B08 Solicitation_Atch 4_Submittal Form CM16.doc
DOC document 128 KB Posted
- Attached to
- REPLACE TIMBER CURB & SIDEWALK PARK LOTS Federal contract opportunity
- Solicitation number
- 140P6321B0010
About this file
This document contains a submittal form template for use on federal construction contracts. The form is to be used by contractors to transmit submittals such as shop drawings, product data, or samples to the contracting officer's representative for review. It includes spaces for the contractor to provide basic information and signature, as well as for the reviewer to note the submittal number, provide comments, and indicate approval. Accompanying the form template is information on a related federal contract opportunity to replace deteriorated timber curbing and walkways at Badlands National Park, solicited by the National Park Service Midwest Region under solicitation number 140P6321B0010.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 Solicitation_Atch 1_Specifications.pdf | ||
| B08 Solicitation_Atch 3_RFI Form.docx | DOCX document | |
| B08 Solicitation_Atch 5_Payroll Form_DOL_WH_347_7_14_06.pdf | ||
| B08 Solicitation_Atch 7_DI-137 Release of Claims.pdf | ||
| B08 Solicitation_Atch 6_Statement and Acknowledgement_SF 1413.pdf | ||
| B08 Solicitation_Atch 2_Wage Determination.pdf | ||
| Sol_140P6321B0010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL - NATIONAL PARK SERVICE
Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
PMIS No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification
Section No.
Description of Item
(Size, Type, Name, Manufacturer, Use, Etc.)
| Contractor Signature |
| Recommended by |
| Title, Date |
| Title |
| Date |
I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
| Review Comments |
| Action By |
| Date |
Contracting Officer’s Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________]
Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00
| TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE |
| Transmittal No.: |
Sheet: 1 of:
Park:
Project:
Contract No.:
PMIS No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification
Section No.
Description of Item
(Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16 Rev. 06/06
File details come from the government source that posted it. Updated .