAINT MATERIAL / SEAL

E

6TH / 6C-164

HEAD OF WALL

SEAL HEAD OF WALL

F

2ND / INSIDE SERVICE

BAY / ELECTRICAL ROOM

PENETRATION

SEAL HEAD OF WALL / SEAL PENETRATION

G

6TH / STAIRWELL

MULTIPLE PENETRATION

SEAL PENETRATION

H

1ST / SOILED UTILITY

PENETRATION / NON

COMPLIANT MATEIRAL

REMOVE NON COMPLAINT MATERIAL / SEAL

I

4TH / 4B-219

J

4TH / CORRIDOR

SEAL HEAD OF WALL / REMOVE NON

K

All SERVICE BAYS IN ALL

FLOORS & QUADS

PENETRATION AROUND

FLOOR DUCTWORK

FPENETRATIONS / NON

SEAL HEAD OF WALL / SEAL FLOOR

DUCTWORK PENETRATIONS / REMOVE

NON COMPLIANT MATERIAL / SEAL

L

7TH / OFFICES

WALL BUILD

M

6TH / 6C-118

N

6TH / CORRIDOR

O

6TH / OUTPATIENT

ADDITONAL DOORWAY

P

6TH / STAIRWELL

CORRIDOR

MULTIPLE PENETRATION /

CABLES ON SPRINKLER PIPE /

NON COMPLIANT MATERIAL

SEAL PENETRATION / REMOVE / MOVE

CABLES FOR COMPLIANCE / REMOVE NON

Q

6TH / SERVICE BAY

R

HEAD OF WALL / I-BEAM

SEAL HEAD OF WALL / REPAIR USING SFRM

MATERIAL

S

HEAD OF WALL / FLOOR TO

WALL

SEAL HEAD OF WALL / SEAL FLOOR TO WALL

T

6TH / 1B-129

U

6TH / 6D-158 CORRIDOR

V

6TH / 6D-158 CORRIDOR

SEAL HEAD OF WALL

W

HEAD OF WALL / DUCT

SEAL HEAD OF WALL / SEAL DUCT

X

6TH / INSIDE SERVICE BAY

PENETRATION / WALL REPAIR

Y

2ND / SERVICE BAY

PENETRATION / NON

COMPLIANT MATERIAL / I-

BEAM / OPEN JUNCTION BOX

SEAL HEAD OF WALL / SEAL PENETRATION /

REMOVE NON COMPLIANT MATERIAL / SEAL

/ REPAIR USING SFRM MATERIAL / INSTALL

COVER PLATE

Z

BASEMENT / INSIDE

KITCHEN

MULTIPLE DUCTS

SEAL PENETRATION / SEAL DUCT

5TH FLOOR DUCTS

5TH FLOOR 5D-130

LARGE DUCT WORK

PENETRATIONS THROUGH

FLOOR UNSEALED

INSTALL ENGINEERING JUDGEMENT AT AND

AROUND DUCTWORK TO SEAL FIRE RATED

FLOOR SLAB

4TH FLOOR DUCTS

4TH FLOOR 4D-154

3RD FLOOR DUCTS

3RD FLOOR 3D-119

2ND FLOOR DUCTS

2ND FLOOR 2D-126

BALTIMORE VETERAN'S AFFAIRS MEDICAL CENTER

Deficiency Report - Recommendation List

Identifier #

A

Building:

MAIN

Floor:

1ST

Room or Area:

1B-125

Date:

2/28/2020

Const Type :

DRYWALL

Hourly Rating :

1 HOUR FIRE BARRIER

Found Item(s)

NOTES: SEAL HEAD OF WALL / REMOVE NON COMPLIANT MATERIAL / SEAL

NON RATED

WALL REPAIR

B

DOUBLE DOORS TO MRI

NOTES: COMPLETE SEAL

2 HOUR FIRE BARRIER

C

DOUBLE DOORS 1B-131

NOTES: SEAL HEAD OF WALL / REMOVE NON COMPLIANT MATERIAL / SEAL

1 HOUR FIRE SMOKE BARRIER

PENETRATION / NON COMPLIANT

D

DOUBLE DOORS

NOTES: SEAL HEAD OF WALL / SEAL PENETRATION / REMOVE NON COMPLIANT MATERIAL /

SEAL

410-628-0627 www.DeCostaConstruction.com

E

6TH

6C-164

NOTES: SEAL HEAD OF WALL

F

2ND

INSIDE SERVICE BAY /

ELECTRICAL ROOM

NOTES: SEAL HEAD OF WALL / SEAL PENETRATION

G

STAIRWELL

NOTES: SEAL PENETRATION

H

SOILED UTILITY

I

4TH

4B-219

NOTES:

J

NOTES: SEAL HEAD OF WALL / REMOVE NON COMPLIANT MATERIAL

3/3/2020

K

SERVICE BAY

1 HOUR FIRE SMOKE BARRIER

L

7TH

OFFICES

SMOKE BARRIER

M

6C-118

N

SMOKE BARRIER

O

OUTPATIENT ADDITIONAL

DOORWAY

CABLES ON SPRINKLER PIPE /

NON COMPLIANT MATERIAL

P

STAIRWELL CORRIDOR

NOTES: SEAL PENETRATION / REMOVE / MOVE CABLES FOR COMPLIANCE / REMOVE NON

CMU

1 HOUR FIRE PENETRATION

Q

HEAD OF WALL / I-BEAM

R

NOTES: SEAL HEAD OF WALL / REPAIR USING SFRM MATERIAL

HEAD OF WALL / FLOOR TO WALL

S

NOTES: SEAL HEAD OF WALL / SEAL FLOOR TO WALL

T

1B-129

U

6D-158 CORRIDOR

NOTES: SEAL HEAD OF WALL / SEAL PENETRATION

V

6D-158 CORRIDOR

NOTES: SEAL HEAD OF WALL

HEAD OF WALL / DUCT

W

NOTES: SEAL HEAD OF WALL / SEAL DUCT

PENETRATION / WALL REPAIR

X

INSIDE SERVICE BAY

NOTES: SEAL HEAD OF WALL / SEAL PENETRATION / COMPLETE SEAL

PENETRATION / NON

COMPLIANT MATERIAL / I-BEAM /

OPEN JUNCTION BOX

Y

2ND

NOTES: SEAL HEAD OF WALL / SEAL PENETRATION / REPAIR USING SFRM MATERIAL /

INSTALL COVER PLATE

ADeficiency Report - Recommendation List

MULTIPLE DUCTS

Z

BASEMENT

INSIDE KITCHEN

NOTES: SEAL PENETRATION / SEAL DUCT