B08_Technical_Specifications.pdf
PDF 151 KB Posted
- Attached to
- FUEL DOCK SPILL CONTAINMENT BOOM SYSTEM Federal contract opportunity
- Solicitation number
- 140P9723Q0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_for_Answers_0001.pdf | ||
| Sol_140P9723Q0012_Amd_0001.pdf | ||
| Sol_140P9723Q0012.pdf | ||
| B08_RFQ_Content.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service, Glacier Bay National Park & Preserve, Technical Specifications Attachment
FUEL DOCK BOOM SYSTEM
1. General Description of Needed Equipment: Glacier Bay National Park and Preserve is seeking a dedicated oil boom containment system to be mounted and used at the Bartlett Cove fuel dock for emergency response. The following Salient Characteristics (Sections 2.1 thru 4) shall be met or bettered. Package to be delivered to Glacier Bay National Park, Gustavus Alaska.
2. Equipment Salient Characteristics:
2.1. Standard Flotation Boom (SFB):
2.1.1. 10” solid floatation boom freeboard 4” draft 6”
2.1.2. Flotation 36” designed for use with boom reel
2.1.3. Total length 500’
2.1.4. ASTM Slide End Connectors
2.1.5. 22oz PVC
2.1.6. Ballast chain: 3/16” galvanized
2.1.7. Reinforced anchor points
2.1.8. 2 Tow bridles ASTM connectors sized for SFB 10
2.2. Boom Reel:
2.2.1. Sized for holding 500’ of SFB 10
2.2.2. Marine Grade Aluminum
2.2.3. Manual Operation with hand brake
2.2.4. Base dimensions not to exceed 8’x8’
2.2.5. Weatherproof cover to fit over fully laden reel
2.3. Tidal compensators/slides:
2.3.1. 2 each
2.3.2. Track or I-beam to accommodate 20-foot tidal swing
2.3.3. Marine grade aluminum
2.3.4. Roller assembly with rigid floats and ASTM connector for SFB10
2.4. Dock Roller
2.4.1. Length to match face of boom reel 6-8 feet
2.4.2. Heavy PVC or marine grade aluminum roller
2.4.3. Vertical guides
2.4.4. Pillow block bearings
2.4.5. Channel aluminum feet
2.5. Tether rings:
2.5.1. 3 Each
2.5.2. Designed to fit 18” pilings and freely move up and down
2.5.3. Heavy duty rollers
2.5.4. Rigid floatation
2.5.5. Stainless steel chain
3. Spares: 1 extra towing bridle and 1 set of Field Repair Kit for SFB10” containing the following:
3.1.1. 1 piece of PVC fabric 2m²
3.1.2. 2 Shackles
3.1.3. 2 ASTM bolt and springs
3.1.4. 1 ASTM coupling
3.1.5. 10 stainless steel bolts, nuts and washers for ASTM
3.1.6. 20 0z Glue suited for repair applications of PVC boom
4. Warranty:
Manufacturer’s full coverage on all equipment or hardware shall be no less than twelve months from date of delivery. Items must comply with regulations and or guidelines provided by OPA-90, and ASTM F1523
5. Shipping and Delivery:
Entire package shall be prepped for barge or overland shipment. Complete FOB shipping address shall be to: The National Park Service, Glacier Bay National Park, 1 Park Road, Gustavus AK 99826. FOB Delivery shall be completed no later than April 14, 2023.