B08_Solicitation_-_Bid_Schedule_-_Platte_Point_Restoration.pdf
PDF 120 KB Posted
- Attached to
- Platte Point Restoration Federal contract opportunity
- Solicitation number
- 140P6423B0003
About this file
This document provides details for a federal contract solicitation for the Platte Point Restoration project. The National Park Service Midwest Region is seeking bids to restore the Platte River mouth and surrounding dune areas at Sleeping Bear Dunes National Lakeshore in Empire, Michigan. Work includes reshaping the riverbank and dunes to pre-dredging conditions and providing all labor, materials, tools and equipment. The solicitation number is 140P6423B0003 and the project value is between $250,000 and $500,000. This will be a firm-fixed price contract adhering to Construction Wage Rate Requirements for Benzie County. The NAICS code is 237990 for the 100% small business set aside. A site visit is available and registrations in SAM and ORCA are required to be eligible for award. The point of contact is Christopher Bauer at christopher_bauer@nps.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawings.pdf | ||
| Construction_Contract_Administration.pdf | ||
| Project_Specifications.pdf | ||
| Bid_Schedule_-_Platte_Point_Restoration.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Wage_Determination.pdf | ||
| Sol_140P6423B0003.pdf | ||
| Notice_to_Contractors.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location Unit Quantity Price/ Unit Subtotal
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
% 0% -$ % 0% -$ % 0% -$
Material Labor
Landscaping - Topsoil, Mulch, Grass Seed
Overhead % Profit % Bonds %
SUBTOTAL
Total of all four locations #1 through #4
SUBTOTAL
Site Earthwork - Excavation, Hauling, Final Grading, Material
Material
SUBTOTAL
Site Preparation - Temporary Roads, Silt Fence
Sleeping Bear Dunes National Lakeshore Facility Management Division
Material
SUBTOTAL
GRAND TOTAL
Labor
Labor
Labor
Item
BID SCHEDULE
Site Clearing - Grubbing, Small Tree Removal, Waste Debris Hauling
Project: Platte Point Restoration
National Park Service U.S. Department of Interior
File details come from the government source that posted it. Updated .