This is a solicitation for chiller preventative maintenance and vibration and oil analyses services. The U.S. Army Corps of Engineers is seeking these services for one ammonia chiller and three industrial chillers located at the Cold Regions Research and Engineering Laboratory facility. Quotes are due by December 14, 2023. The selected contractor will perform all maintenance tasks for the 23-ton ammonia chiller and conduct vibration and oil analyses on the three industrial chillers. The contractor must have a minimum of five years of experience maintaining similar GEA-manufactured chillers and be able to perform the proprietary vibration analyses using GEA software. The period of performance is from January 12, 2024 to May 3, 2024. Evaluation criteria include technical approach, expertise, price, and experience. Award will be made based on best value to the government.

View the file

Other files for this federal contract opportunity

Other files attached to Chiller Preventative Maintenance & Vibration and Oil Analyses, newest first.
File Type Posted
A02.12_Attachment A to PWS 23-Ton Maint.pdf PDF
A02.12_Attachment B to PWS 23-Ton Maint..pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W913E524Q0001 30-Nov-2023

b. TELEPHONE NUMBER

217-373-7309

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 14 Dec 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W913E59. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KIM D ROBERSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81EWF32767209

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ERDC CONTRACTING OFFICE

HANOVER OFFICE

72 LYME ROAD

HANOVER NH 03755-1290

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W14GQK 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFP

PR W2R2 COLD RGNS RSCH ENG LAB

ELIEZER WEBER

72 LYME ROAD

HANOVER NH 03755-1290

TEL: 603-646-4232 FAX:

(217) 373-6773FAX:

TEL: (217) 373-7297 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$19,000,000

NAICS:

238220

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF32

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W913E524Q0001

Section A - Solicitation/Contract Form

POINTS OF CONTACT

NOTE: Only a warranted Contracting Officer (KO), acting within his/her delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, the Contractor shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting Officer will be at the Contractor's own risk.

CONTRACTOR POC:

Name: TBD at time of award Phone Number:

Email:

GOVERNMENT TECHNICAL POC (TPOC):

CONTRACTING OFFICER REPRESENTATIVE (COR):

CONTRACT SPECIALIST (CS):

Name: Kim Roberson Phone Number: (217) 373-3478 Email: Kim.D.Roberson@usace.army.mil

CONTRACTING OFFICER (KO):

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

CHILLER PREVENTATIVE MAINTENANCE

FFP

The Contractor shall furnish all labor, supervision, tools, materials, equipment, incidental engineering, transportation, and any other items and services necessary to perform the tasks outlined in Section C, Performance Work Statement (PWS).

FOB: Destination

MILSTRIP: W81EWF32767209

PURCHASE REQUEST NUMBER: W81EWF32767209

PSC CD: J041

NET AMT

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

Chiller Preventative Maintenance & Vibration and Oil Analyses

1 Introduction. The US Army Corps of Engineers Cold Regions Research and Engineering Lab (CRREL) located at 72 Lyme Road, in Hanover, New Hampshire has a requirement to conduct preventative maintenance on one (1) ammonia chiller system (hereafter referred to as the 23-ton #1 system). The 23-ton #1 system includes a GEA model 125GMX compressor package charged with R-717. The GEA compressor package was integrated into a refrigeration package to cool CRREL’s main cold glycol loop. The 23-ton #1 system received all necessary startup checks and is now in need of an 8,000-hour service as shown in the attached maintenance schedule (attachment A).

CRREL also has two (2) industrial medium-temperature chillers (hereafter referred to as MTC#1 and MTC#2) and one (1) low-temperature chiller (LTC) at the Frost Effects Research Facility (FERF). MTC#1 and MTC#2 are GEA model 85GMX compressor packages. LTC is a GEA model 125GMXE compressor package. MTC#1 and MTC#2 received Class B inspections, including vibration and oil analyses, on April 4 and 5, 2023 during which both chillers were found to have stage 3 (of 4) bearing failure, reports of which are presented in attachment B. The oil analyses did not find oil contaminants concentrations indicating excessive wear. CRREL would like to reperform the vibration and oil analyses on MTC#1 and MTC#2 to corroborate the findings. LTC has approximately 4,000 hours of operation, so it is not due for servicing, however, CRREL would like to perform the same oil and vibration analyses on the LTC.

1.1 Scope. The Contractor shall furnish all labor, supervision, tools, materials, equipment, incidental engineering, transportation, and any other items and services necessary to perform the tasks under the 8,000-hour service interval on the 23-ton #1 system and perform the vibration and oil analyses on MTC#1, MTC#2, and LTC. All work on the 23-ton #1 system, MTC#1, MTC#2, and LTC will follow guidance in each system’s respective manual and guidance from manufacturers regarding safety, materials used, and methods.

2 General Requirements. The Contractor shall plan, program, administer, manage, execute, and complete the work necessary to provide the specified services. The Contractor shall perform all administrative services, such as material procurement, quality control, financial control, and correspondence, and maintain accurate and complete records and files.

The Contractor shall have a minimum of five (5) years of experience in installation, troubleshooting and maintenance of GEA-manufactured chillers. The Contractor must also have the experience and permissions to utilize GEA’s vibration monitoring and analysis platform. This experience must be documented in the solicitation response.

(1) Contractor Primary Point of Contact (POC). The Contractor shall designate a primary POC for work being performed during the execution of the contract. The Contractor primary POC shall keep the Contracting Officer’s Representative (COR) informed of the work progress and be available to the COR in the event of a change in the schedule or if any problems arise. The primary POC is required to be present at an initial Pre-Work Conference after award of this contract.

2.1 Non-Personal Services. The Government shall neither supervise the Contractor employees nor control the means or methods by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the Contracting Officer (KO) immediately.

2.2 Business Relations. Once notified by the government, the Contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The Contractor shall manage the timeliness, completeness, and quality of the deliverables.

2.3 Contract Administration and Management. The following subsections specify requirements for contract, management, and personnel administration:

2.3.1 Contract Management

The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement.

2.3.2 Contract Administration

The Contractor shall have the responsibility for supervising the support required and provide a POC for the Government to notify in case of emergency, proposed additions to the scope of work, and Government complaints about the performance of the work.

2.3.3 Personnel Administration

The Contractor shall provide all management and support as required. The Contractor shall make any necessary travel arrangements for employees.

2.4 Quality Control. The Contractor shall develop, and submit to the COR for approval, a quality control program to ensure fire, safety and security services are performed in accordance with established standards, within 30 days contract award. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the Contractor shall develop quality control procedures addressing the areas identified in the Performance Requirements Summary (PRS).

2.5 Quality Assurance. The government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan and PRS.

2.6 Subcontract Management. The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime Contractor will manage work distribution to ensure there are no Organizational Conflicts of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer (KO) or Contracting Officer Representative (COR). Cross teaming may or may not be permitted.

2.7 Location and Hours of Work. Accomplishment of the work contained in this PWS requires the work to be performed at the ERDC-CRREL's facility located at 72 Lyme Road, Hanover, New Hampshire 03755-1920. The laboratory is open for business from 0600 to 1800 hours, Monday through Friday. If the Contractor requests access earlier than 0600 hours, this must be coordinated the day before with the COR. If the Contractor requests access after 1800 hours, this must be coordinated by 1500 hours that day with the COR.

2.8 Period of Performance. The Period of Performance (PoP) is from 12 January 2024 to 3 May 2024.

2.9 Travel / Temporary Duty (TDY). The Contractor is responsible for arranging all travel to accommodate the PWS including mobilization of necessary contractor employees to accomplish all tasks stated in PWS, or through management of subcontractors as directed by Contractor. It is anticipated that this contract will require substantial

TDY of specialist technicians. TDY per diem rates must be capped at those of the Government, including hotel ($141.00/day for the Hanover, NH locality).

3 Performance Requirements. The following section specifies the Performance Objectives and Performance Elements for the contract. The contractor shall conduct the following specified work:

3.1 Specific Repair and Maintenance Activities

The following activities must be conducted by the contractor.

1. For the 23-ton #1 system, the Contractor shall perform all maintenance tasks recommended under an 8,000-hour service interval as shown in attachment A, Table 5-1. The Contractor will provide a written report documenting all maintenance performed, the status of each component prior to maintenance, any measurements taken, along with any additional noteworthy findings.

2. For the FERF chillers (MTC#1, MTC#2, and LTC), the Contractor shall perform vibration and oil analyses utilizing similar methods as the previous analyses. Previous vibration and oil analyses are presented in attachment B for reference to what is expected. The Contractor must use a method of data collection and analysis that documents at least the same data as, and can be directly compared to, the previous analyses in attachment B.

All deliverables must be submitted at the conclusion of the period of performance to the COR for the contract.

Additionally, the contractor must furnish a report (minimum one (1) page) synopsizing the findings and conclusions of the completed maintenance effort.

3.2 Performance Requirements Summary

Performance Requirement Summary (PRS)

Statements Standards/Acceptable Quality Level (AQL) Incentive/remedy The Contractor shall submit a plan showing all electricians working on site will be licensed electricians, and all refrigeration technicians working on site will have an EPA Universal License.

AQL: Provision of all training and certification documents for all contractor personnel to work on site before work commences.

Cure non-compliance at no additional cost to the Government

The Contractor shall implement policies to guarantee “an hour of work for an hour of pay” for all contract personnel conducting diagnostic and repair work on site.

AQL: Contractor will document all labor hours and supply to the COR for review.

Re-performance at no additional cost to the Government

The Contractor shall supply documentation for all parts installed to prove that the parts are OEM and manufacturer recommended.

100% compliance Re-performance at no additional cost to the Government

Contractor shall complete all required steps, measurements, etc.

100% compliance; 100% accurate.

Re-performance at no additional cost to the Government

Contractor shall submit completed reports (e.g., vibration and oil analyses) to COR

100% compliance Re-performance at no additional cost to the Government

Contractor shall submit 1 page synopsis of results

100% compliance Re-performance at no additional cost to the Government

3.3 Cleanup. The contractor is responsible for the area being free of debris, equipment, and other materials used or generated during the contract prior to close out of the contract.

4.0 Other Provisions. Covering requirements for personnel conducting the work.

4.1 Licensing/Certifications:

A. Overview: The Contractor must provide copies of their personnel’s licenses and/or certifications that pertain to this project; any licenses and certifications pertaining to GEA internal programs and EPA Universal Refrigeration licensure are relevant to this project. EPA Universal Refrigeration licensure is mandatory for all technicians working on the contract.

B. Site Safety and Health Officer (SSHO): The Contractor shall designate one Person as the SSHO and their training, experience, and qualifications shall be in accordance with EM 385-1-1 (corps of Engineers Safety and Health Requirements Manual). The Contractor shall submit documentation of SSHO qualifications to the COR.

(1) The SSHO shall be responsible for briefing and insuring correct training of all contractor and subcontractor personnel on the site.

(2) The SSHO shall have a minimum of 2 years’ experience in similar work environments; shall have experience in personal protective equipment; and a working knowledge of safety procedures as well as Federal and State occupational safety and health regulations.

(3) The SSHO shall have at least a 10-hour OSHA Safety Class certificate.

(4) Contractor employees performing other duties on site, that are qualified, may also be the designated SSHO for this project.

(5) The SSHO should be always on-call while Contractor and sub-Contractor personnel are on the site.

C. Disciplines: Vendor shall provide a copy of each employee’s licenses and certifications to the COR.

(1) HVAC&R Technicians – Vendor personnel performing the installation and maintenance of the refrigeration equipment shall have an HVAC&R Technicians license. It shall be provided either from a reciprocal state, NATE, or other equivalent recognized certification. Refrigeration and HVAC technicians shall hold an EPA Universal Refrigerant License.

(2) Electrical – Contractor personnel accessing panels shall have NFPA 70E Compliant Arc Flash Safety training.

4.2 Post Award Conference:

A. Overview: Contractor shall attend an onsite post award conference that will be arranged by the Government representative before any work on site commences.

B. Purpose: The purpose of the conference is to ensure all requirements for submittals are met, to discuss scheduling, to review safety, security, describe the plan for conducting the maintenance and exploratory work, inform Contractor of Government lines of authority, and to address other subjects or questions that may be raised by either the Government or Contractor.

C. Requirements: Contractor SSHO must be present and shall bring with them to the conference all submittals related to the contract Accident Prevention Plan. See 4.1.B for SSHO Requirement per EM385-1-1. Work shall not commence on site until the conference has taken place, all submittals have been approved, and there are no outstanding issues.

4.3 Scheduling:

A. Overview: Scheduling will be discussed at the post award conference. Work shall not commence until the work schedule has been approved. Once approved, the schedule shall be strictly followed.

No changes can be made by the Contractor without prior approval of the COR.

5.0 Security and Safety:

A. Department of Defense Safety Policies: DoD safety protocols are enforced on the CRREL site. All Contractor personnel shall comply with the safety guidelines in effect before being allowed on the premises. This may include, but is not limited to, answering a health questionnaire, and wearing personal protective equipment (PPE) while on-site.

B. Overview: This contract is subject to the requirements of and shall be in accordance with EM 385-1- 1, U. S. Army Corps of Engineers Safety and Health Requirements Manual, OSHA 29 CFR 1910 regulations covering personnel protective equipment, the CRREL Safety Office, and to any other local, state, and federal regulations that apply to the work. All Contractor personnel shall always maintain safe practices and procedures while on the CRREL site.

C. Accident Prevention Plan (APP): Contractor personnel will verbally brief COR on APP before commencing work. APP will be available for reference during post-award meeting.

D. Personal Protective Equipment (PPE): Contractor personnel performing work on site shall comply with OSHA PPE standards for protective equipment. Each specific task will be assessed, and the appropriate PPE shall be used. Examples include, but are not limited to: Gloves, glasses, hard hat, face shield, steel toed shoes, and Arc Flash clothing. Contractor is required to supply his employees with proper PPE.

E. SDS Sheets: Contractor shall submit to COR for review at least 2 business days before bringing on site. NOTE: No products or equipment containing Trichloroethylene (TCE) or exposed to TCE may be used or brought on site.

F. Routes of Egress: The Contractor shall ensure work does not block egress routes in the case of an emergency.

G. Fall Protection: Fall protection threshold height is 4 feet. The Contractor shall comply with EM 385-1-1 Safety and Health Requirements Manual when accessing work areas at or above that threshold. OSHA Fall Protection Training for Competent Person is acceptable.

H. Equipment: Contractor equipment used to access work areas (i.e., ladders, lifts, cranes) shall be current with manufacturer’s safety inspections and certificates. Inspection certificates must accompany any equipment used on site. Equipment shall be made available for inspection by the COR prior to start of work on-site.

I. Barriers/Barricades and Signage: The Contractor shall provide barriers or barricades and signage as necessary to ensure unauthorized pedestrian or vehicle traffic cannot enter work areas until safe to do so.

J. Portable Extension Cords: If it is necessary to use portable extension Cords, they shall be sized in accordance with manufacturer ratings for the tool to be powered and protected from damage.

Portable extension cords shall be GFCI and shall meet the requirements of NFPA 70, NFPA 70E and OSHA electrical standards.

K. Asbestos: If the Contractor encounters any material that could contain asbestos, they shall immediately report finding to COR. The material shall not be disturbed until it has been investigated and identified.

6.0 Antiterrorism/Operations Security (AT/OPSEC):

6.1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative

(e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts.

Contractor personnel allowed on site shall follow all sign-in and security regulations as directed by the CRREL Security Office and the Contracting Officer Representative (COR), and as listed below:

A. U.S. Citizens – Only U. S. Citizens are allowed on site.

B. Personnel List – Contractor shall supply the COR with a list of his employees who will be working on the CRREL site.

C. Positive Picture ID – Contract personnel shall provide a positive picture ID prior to site access.

D. Identification Badges – Contractor personnel are required to sign in with Security and to obtain and wear security identification badges while on the Government site.

E. Weapons – No weapons of any kind are allowed on site either in vehicles or on persons.

F. Access/Deliveries – Contractor shall notify the COR the day before or as soon as possible when Contractor or his subcontractors are to arrive or deliveries of equipment and/or supplies are to occur.

Contractor must receive his or his subcontractor’s own deliveries. Government personnel are not allowed to receive deliveries for any Contractor.

G. General Disruption – General disruption by Contractor is limited to the immediate work areas.

Contractor products, tools, and/or equipment shall stay within the immediate work areas.

H. Tools/Equipment – Contractor is strictly responsible for the security of all products, tools, and/or equipment used during the duration of this contract. Tools and equipment used under this contract shall be maintained in good condition and shall be used and stored always using safe practices and procedures in accordance with manufacturer’s instructions and recommendations. Tools and equipment shall be restricted to the immediate work area unless alternate arrangements are requested and approved through the COR. GFCI protection is required for portable tools and portable extension cords.

I. Site Visits – Contractor should provide notice two weeks before commencing work with a scheduled date to arrange security clearance on site. For site visits related to planning before work begins, two days of notice with COR are required, including full legal names of any visitors.

J. Smoking Policy - Smoking shall comply with the CRREL Smoking Policy, which, in general, prohibits smoking on site except in a designated smoking area. Designated smoking areas will be discussed at the post award conference.

K. Government Furnished Utilities - The Government will furnish to the Contractor, in reasonable quantities, water and electricity to successfully complete this contract. Contractor may use the sanitary facilities in the Main Lab and FERF.

L. Control of Waste - During performance of all work on site, Contractor shall control waste and debris to ensure that it stays within the work area. Contractor shall remove waste and debris from the site and properly dispose of it daily.

M. Damage to Work or Site - Installation of new materials shall not cause any damage to surrounding areas or items. Contractor shall repair, at his own expense, all damages that occur to new work, the work areas, or any surrounding areas or items if damages are caused because of the performance of Contractor work under this contract. All repairs shall be done as directed by the Government.

6.2. Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

6.3. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

6.4. Suspicious Activity Reporting training (e.g., iWATCH, CorpsWatch, or See Something, Say Something):

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

6.5. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.

Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit to the Contracting Officer to become part of the official contract file.

7.0 CONTRACTOR INSTRUCTIONS. Contractor is hereby notified that NO CRREL/DPW EMPLOYEE has the authority to direct contract employees in any way to alter their contractual obligations. If the Government does desire to alter requirements, changes will be issued in writing and signed by the Contracting Officer (KO) sited in your contract. Contractor’s employees shall take no action on any change unless and until the POC receives such a contract modification.

8.0 INSPECTION AND WORK COMPLETION:

A. Overview: This contract is subject to routine Government inspections throughout the performance of Contractor work and a final Government inspection upon completion of each task.

B. Inspections: Routine Government inspections will, among other things, help ensure continuous quality assurance and more quickly identify defects. Contractor shall repair defects as directed by the Government at Contractor’s own expense.

C. Work Completion: Upon Contractor completion of the Work, the Government will make a final inspection to confirm the following:

(1) All defects have been corrected as directed.

(2) All work has been completed.

(3) All work areas are left clean.

(4) All badges issued to Contractor employees have been returned to the CRREL Security Office.

9.0 Controlled Unclassified Information (CUI). Regarding DFARS clauses 252.204-7012 and 252.204-7020, there is no CUI data involved in this contract effort.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 12-JAN-2024 TO

03-MAY-2024

N/A PR W2R2 COLD RGNS RSCH ENG LAB

ELIEZER WEBER

72 LYME ROAD

HANOVER NH 03755-1290

603-646-4232 FOB: Destination

W14GQK

52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

INVOICING INSTRUCTIONS

A proper invoice must include the following items:

Name and address of the contractor (must match SAM registration information) Invoice date and invoice number Contract number (ex., W913E524P0001) Description, quantity, unit of measure, unit price, and extended price of supplies delivered, or services performed Shipping and payment terms (e.g., shipment number and date of shipment, discount for prompt payment terms)

Submit invoice via email to:

CEFC-Payments@usace.army.mil

To avoid delay in payment, include in the email CC line, the following:

Primary Invoice Receiver: TBD at time of award Backup Invoice Receiver: TBD at time of award Technical Point of Contact: TBD at time of award Contracting Officer’s Representative: TBD at time of award

If more than one invoice is required, the Contractor’s final invoice shall be submitted within 45 days after the final period of performance date specified in the contract. The invoice must be clearly marked “final” and submitted as outlined above.

Section I - Contract Clauses

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services

DEC 2022

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-10 Waste Reduction Program MAY 2011 52.223-19 Compliance with Environmental Management Systems MAY 2011 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

JAN 2023

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements JAN 2023 252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7001 Buy American And Balance Of Payments Program--Basic JAN 2023 252.225-7002 Qualifying Country Sources As Subcontractors MAR 2022 252.225-7036 Alt I Buy American--Free Trade Agreements--Balance of

Payments Program (JAN 2023) Alternate I

JAN 2023

252.225-7048 Export-Controlled Items JUN 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro

Regime

JAN 2023

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial

Services

JAN 2023

252.247-7023 Transportation of Supplies by Sea JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div.

C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub.

L. 111-117, section 743 of Div. C).

X (8) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub.

L. 117-328).

X (9) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).

___ (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

____ (11) [Reserved]

____ (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).

____ (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (14) [Reserved]

X (15)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-6.

____ (16)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-7.

X (17) 52.219-8, Utilization of Small Business Concerns (SEP 2023) (15 U.S.C. 637(d)(2) and (3)).

____ (18)(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (NOV 2016) of 52.219-9.

____ (iii) Alternate II (NOV 2016) of 52.219-9.

____ (iv) Alternate III (JUN 2020) of 52.219-9.

____ (v) Alternate IV (SEP 2023) of 52.219-9.

____ (19) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

____ (ii) Alternate I (MAR 2020) of 52.219-13.

____ (20) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).

____ (21) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).

____ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2022) (15 U.S.C.

657f).

X (23) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2023) (15 U.S.C. 632(a)(2)).

____ (ii) Alternate I (MAR 2020) of 52.219-28.

____ (24) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

____ (25) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

____ (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

____ (27) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

X (28) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

X (29) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (DEC 2022) (E.O. 13126).

X (30) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

X (31)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

____ (ii) Alternate I (FEB 1999) of 52.222-26.

____ (32)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

____ (ii) Alternate I (JUL 2014) of 52.222-35.

X (33)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

____ (ii) Alternate I (JUL 2014) of 52.222-36.

____ (34) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

____ (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.

13496).

X (36)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (37) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

____ (38)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (39) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

____ (40) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(JUN 2016) (E.O. 13693).

____ (41)(i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (42)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (JUN 2014) of 52.223-14.

____ (43) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

____ (44)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (JUN 2014) of 52.223-16.

X (45) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.

13513).

____ (46) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

____ (47) 52.223-21, Foams (JUN 2016) (E.O. 13693).

____ (48)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

____ (49) (i) 52.225-1, Buy American--Supplies (OCT 2022) (41 U.S.C. chapter 83).

____ (ii) Alternate I (OCT 2022) of 52.225-1.

____ (50)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (DEC 2022) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I [Reserved].

____ (iii) Alternate II (DEC 2022) of 52.225-3.

____ (iv) Alternate III (JAN 2021) of 52.225-3.

____ (v) Alternate IV (OCT 2022) of 52.225-3.

____ (51) 52.225-5, Trade Agreements (DEC 2022) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (52) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (53) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

____ (54) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150

____ (55) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.

5150).

____ (56) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

____ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

____ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

X (59) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C.

3332).

____ (60) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

____ (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

____ (63) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

____ (64)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C.

55305 and 10 U.S.C. 2631).

____ (ii) Alternate I (APR 2003) of 52.247-64.

____ (iii) Alternate II (NOV 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]

_____ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

X (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (E.O.

13658).

_____ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).

_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.

117-328).

(vi) 52.219-8, Utilization of Small Business Concerns (SEP 2023) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(viii) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

(ix) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

(x) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

(xi) 52.222-37, Employment Reports on Veterans…