This document is Addendum #1 for the FY 23-24 ADA Improvements project issued by the Finance Department of the City of DeLand, Florida, with the bid number B-25-02. The addendum, dated November 7, 2024, provides clarification to prospective contractors regarding the bid package, with the proposal opening date and time remaining November 19, 2024, at 3:00 P.M. The addendum addresses three key questions from potential bidders: confirming no engineering estimate exists, no pre-construction video is required, and that the retention pond on Thomas can be used for small storage.
The addendum includes three attachments: the FY 23-24 ADA Improvements Plans, Contract Documents (with instructions to fill out pages 1-12 and noting pages 13-24 are draft contract documents), and a Pre-bid Sign-In Sheet. All other terms and conditions of the original bid package remain unchanged. The document is signed by Corey McMillen, CPPB, Purchasing Manager, and provides contractors with updated information to assist in preparing their bid submissions for the ADA improvements project.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| B2502Tabulation.pdf | ||
| B2502ADD1_Attachment_1.pdf | ||
| B2502ADD1_Attachment_2.pdf | ||
| B2502ADD1_Attachment_3.pdf | ||
| B2502PriceSheet.xlsx | XLSX spreadsheet | |
| B2502Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Finance Department 120 S. Florida Ave.
2nd Floor
DeLand, FL 32720
FY 23-24 ADA Improvements B-25-02
November 7, 2024 Addendum #1
TO ALL PROSPECTIVE CONTRACTORS
This is an Addendum to and shall be considered as part of the original Bid package for the above-mentioned Bid. Contractors are requested to acknowledge receipt of this Addendum with their
Submission.
CLARIFICATION TO QUESTIONS ASKED RECEIVED:
1. Q: Is there an Engineering Estimate?
A: No
2. Q: Is a pre-construction video required?
A: No
3. Q: Can the retention pond on Thomas be used for small storage?
A: Yes
Attachment #1: FY 23-24 ADA Improvements Plans
Attachment #2: Contract Documents – Fill out the required areas on pages 1-12, pages 13-24 are draft contract documents.
Attachment #3: Pre-bid Sign-In Sheet
Please note that the proposal opening date and time remains November 19, 2024 @ 3:00 P.M.
All other terms and conditions remain unchanged.
Sincerely, Corey McMillen, CPPB Purchasing Manager
END OF ADDENDUM #1
| FY 23-24 ADA Improvements |
| B-25-02 |
| November 7, 2024 |
| Addendum #1 |
| TO ALL PROSPECTIVE CONTRACTORS |
| CLARIFICATION TO QUESTIONS ASKED RECEIVED: |