Rapid_Eye_Cost_Tables.doc

DOC document 156 KB Posted

Attached to
RAPID EYE (Rapid Response, Long Endurance Unmanned Aircraft System Program) Federal contract opportunity
Solicitation number
BAA07-57
Issued by
Defense Advanced Research Projects Agency

About this file

Addendum A - Cost Proposal Format

View the file

Other files for this federal contract opportunity

Other files attached to RAPID EYE (Rapid Response, Long Endurance Unmanned Aircraft System Program), newest first.
File Type Posted
BAA07-57.pdf PDF
RapidEyeBAAfinal(2).doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A

Cost Proposal Format To streamline the Cost Proposal evaluation process, the Government has developed a simple format for providing cost proposal data. The offeror shall provide this data in hard copies and also electronic copies using MS EXCEL as per the instructions in Section IV-B.2 of the BAA. The lead page of the Cost Proposal (Volume II) shall have a Cost Summary Sheet, including all the information shown in as Table 1 as applicable. It shall be a one-page summary of program costs in tabular format. Costs for the Prime offeror/team lead, team members, funding to federal laboratories and agencies, and cost of major facility utilization (such as wind tunnels) shall all be addressed as applicable. The Cost Summary Sheet shall only contain summary data; the lower-level detail can be addressed as part of the other recommended breakouts discussed in these instructions.

Table 1. Cost Summary Sheet

Phase I

PoP: Start xx/xx/xx to End xx/xx/xx

Prime Contractor Labor

Labor Hours

Total Labor $ *

Prime Contractor Direct Materials

Direct Material $ *

Major Subcontractors / Team Members

Team Member A

Labor Hrs

Total Labor $ *

Direct Material $ *

Other Direct Costs (ODC) *

Total Team Member A $

(Repeat above for Other Team Members)

Other Direct Costs (ODC)

Travel $

Lab/Test Facilities Usage $ (if not GFE/GFI)

Purchased Services / Consultants

Other $

Government Furnished Equipment / Information (GFE/GFI)

Item 1: …Description of & Date Needed

Item 2: …Description & Date Needed

(Repeat for additional GFE/GFI Items)

Total Proposed Costs

* Fully Loaded (All Direct, Indirect and Fees included)

General Instructions

All information provided in the Cost Proposal shall employ the same work breakdown structure (WBS) as used in the offeror’s Statement of Work and Integrated Master Schedule in the Technical Proposal. The cost proposal shall include a complete summary of all costs by WBS by month as highlighted in Table 2. If a teaming arrangement is proposed, the desired cost information shall be provided for all team members. In order for the government to assess program risk and determine the reasonableness, realism, and completeness of the cost proposal, the data regarding labor, direct materials, major subcontracts / team members, other direct costs (ODC), and government furnished equipment or information (GFE/GFI) must be provided for each team member and in a cumulative summary. Each item and category must be broken out. The costs shown in the various breakouts and discussed in the following sections should equal those summarized in Table 1.

Table 2. Phase I Monthly Summary

Month 1
Month 2
…….
Month N
Total $

WBS x.

WBS x.x

WBS x.x.x

WBS x.x.x.x

Total $

Cumulative $

Labor

Total labor includes direct labor and all indirect expenses associated with labor for Phase I. Labor hours and costs shall be allocated to each WBS element contained in the SOW and segmented by team member. This will permit DARPA to see the extent of month-by- month participation by each team member against the various tasks. Table 3 provides an example of this breakout. Table 4 shows a breakdown of labor hours and rates for each category of personnel to be used on this project.

Table 3. Labor Summary

Prime Contractor
Team Member A
Team Member B
…….
Total

WBS x.

WBS x.x

WBS x.x.x

WBS x.x.x .x

Total

The solicitation document requires that offerors provide Basis of Estimates (BOE) for labor and material to support their cost estimates.

The labor hour BOE should be provided for detailed WBS line items and the labor hours summarized in a supplemental table listing the WBS number and title and the estimated hours for each item. If the total hours are less than the total labor hours shown in Table 3, the difference should be identified and explained.

The material cost estimates for each relevant WBS line items should be similarly listed to support their entry in Table 5 below.

Table 4. Labor Rate Summary

FY08
FY09
FY10
FY11
FY12
Hrs / Rate
Hrs / Rate
Hrs / Rate
Hrs / Rate
Hrs / Rate

Prime Contractor

Labor Category 1

Labor Category 2

Labor Category 3*

Team Member A**

Labor Category 1

Labor Category 2

Labor Category 3*

* Repeat for other Labor Categories as needed

** Repeat for other Subcontractors/Team Members as needed

Direct Materials

Total direct material includes that which will be acquired and/or consumed in the Phase I period of performance. List only major items of material (>$50,000). As Table 5 illustrates, material costs shall be assigned to specific work outline elements as described in the SOW. Since only items costing more than $50,000 are to be listed in this Table, there may be a discrepancy between the total material costs shown in Table 1 and the total costs shown in Table 5. The difference should be identified.

Table 5. Material Summary

Description
Prime Contractor
Team Member A
Team Member B
…….
Total

WBS x.

WBS x.x

WBS x.x.x

WBS x.x.x.x ……

Total

Subcontracts

List efforts to be subcontracted, the source, estimated cost and the basis for this estimate. The offeror should break out costs for any subcontractors named as team members in the technical proposal. Table 6 provides an example of a cost breakout. As with the Prime Contractor, break out the subcontract costs by labor (amount and hours), material, and other direct charges by WBS.

It is recognized that offerors may differ in their definitions of material and subcontract costs. This difference may manifest itself in an offeror’s proposal when the prime and its’ team members have such differences with one calling an item a material cost and another calling a similar item a subcontract. To prevent confusion, Offerors should be careful to avoid double counting when summarizing costs in Table 1 and should provide an explanatory note if necessary.

Table 6. Major Subcontractor Summary *

Labor Hours
Labor $
Material $
ODC $
……
Total $

WBS x.

WBS x.x

WBS x.x.x

WBS x.x.x.x ……

Total

* Provide a Separate Table for each Major Subcontractor / Team Member in Phase I.

Other Direct Costs (ODCs)

This section contains any direct costs not included above. As shown in Table 7, ODCs shall be broken out by categories, such as travel, facility costs, purchases services, and consultants. Major facility requirements such as wind tunnel testing or flight research vehicles, government or commercial shall all be included, as should estimates of total facility occupancy and test time. Offerors are expected to include the costs of using any government testing facilities in their cost proposals, but they can use government rates instead of industry rates. At its discretion, DARPA may choose to directly procure services from government test facilities.

Table 7. ODC Summary

Description
Travel $
Purchased Services $
Facilities Usage $
Other $
……
Total $

WBS x.

WBS x.x

WBS x.x.x

WBS x.x.x.x ……

Total

Government Furnished Equipment or Information

As Table 8 highlights, the Offeror shall explicitly list all proposed GFE and GFI and the proposed required delivery schedule for both. This information should be in sufficient detail for the government to assess the realism and costs of providing such information or equipment.

Table 8. GFE/GFI Summary

GFE Description
Source
Date Needed
Total $

WBS x.

WBS x.x

WBS x.x.x

WBS x.x.x.x ……

Total

PAGE