Text version
Baltimore VA Medical Center 2020 Fire Penetration Deficiencies www.DeCostaConstruction.com
Deficiency Number Floor / Location Deficiency Notes / Recommendations
A
1ST / 1B-125
HEAD OF WALL / NON
COMPLIANT MATERIAL
SEAL HEAD OF WALL / REMOVE NON
COMPLIANT MATERIAL / SEAL
B
1ST / DOUBLE DOORS TO
MRI
WALL REPAIR
COMPLETE SEAL
C
1ST / DOUBLE DOORS 1B-
HEAD OF WALL / REMOVE NON COMPLIANT
MATERIAL / SEAL
D
1ST / DOUBLE DOORS
HEAD OF WALL / MULTIPLE
PENETRATION / NON
COMPLIANT MATEIRAL
SEAL HEAD OF WALL / SEAL PENETRATION /
REMOVE NON COMPLAINT MATERIAL / SEAL
E
6TH / 6C-164
HEAD OF WALL
SEAL HEAD OF WALL
F
2ND / INSIDE SERVICE
BAY / ELECTRICAL ROOM
PENETRATION
SEAL HEAD OF WALL / SEAL PENETRATION
G
6TH / STAIRWELL
MULTIPLE PENETRATION
SEAL PENETRATION
H
1ST / SOILED UTILITY
PENETRATION / NON
COMPLIANT MATEIRAL
REMOVE NON COMPLAINT MATERIAL / SEAL
I
4TH / 4B-219
J
4TH / CORRIDOR
SEAL HEAD OF WALL / REMOVE NON
K
All SERVICE BAYS IN ALL
FLOORS & QUADS
PENETRATION AROUND
FLOOR DUCTWORK
FPENETRATIONS / NON
SEAL HEAD OF WALL / SEAL FLOOR
DUCTWORK PENETRATIONS / REMOVE
NON COMPLIANT MATERIAL / SEAL
L
7TH / OFFICES
WALL BUILD
M
6TH / 6C-118
N
6TH / CORRIDOR
O
6TH / OUTPATIENT
ADDITONAL DOORWAY
P
6TH / STAIRWELL
CORRIDOR
MULTIPLE PENETRATION /
CABLES ON SPRINKLER PIPE /
NON COMPLIANT MATERIAL
SEAL PENETRATION / REMOVE / MOVE
CABLES FOR COMPLIANCE / REMOVE NON
Q
6TH / SERVICE BAY
R
HEAD OF WALL / I-BEAM
SEAL HEAD OF WALL / REPAIR USING SFRM
MATERIAL
S
HEAD OF WALL / FLOOR TO
WALL
SEAL HEAD OF WALL / SEAL FLOOR TO WALL
T
6TH / 1B-129
U
6TH / 6D-158 CORRIDOR
V
6TH / 6D-158 CORRIDOR
SEAL HEAD OF WALL
W
HEAD OF WALL / DUCT
SEAL HEAD OF WALL / SEAL DUCT
X
6TH / INSIDE SERVICE BAY
PENETRATION / WALL REPAIR
Y
2ND / SERVICE BAY
PENETRATION / NON
COMPLIANT MATERIAL / I-
BEAM / OPEN JUNCTION BOX
SEAL HEAD OF WALL / SEAL PENETRATION /
REMOVE NON COMPLIANT MATERIAL / SEAL
/ REPAIR USING SFRM MATERIAL / INSTALL
COVER PLATE
Z
BASEMENT / INSIDE
KITCHEN
MULTIPLE DUCTS
SEAL PENETRATION / SEAL DUCT
5TH FLOOR DUCTS
5TH FLOOR 5D-130
LARGE DUCT WORK
PENETRATIONS THROUGH
FLOOR UNSEALED
INSTALL ENGINEERING JUDGEMENT AT AND
AROUND DUCTWORK TO SEAL FIRE RATED
FLOOR SLAB
4TH FLOOR DUCTS
4TH FLOOR 4D-154
3RD FLOOR DUCTS
3RD FLOOR 3D-119
2ND FLOOR DUCTS
2ND FLOOR 2D-126
BALTIMORE VETERAN'S AFFAIRS MEDICAL CENTER
Deficiency Report - Recommendation List
Identifier #
A
Building:
MAIN
Floor:
1ST
Room or Area:
1B-125
Date:
2/28/2020
Const Type :
DRYWALL
Hourly Rating :
1 HOUR FIRE BARRIER
Found Item(s)
NOTES: SEAL HEAD OF WALL / REMOVE NON COMPLIANT MATERIAL / SEAL
NON RATED
WALL REPAIR
B
DOUBLE DOORS TO MRI
NOTES: COMPLETE SEAL
2 HOUR FIRE BARRIER
C
DOUBLE DOORS 1B-131
NOTES: SEAL HEAD OF WALL / REMOVE NON COMPLIANT MATERIAL / SEAL
1 HOUR FIRE SMOKE BARRIER
PENETRATION / NON COMPLIANT
D
DOUBLE DOORS
NOTES: SEAL HEAD OF WALL / SEAL PENETRATION / REMOVE NON COMPLIANT MATERIAL /
SEAL
410-628-0627 www.DeCostaConstruction.com
E
6TH
6C-164
NOTES: SEAL HEAD OF WALL
F
2ND
INSIDE SERVICE BAY /
ELECTRICAL ROOM
NOTES: SEAL HEAD OF WALL / SEAL PENETRATION
G
STAIRWELL
NOTES: SEAL PENETRATION
H
SOILED UTILITY
I
4TH
4B-219
NOTES:
J
NOTES: SEAL HEAD OF WALL / REMOVE NON COMPLIANT MATERIAL
3/3/2020
K
SERVICE BAY
1 HOUR FIRE SMOKE BARRIER
L
7TH
OFFICES
SMOKE BARRIER
M
6C-118
N
SMOKE BARRIER
O
OUTPATIENT ADDITIONAL
DOORWAY
CABLES ON SPRINKLER PIPE /
NON COMPLIANT MATERIAL
P
STAIRWELL CORRIDOR
NOTES: SEAL PENETRATION / REMOVE / MOVE CABLES FOR COMPLIANCE / REMOVE NON
CMU
1 HOUR FIRE PENETRATION
Q
HEAD OF WALL / I-BEAM
R
NOTES: SEAL HEAD OF WALL / REPAIR USING SFRM MATERIAL
HEAD OF WALL / FLOOR TO WALL
S
NOTES: SEAL HEAD OF WALL / SEAL FLOOR TO WALL
T
1B-129
U
6D-158 CORRIDOR
NOTES: SEAL HEAD OF WALL / SEAL PENETRATION
V
6D-158 CORRIDOR
NOTES: SEAL HEAD OF WALL
HEAD OF WALL / DUCT
W
NOTES: SEAL HEAD OF WALL / SEAL DUCT
PENETRATION / WALL REPAIR
X
INSIDE SERVICE BAY
NOTES: SEAL HEAD OF WALL / SEAL PENETRATION / COMPLETE SEAL
PENETRATION / NON
COMPLIANT MATERIAL / I-BEAM /
OPEN JUNCTION BOX
Y
2ND
NOTES: SEAL HEAD OF WALL / SEAL PENETRATION / REPAIR USING SFRM MATERIAL /
INSTALL COVER PLATE
ADeficiency Report - Recommendation List
MULTIPLE DUCTS
Z
BASEMENT
INSIDE KITCHEN
NOTES: SEAL PENETRATION / SEAL DUCT
File details come from the government source that posted it. Updated .