B08 Dumpster PWS_8.8.2024.pdf

PDF 278 KB Posted

Attached to
JPMRC 25-01 Refuse (Dumpsters) Federal contract opportunity
Solicitation number
W91QVP-24-Q-5001
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide dumpster and refuse removal services to support military operations on the island of Oahu, Hawaii.

The key details are:

  • The contract is for a non-personal service to provide dumpster rental, refuse removal, and hauling services.
  • The period of performance is 1 September 2024 to 8 November 2024.
  • The contractor must provide all necessary personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items to perform the required services, except for certain government-furnished items.
  • Key tasks include delivering and picking up 40 cubic yard capacity dumpsters, servicing dumpsters on a set schedule, and providing urgent dumpster servicing within 8 hours of a request.
  • The contract will be awarded as a firm-fixed-price contract by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files for this federal contract opportunity

Other files attached to JPMRC 25-01 Refuse (Dumpsters), newest first.
File Type Posted
Questions and Answers for RFQ 24-Q-5001 Refuse.pdf PDF
B08 Pricing Sheet Dumpsters JPMRC-25-01 40CY only 8.8.24.xlsx XLSX spreadsheet
B08 RFQ 24-Q-5001 Refuse (Dumpsters) 8.15.2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUG 24

PERFORMANCE WORK STATEMENT (PWS)

Dumpster Hauling and Refuse

8 August 2024

Part 1 General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide dumpster and refuse removal services to support military operations at varying locations on the Island of Oahu, Hawaii.

1.2 Background: US Army participates in DoD Operations and training events that require these services to sustain the force as they achieve training objectives.

1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.

1.3.1 Specific services for this contract include, but are not limited to, all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide dumpster rental, refuse(waste) removal, and hauling services as defined in this Performance Work Statement (PWS), except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards in this contract.

1.3.2 Due to the volatility of US Army Military Exercises, contractors must remain flexible to changes in the periods of performance, quantities, and potential for the addition of services within the general scope of the contract.

1.4 Objectives: The objective of the work performed under this contract is to ensure continuous, safe, and reliable waste disposal that supports the customer’s mission.

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The contractor’s existing quality assurance system shall be utilized in accordance with (IAW) FAR 12.208.

1.5.1.1 Reserved.

1.5.1.2 The Contractor shall inform the COR, or Contract Specialist otherwise, of issues or potential issues that might affect the performance within two (2) hours of identifying those issues. Verbal reports shall be followed up by written reports within 1 day of discovery of the issue.

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: The contractor will work on US Federal and Hawaii state holidays if a call Period of Performance contains these holidays, unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: Reserved.

1.5.4.2 Government Facility Operating Hours: Reserved.

1.5.4.3 Contractor Support Hours: The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential. See Part 5 of the PWS for specifics; coordinate with the Contracting Officer Representative (COR), if applicable, for scheduling during contract performance.

1.5.4.3.1 Contractor Work Plan: Reserved.

1.5.5 Training Holidays: Reserved.

1.5.6 Place of Performance: The work to be performed under this contract includes but is not limited to Schofield Barracks, Bellows AFB / MCTAB, KTA, Dillingham Air Field, Wheeler Army Air Field, and HMR/Basilan. Services shall only be performed on the island of Oahu, Hawaii.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Security Program: Reserved.

1.6.2 Personnel Security Clearance Requirements: Reserved.

1.6.3 Installation Access: Access to U.S. Installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.

The contractor shall comply with requirements of electronic or web-based systems for vehicle and personnel passes in order to gain unfettered access to military installations.

Contractor personnel performing work under this contract shall not have been convicted of any felony and shall pass a criminal background check prior to access the installation.

The Government reserves the right to deny access to or ban any Contractor employee from the installation.

The Contractor shall safeguard all Government equipment, information, facilities, and property provided for Contractor use.

Access and General Protection/Security Policy and Procedures: Contractor and all associated sub-contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For Contractors That Do Not Require CAC, but Require Access to a DoD Facility or Installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.6.3.1 Installation Pass Log: Reserved.

1.6.3.2 Individual Termination or Expiration of Employment: Reserved.

1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes, if applicable, and return them to the issuing office within 3 days.

1.6.3.4 Common Access Cards (CAC) and CAC Log: Reserved.

1.6.4 Background Checks: Reserved.

1.6.4.1 U.S. Citizen: Reserved.

1.6.4.2 Local Nationals and Third Country Nationals: Reserved.

1.6.5 Physical Security: The Contractor shall safeguard their own equipment without the assistance of the US Government.

1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.

1.6.7 Anti-Terrorism (AT) Level I Training: IAW AR 525-13, Antiterrorism, all Contractor employees, including sub-contractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of the requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the KO or designated Government Representative/COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: http://jko.jten.mil.

1.6.7.1 If access to a computer is not available, the unit’s Level II Anti-Terrorism Officer (ATO) will conduct AT Level I training for the Contractor and employees within 30 business days after contract start and maintain a copy of the attendance roster for one (1) year. Any Contractor hired after contract start will be required to receive AT Level I training within 30 calendar days by Fort Wainwright ATO. It will also be acceptable for the new hire to take the training on line and present the training certificate to the KO or designated Government representative/COR http://jko.jten.mil/ within 30 calendar days. If the requiring activity does not have an ATO, the first ATO in the chain of command will conduct this training.

1.6.8 iWATCH Training: The Contractor shall brief the local iWATCH program (training standards provided by the Rock Island’s ATO) to all of Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Fort Wainwright, Police Department and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government Page 16 of 55 representative/COR via both electronic and paper copy within 30 calendar days of completion.

1.7 Key Control: Reserved.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The following personnel are considered key personnel by the Government: the contractor’s lead contract manager and/or site manager. Key personnel MUST be fluent in English in both spoken, listening, and written form.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 Reserved.

1.12.2 Reserved.

1.13 Contractor Travel: Any contractor travel is done so at the expense of the contractor.

1.14 Other Direct Costs (ODCs): Reserved.

1.15 Data Rights: Reserved.

1.17 Non-Disclosure Requirements: Reserved.

1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.18 Non-Disclosure Statements: Reserved.

1.19 Organizational Conflict of Interest (OCI): Reserved.

1.20 Phase In /Phase Out Period: Reserved.

1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:

Contractor activities shall be conducted in a safe manner that minimizes accidents as well as any impacts on Army operations and members of the public. Contractor shall comply with applicable Federal, State, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.

http://www.dimoc.mil/resources/limitations/

1.21.1 Safety Laws and Regulations: The Contractor shall comply with the all applicable National Safety Laws and Regulations.

1.21.2 Emergency Services: The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment.

The Contractor will, in turn, notify the KO and the Requiring Activity (RA) Point of Contact (POC) within 30 minutes of the incident.

The Contractor may, at their option, use the Installation’s Emergency Services, available by dialing 9-1-1. Emergency medical treatment and other emergency services for Contractor personnel are the responsibility of the Contractor, including any fees or charges imposed.

1.22 Environmental Compliance: The contract shall adhere to all host nation environmental laws, to include, but not limited to, the proper disposal of hazardous materials.

1.22.1 Environmental Compliance Plan and Program: Reserved.

1.23 Required Training: Reserved.

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract

Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Work Day - The number of hours per day the Contractor provides services in accordance with the contract.

2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence

CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison

USAREUR United States Army Europe UOM Unit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services

The contractor is solely responsible to provide the necessary services, facilities, utilites, equipment, and so forth in order to meet the requirements in this contract.

3.1 Services: Reserved.

3.2 Facilities: Reserved.

3.3 Utilities: Reserved.

3.4 Equipment: Reserved.

3.5 Special Tooling and Test Equipment: Reserved.

3.6 Materials: Reserved.

3.7 Training: Reserved.

3.8 Common Access Cards (CAC): Reserved.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.

4.2 Secret Facility Clearance: Reference paragraph 4.1.

4.3 Materials: Reference paragraph 4.1.

4.4 Vehicles and Equipment: Reference paragraph 4.1.

PART 5

SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services for dumpster rental, hauling, delivery, dumping, and pick-up of dumpsters as defined in this Performance Work Statement (PWS). Contractors will be required to work weekends during the performance of this contract.

5.2 Tasks: Tasks consist of the following sub paragraphs. The contractor may provide an alternative solution that meets the requirements.

5.2.1: Dumpsters: The contractor shall provide dumpsters and while servicing conduct a one for one swap for dumpsters being serviced – i.e. when servicing a dumpster bring an empty dumpster to replace the dumpster being removed. This includes but is not limited to the delivery and pick-up of dumpsters (40 cubic yard capacity), servicing of dumpsters, and relocation of dumpsters.

(a) STD: Dumpster - a waste receptacle of varying size and dimension, commonly described in cubic yard capacity. Cubic yard capacity required include 40 cubic yard internal capacity.

An illustrative example of a 40-yard dumpster with accompanying size comparisons.

(b) STD: Delivery / Pickup - The contractor shall be responsible for placing and recovering the dumpster(s) in a safe and secure manner at the designated locations within the requested timeframe. Dumpsters will be emplaced in such a way as to prevent tipping or falling over. The contractor shall be liable for any damages that may arise caused by the failure to properly place and secure the dumpster(s). Defective dumpster(s) will be rejected by the government and replaced by the vendor at no expense to the government. All equipment shall be emplaced and ready for use no later than 1200 on the first day of the period of performance and picked up no later than 48 hours after the end of the period of performance.

(c) STD: Servicing of dumpsters. When conducting dumpster services, Contractor shall do a one for one swap for dumpsters being serviced – i.e. when servicing a dumpster or multiple dumpsters bring an empty dumpster to replace the dumpster being removed and cycle them accordingly. Contractor must empty dumpster of all contents to include recyclables. The contractor shall be prepared to empty up to 10 dumpsters per day for servicing (SEE Pricing sheet for dumpster servicing schedule). Hazmat items will not be placed in the dumpster.

An illustrative example of a dumpster off-load/on-load.

(d) STD: Servicing of dumpsters – Urgent. The contractor shall service a dumpster within 8 hours of request from the KO or COR. If contractor cannot complete the urgent service within 8 hours, any subsequent service performed shall be considered routine.

Contractor must empty dumpster of all contents to include recyclables; hazmat items will not be placed in the dumpster. This Urgent service is in addition to the Dumpster servicing schedule annotated on the pricing sheet.

(e) The Contractor shall notify the Directorate of Public Works (DPW) Environmental Division immediately after asbestos or other HAZMAT has been identified.

(f) STD: Relocation of dumpsters – The contractor shall relocate dumpster(s) upon request within 24 hours of notification from the KO or COR.

(g) STD: Scheduling – Contractor shall follow the servicing schedule as annotated in the Pricing Sheet. The KO or COR are the only personnel who can alter the schedule and they may alter the schedule with 48hrs notice and the contractor must abide.

(h) STD: Ordering. Unit of Measure (UM): Quantity of Dumpsters. The Quantity of dumpsters needed is Thirty-Six (36), Forty (40) Cubic Yard Dumpsters.

5.2.2: Servicing, Maintenance, and Security: The following paragraphs are applicable to all services described in this PWS.

(a) STD: Contractor is responsible of furnishing all materials, labor, management, supervision, tools, components, supplies, services and equipment necessary to deliver, set-up, install, perform daily services, and remove the equipment required for services.

All services are for 24 hours a day unless otherwise specified at the Call. The contractor shall ensure equipment is safe, serviceable, and ready for use 24hrs per day, unless otherwise specified.

(b) STD: All equipment shall be delivered in serviceable conditions without holes, cracks, leaks, or corrosion. The Contractor is solely responsible for the cleanliness, maintenance, fueling, and other costs associated with providing all services in this

PWS.

(c) STD: Repairs/Replacement/Maintenance. The contractor shall make necessary repairs to equipment upon identification of deficiencies. The contractor shall make repairs identified by the COR within 24 hours. The contractor shall respond to emergencies within four (4) hours when notified by the COR or contracting officer. Emergency is defined as the inability to use the service (dumpster, etc) as intended or a safety concern.

(d) STD: The contractor is responsible for the security of contractor equipment. The government is not liable for usage, theft, loss, damages, or replacement costs.

(e) STD: Safety gear. The Contractor shall ensure that all employees are supplied and use proper safety equipment (i.e. gloves, safety glasses and boots) and follow APF policy for safety procedures.

(f) STD: The contractor shall provide all fuel, oils, insurance, tools, base access, economic zone fees, entry fees, repairs, maintenance, and any other operational costs for all services and equipment to be fully operational for the duration of this contract. These will not be priced separately and will be built into the total contract price.

5.2.3: The Contractor shall, at no additional cost to the Government, obtain all licenses and permits required for performance of work and for complying with all applicable local, state, and federal laws, rules, and regulations.

5.2.4: Invoicing: All Contractor invoices shall be submitted via Wide Area Work Flow (WAWF) using contract line item numbers (CLINs). The contractor shall be required to establish account(s), access method(s), log-in(s), and get necessary training in order to submit invoices through WAWF. Invoices not submitted via WAWF shall not be accepted or paid.

5.3 Service Contract Reporting

5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address: www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct http://www.sam.gov/ questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.

Steps for Submitting a Service Contract Report (SCR)

1. Go to www.sam.gov and log in.

2. Select Entity Registrations and then select Service Contract Reporting.

3. SAM displays your entities which have service contracts and meet the reporting criteria.

Select View by entity to see the service contracts for each entity.

4. Next, select Add for the service contract against which you want to create a Service

Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.

5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:

• Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).

• Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.

6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.

7. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.

Steps for Editing a Submitted Report

1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.

2. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.

STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in corresponding paragraph above.

AQL: 100% Compliant

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.

http://www.sam.gov/

6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)

6.1.2 Department of Defense Security Agreement (DD Form 441)

6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)

6.1.4 Installation Access Control (AE Reg 190-16)

6.1.5 The Army Physical Security Program (AR 190-13)

6.1.6 Contractor Identification (AE Reg 27-715)

6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)

6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)

6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)

6.1.10 Information Assurance (AR 25-2)

6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)

6.1.12 Policies and Procedures for Property Accountability (AR 735-5)

PART 7

ATTACHMENT AND TECHNICAL EXHIBIT LISTING

7. Attachment and Technical Exhibit List

7.1 Technical Exhibit A – Performance Requirements Summary

7.2 Technical Exhibit B – Deliverables Schedule

TECHNICAL EXHIBIT A

PWS Task Standard Inspections

5.2.1 (a) Dumpster Rental

Dumpster must be in good serviceable physical condition. Dumpster must be the correct size/capacity.

How: 100% Inspection

5.2.1 (b) Delivery / Pickup

Dumpster must be placed in a safe/secure manner, as designated by the COR. Must be delivered NLT 1200 on the first day, and picked up NLT 48 hours after the end of PoP.

How: 100% Inspection

5.2.1 (c) Servicing

Dumpster must be emptied of all contents, including recyclables IAW servicing schedule.

How: Periodic inspection and customer complaint

5.2.1 (d) Urgent Servicing

Dumpster must be serviced within 8 hours of request from the KO or COR. Anything 8+ hours is considered routine servicing.

How: 100% inspection

5.2.1 (e) Relocation

Dumpster must be relocated within 24 hours of request from the KO or COR.

How: Periodic inspection and customer complaint

5.2.2 (c) Repairs/ Replacement

The contractor shall make repairs/ replacements identified by the COR within 24 hours.

How: 100% Inspection

5.2.2 (c) Emergencies

The contractor shall respond to emergencies within four (4) hours when notified by the COR or KO.

How: 100% Inspection

TECHNICAL EXHIBIT B

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Name and contact information of the Contract Manager and designated alternate

Within 3 days of award

1 copy Email KO and

COR

Names and Photocopies of Identification for all Contractor Employees requiring access to the place/location of performance

Within 3 days of award

1 copy MS Word or PDF KO and

COR

Equipment Pre- Inspection Sheet

3 days after delivery

1 copy PDF KO and

COR

Equipment Post- Inspection Sheet

3 days after completion of services

1 copy PDF KO and

COR

File details come from the government source that posted it. Updated .