B08.02 Solicitation 23R0010.pdf

PDF 1 MB Posted

Attached to
Fill Material Federal contract opportunity
Solicitation number
W912EF23R0010
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

View the file

Other files for this federal contract opportunity

Other files attached to Fill Material, newest first.
File Type Posted
B.08.03 Amendment 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912EF23R0010 03-May-2023

b. TELEPHONE NUMBER

509-527-7222

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 24 May 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

RUTH A JOHNSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USAED, WALLA WALLA - CONTRACTING DIV.

RUTH A. JOHNSON

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1976

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

509-527-7802FAX:

TEL: 509-527-7222 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

212321

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF70

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Jackson Hole Fill Material Supply II 2023-2028 W912EF23R0010

PROJECT TABLE OF CONTENTS Page 3

Section SF 1449 - CONTINUATION SHEET

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

3,000.00 1,250,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

INSTRUCTIONS TO OFFERORS

BIDDER INQUIRY:

Bidder/Offeror Solicitation Questions:

All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-site that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at (https://www.projnet.org)

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question

PROJECT TABLE OF CONTENTS Page 4 will receive an acknowledgement of the comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

TIMING OF BIDDER INQUIRIES: Bidders are encouraged to submit their bidder inquiries promptly. The Government will make every effort to answer all bidder inquiries; however, the closer to the solicitation due date an inquiry is received, the less likely it is that a timely response can be provided.

The Bidder Inquiry Key is: Y42X34-PC4S8J

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be use from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for Entering Questions:

1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit" a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public” c.) Discipline: This is where you select who this question should be directed to. Example; if the question is about an electrical drawing or specification select: “Electrical” from the pull down list.

d.) Sheet. Enter the sheet number of the drawing you are asking about.

e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about.

f.) Specification. Enter the Specification number and paragraph number.

g.) File. Use this if you are going to attacha pdf file.

h.) Question. Enter your question here.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk toll free at 1-800-428- HELP, which operates from 8AM to 5PM (Central US time zone). Bidder inquiry help questions can also be emailed to the helpdesk at staff@projnet.info

Offerors are cautioned to clearly print prices for all line items. Be especially careful placing decimal points, as a mistake in your offer may render it unresponsive. Your quote must be valid for 30 calendar days after the due date specified for receipt of quotations. Please include shipping costs in the quoted price of each item.

PROJECT TABLE OF CONTENTS Page 5

Registration at www.sam.gov is required. If not registered, please do so. Step-by-step help information on how to register is detailed on the website, along with frequently asked questions (FAQs). Lack of registration in the SAM database may make an offeror ineligible for award.

Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required in order for the GSA Federal Service Desk (FSD) to activate the entity's registration. Both Federal Assistance entities and all non-Federal entities must mail the original, signed copy of the notarized letter to the Federal Service Desk. Failure to do so within 30 days of activation may result in the registration no longer being active. Mail the completed, signed, notarized letter to:

FEDERAL SERVICE DESK

ATTN: SAM.GOV REGISTRATION PROCESSING

460 INDUSTRIAL BLVD

LONDON, KY 40741-7285

UNITED STATES OF AMERICA

Completion of the required FAR 52.212-3 Alt. I, Offeror Representations and Certifications – Commercial Items is required. When you complete your SAM registration, the link to complete your Reps and Certs is also available.

Please do not hesitate to contact me or the SAM web site if you need assistance or have questions.

In accordance with FAR 52.229.3, State and Local Taxes, and per Title 4 of the US Code 104-107, the Government is exempt from paying local and state taxes. Exempt Tax Identification Number 91-0828090.

General Contract Information:

Delivery Date________________________________________________

Offeror’s Name (Printed) _________________________________________

Offeror’s Contact Telephone Number_______________________________

Offeror’s Email Address___________________________________________

Federal Tax Identification No. ____________________________________________

CAGE Code __________________ DUNS No. ______________________________

Is your company registered on-line in SAM (www.sam.gov)? YES NO

To ensure receipt of your quote, please send to the attention of Ruth Johnson at:

Email: ruth.a.johnson@usace.army.mil

ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS

Submission of Price Quote – Contractor shall submit the following in 1 copy:

1. Signed and dated Standard Form 1449 (Solicitation / Contract / Order for Commercial Items).

2. Signed and dated Standard Form 30, if applicable, for any Amendments to the Solicitation

3. Completed schedule (pricing information) for all line items listed in the solicitation / amendments.

4. Completed Clause 52.212-3 and Alt I, “Offeror Representations and Certifications – Commercial Item’s” As noted above.

BASIS FOR AWARD

PROJECT TABLE OF CONTENTS Page 6

The Government will award one contract resulting from this solicitation in accordance with FAR 13.106 to the responsible offeror meeting or exceeding all solicitation requirements and representing the best value based on price.

TECHNICAL SPECIFICATIONS

PROJECT TABLE OF

CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY

(OPSEC)

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 42 37.81 28 JACKSON HOLE LEVEES FILL MATERIAL SUPPLY II

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 7

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 00 00.00 28

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00.00 28

GENERAL REQUIREMENTS

07/19/2020

PART 1 GENERAL

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

GENERAL REQUIREMENTS

07/19/2020

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran Employment Information http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/

Army Wounded Warrior Program -http://wct.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material https://www.dol.gov/sites/dolgov/files/VETS/files/Employer-Guide-to-Hiring-Veteran

-- End of Section --

SECTION 01 14 00.90 28

DIVISION 01 - GENERAL REQUIREMENTS

INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

09/14/2022

1.1 REFERENCES

1.2 RESOURCES

1.3 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

09/14/2022

The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS. This contract does not require access to or handling of classified material.

This contract does not requires access to secured and restricted areas, sensitive information, or equipment.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

FEDERAL ACQUISITION REGULATIONS (FAR)

FAR 52.222-54 Employment Eligibility Verification

FAR 22.18 Employment Eligibility Verification

Website for Federal Acquisition Regulation Supplement:

https://www.acquisition.gov/browse/index/far

1.2 RESOURCES

The following resources are accessible from the Walla Walla District (NWW) Public Website:

https://www.nww.usace.army.mil/Business-With-Us/Contracting/AT-OPSEC-for-Contractors/

a. E-Verify Program.

1.3 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

a. Contractors shall comply with the requirements set forth in FAR 52.222-54 Employment Eligibility Verification and FAR 22.18 in using the E-Verify Program to meet the contract employment eligibility requirements. See paragraph RESOURCES for link to the E-Verify website.

b. An initial list of verified/eligible candidates shall be provided to the Government Representative no later than three business days after receipt of Notice of Award. Submit pre-screening results to the Government Representative via email as a password protected PDF file.

c. Submit updates to list of verified/eligible candidates within three business days of new verifications. The Contractor shall maintain a current list of verified/eligible employees as part of their contract files and provide copies to the Government Representative upon request.

d. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Government Representative to become part of the official contract file.

SECTION 35 42 37.81 28

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

JACKSON HOLE LEVEES FILL MATERIAL SUPPLY II

DEC 2022

1.1 SUMMARY OF WORK

1.2 REFERENCES

1.3 PROJECT SCHEDULE

1.4 PRE-WORK MEETING

1.5 PRE-WORK AND POST WORK SURVEYS

1.6 WORKING HOURS AT THE STOCKPILE SITES

1.7 LEVEE ACCESS

1.7.1 Pedestrian Access

1.7.2 Road And Bridge Restrictions

1.8 GATE SECURITY AT STOCKPILE LOCATIONS

1.8.1 Gate Keys

1.9 CONTRACTOR STORAGE

1.10 OTHER CONTRACTS

1.11 TESTING OF EQUIPMENT

1.12 KEY PERSONNEL SUBSTITUTION

1.13 ENVIRONMENTAL

1.13.1 Protection And Restoration Of Existing Facilities

1.13.2 Regular Cleanup And Debris Disposal

1.13.3 Snow Removal Areas

1.13.4 Snow Removal

1.13.5 Snow Removal Equipment

1.13.6 Fuel/Oil Spillage

1.13.7 Dust Control

1.14 CONTRACTOR QUALITY CONTROL

1.14.1 Quality Control Manager

1.14.1.1 Organizational Changes

1.14.2 Documentation

1.15 GOVERNMENT QUALITY ASSURANCE

1.16 FILL MATERIAL

1.16.1 Contractors Responsibility

1.16.2 Acceptance of Materials

1.16.2.1 Visual Inspections And Measurements

1.17 FILL MATERIAL DELIVERY SCHEDULE

1.18 MEASUREMENT AND PAYMENT

1.18.1 Measurement

1.18.2 Payment

1.18.3 Remote Site Delivery

1.18.4 Gradation testing

PART 2 PRODUCTS

2.1 FILL MATERIAL

2.1.1 Quality

2.1.2 Gradation

PART 3 EXECUTION

3.1 DELIVERY AND STOCKPILING

3.1.1 Delivery

3.1.1.1 Stockpiling Fill Material

3.1.2 Location

3.1.3 Piling of Materials

ATTACHMENTS:

Activity Hazard Analysis (AHA)

JACKSON HOLE LEVEES FILL MATERIAL SUPPLY II

DEC 2022

1.1 SUMMARY OF WORK

This summary of work is a generalized description of work to be performed under this contract; specific descriptions of the work to be performed are contained in more detail in the body of the contract.

The project is located in Teton County, Wyoming, near the town of Jackson.

The project consists of 29 levees, 48 levee access roads, 4 small riprap stockpile sites, and the major stockpile site adjacent to the Walton levee. This work is to replenish the stockpile of levee fill material to support flood fight and annual maintenance efforts for the Jackson Hole Project for up to a five year period. This project will supply fill material to the major stockpile site and to remote sites as required to support ongoing levee work. In the event the Government directs fill material to be delivered directly to work sites on the levees, the Contractor will be reimbursed a surcharge based on additional haul mileage. Fill material deliveries will typically commence 15 August, and be complete by 15 November of any contract year, due to the onset of winter.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org

ASTM C117 (2017) Standard Test Method for Materials

Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing

ASTM C136/C136M (2019) Standard Test Method for Sieve

Analysis of Fine and Coarse Aggregates

ASTM D75/D75M (2019) Standard Practice for Sampling Aggregates

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

https:/www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-

1.3 PROJECT SCHEDULE

Following award of each Task Order, coordinate and establish a project delivery schedule with the Government Representative or their designated representative.

1.4 PRE-WORK MEETING

A tele-conference Pre-Work Meeting will be conducted at least ten (10) working days prior to the beginning of work. The purpose of this meeting is to discuss and develop mutual understandings relative to the general and technical, safety, quality control program, scheduling of work, and environmental protection provisions of the contract. Each of the following items shall be mailed or emailed to the Government Representative one (1) week prior to this meeting:

a. A list of all equipment to be used by the Contractor in the course of contract work.

b. A list of names and addresses of all employees and authorized site supervisor who will be working for the Contractor, including subcontractors and their employees.

c. Safety plan, Activity Hazard Analysis (AHA) and AHA Checklist.

d. A list of vehicles to be used, including ownership information and license plate numbers for each vehicle in the course of contract work. Any changes to equipment used in the course of this contract must be vetted through the Government Representative.

e. Environmental protection plan.

f. Suggested certified scale to be used for the project. Bring a copy of the Current State Certification to the meeting.

g. Gradation Test data performed on the fill material from the Contractor's source, performed by a State-Certified laboratory.

h. A letter stating the pit source or sources the Contractor intends to use, per paragraph FILL MATERIAL herein.

i. Documentation from the state showing fill material source is state certified. If the fill material is obtained through a subcontractor, provide verification showing the subcontractor is a small business, in accordance with the Non-Manufacturers Rule (FAR 19.102(f)(7)).

j. Using the E-Verify Program as specified in SECTION 01 14 00.90 28

INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC),

provide an initial list of verified/eligible candidates to the Government Representative within three business days after Notice of Award.

k. A Pre-Work Survey of levees and access roads to catalog existing damages prior to the start of work. See Pre-Work And Post Work Surveys paragraph herein.

l. Documentation that the fill material is certified as weed-seed-free.

1. Supply weed-seed-free fill that is compliant with standards by the Wyoming Weed and Pest Council using one of these two methods, as documented in a letter from the Weed and Pest District local to the source pit. Additional information may be obtained at the Wyoming Weed and Pest Control website.

a. http://www.wyoweed.org/weeds/weed-free-forage.

2. Or provide fill that is complaint with the North American Invasive Species Management Association (NAISMA) program for Weed Free Gravel Minimum Pit Standards.

Provide documentation annually from vendor of cooperation and compliance with either of these programs for the facility from which they are receiving the clean weed-seed-free fill. Documentation must include inspection certificate(s) that the standards of one of the above programs has been meet.

See paragraph Documentation for mailing address.

1.5 PRE-WORK AND POST WORK SURVEYS

Conduct a Pre-Work Survey prior to start of on-site work and a Post-Work Survey during project closeout, with the Government Representative, of the levees and access roads. The results of the surveys shall be documented by digital photographs and descriptive narrative reports. A color copy of the survey photographs and narrative reports shall be submitted to the Government Representative within five (5) days after survey has been completed.

1.6 WORKING HOURS AT THE STOCKPILE SITES

The Contractor's delivery of fill material to the stockpile sites shall be accomplished between the hours of 7:00 a.m. to 6:30 p.m. each workday unless otherwise specified herein, or authorized in advance by the Government Representative.

1.7 LEVEE ACCESS

The levees are located on private property. There is a speed limit of 25 mph while traveling on the Walton levee, unless reduced by the Government Representative. All other levees have a maximum speed of 15 mph.

1.7.1 Pedestrian Access

There is public pedestrian access on the Walton Levee, the Public Levee, and the Boat Ramp Levee. Contractor is responsible for maintaining a safe speed to ensure safety of these pedestrians.

1.7.2 Road And Bridge Restrictions

There are road and bridge restrictions in the area. Contractor is responsible for following the local road and bridge restrictions in the Project area. Contact the Teton County Roads and Levees Department for current information.

1.8 GATE SECURITY AT STOCKPILE LOCATIONS

Gate security shall be the responsibility of the Contractor. Delivery locations are protected by one or more gates. To ensure landowner privacy and to prevent cattle and other livestock from escaping, the gates shall be kept closed at all times, except when trucks are passing through. At the Contractor's option, gate guards may be placed at levees and/or access road gates to maintain security and facilitate truck traffic.

1.8.1 Gate Keys

Maintain a key register to document employee possession of Government keys. Upon request from the Government Representative, make available for inspection the key register or photo copy of it. Extra keys shall be kept in a locked and secured key cabinet. Discharged employees shall be required to turn in all Government keys. All occurrences of lost keys shall be reported to the Government Representative within 24 hours of loss. For each occurrence of a key being lost or stolen, the Contractor shall be required to reimburse the Government for actual costs of a new key and combination of all locks affected by the lost key. Keys shall not be duplicated.

1.9 CONTRACTOR STORAGE

The Contractor may request to store equipment long term at the main stockpile site. The Government will not be liable for the theft or destruction of any Contractor's tools or equipment left at the main stockpile site or any of the other quarry stockpile sites.

1.10 OTHER CONTRACTS

The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees and carefully fit their own work to such additional work as may be directed by the Government Representative. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractors or Government employees.

1.11 TESTING OF EQUIPMENT

Before any machinery or mechanized equipment is put to use on the job, it shall be inspected and tested by a qualified person and determined to be in safe operating condition. Cranes or derricks shall be tested by the Contractor or a qualified testing agency in accordance with EM 385-1-1.

Equipment shall be large enough to safely handle proposed picks or tasks without exceeding the rating established by these tests.

1.12 KEY PERSONNEL SUBSTITUTION

If the Contractor plans on replacing the Site Supervisor or Quality Control Manager, they must have the approval of the Government Representative and the new personnel qualifications must meet or exceed the personnel they are replacing.

1.13 ENVIRONMENTAL

1.13.1 Protection And Restoration Of Existing Facilities

Take precautions to prevent damage to existing facilities while performing work under this contract. Upon completion of the work, all the existing facilities not included as a portion of the work shall be left in a condition equal to the condition existing at time of contract award.

In particular, the Contractor is responsible for any damages to the levee surfaces or access roads caused by contract work, such as wash boarding or levee shoulder damage. In the event of damages, the Contractor shall replace lost material and grade surfaces as needed.

The pre-work condition of the levee surfaces as documented in the Pre-Work Survey shall serve as the baseline to determine any damages caused by Contractor activity.

1.13.2 Regular Cleanup And Debris Disposal

All debris resulting from the work regardless of size, such as packing cases, scrap lumber, metal grindings, and all other debris shall be collected and removed from the project site daily and disposed of in a legal manner.

1.13.3 Snow Removal Areas

Access roads to the main stockpile site and other sites may be covered with snow from October until late spring. Heavy snow accumulation is common in the Jackson area and can remain on the ground well into or throughout the spring. Snow plowing operations required to maintain access to the designated stockpile area(s) shall be the responsibility of the Contractor.

1.13.4 Snow Removal

Remove snow from all or part of the access roads and levees traveled to facilitate safe and efficient PROJECT use and to protect the roads and levees. Perform work in a manner to preserve and protect roads, levees, and appurtenances, and to prevent damage to adjacent land. Do not undercut banks or blade gravel or other surfacing material off the roads or levees. Drainage ditches and culverts shall be functional during and after completion of snow removal operations.

1.13.5 Snow Removal Equipment

Any type of equipment may be used to remove snow, providing the equipment is of the size and type commonly used to remove snow and will not cause damage to the roads or levees. On roads and levees that have a crushed rock surface, dozers shall be equipped with shoes or runners to keep the dozer blade a minimum of two (2) inches above the road or levee surface, unless otherwise approved by the Government Representative.

1.13.6 Fuel/Oil Spillage

Special measures shall be taken to prevent chemicals, fuels, oils, greases, and bituminous materials from entering surface and subsurface waters. All prevention/cleanup materials shall comply with all federal and state laws and regulations. The Contractor shall provide and utilize the following prevention/cleanup materials:

a. An emergency spill response kit shall be carried on board each piece of equipment performing work. For heavy equipment such as excavators, the spill kit shall be located at the work site.

b. Emergency spill response kits shall be sufficient for the largest quantity spill that could occur based on equipment being used and shall be appropriate for spills on land or in water.

c. Any releases of oil or hazardous substances into state waters shall be reported to National Response Center (EPA and Coast Guard 1-800-424-8802) and State DEQ at 307-777-7781. Any spills of these substances of greater than 25 gallons on land shall be reported to Wyoming State DEQ at 307-777-7781, immediately, for both land and water spills, by the Contractor. Stabilization and cleanup of the spill shall begin immediately. For any sized spill, the Contractor shall also immediately notify the Government Representative.

1.13.7 Dust Control

Hauling and stockpiling operations shall be controlled by the Contractor to eliminate all unnecessary dust creating activities. Control dust so that vehicles are visible within the stopping sight distance for the average user speed on a particular section and to maintain air quality.

As a minimum, water shall be used for dust abatement, unless otherwise approved by the Government Representative. Adequate dust-control measures shall be employed as directed or approved by the Government Representative. Sprinkling, or other approved dust palliatives or stabilizing materials, as required to satisfactorily control dust, shall be applied at no additional or direct cost to the Government. Temporary construction roads, access haul roads (excluding streets and roads maintained by Teton County or State of Wyoming), levee crowns and work areas shall be maintained free from excessive dust by an approved program of water application, adequate sprinkling, graveling, chemical treatment, or other approved method, or combination thereof, for the duration of the Contractor's hauling.

1.14 CONTRACTOR QUALITY CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the work, to include that of subcontractors, complies with the requirements of the contract. The Contractor is responsible for quality control and shall establish and maintain an effective inspection system.

The quality control inspection system shall be adequate to ensure that all fill material complies with the contract requirements. The system shall cover all work operations and shall be keyed to the proposed work sequence.

1.14.1 Quality Control Manager

The Contractor shall identify an individual within their organization who will be the point of contact for the Government Representative. This individual shall be responsible for overall management of quality control (QC) and have the authority to act in all QC matters for the Contractor.

This manager shall be employed by the Contractor, except as noted herein.

An alternate for the QC Manager shall be identified in the plan to serve in the event of the system manager's absence. The requirements for the alternate shall be the same as for the designated QC Manager.

1.14.1.1 Organizational Changes

The Contractor shall obtain the Government Representative's approval before replacing the Quality Control Manager.

1.14.2 Documentation

Maintain current records of quality control operations, activities, and inspections, including the work of subcontractors. These records shall be on an acceptable form and shall include factual evidence that required quality control activities and inspections have been performed, including but not limited to the following:

a. Contractor/subcontractor and their area of responsibility.

b. Operating plant/equipment with hours worked, idle, or down for repair.

c. Control activities performed with results and references to specifications requirements. List deficiencies noted along with corrective action.

d. Job safety evaluations stating what was checked, results, and instructions or corrective actions.

e. List instructions given/received and conflicts in specifications.

f. Work performed each day giving location, description, and by whom.

g. The QC manager shall have a copy of all reports and weight tickets on site and available for review by the Government Representative.

h. Copies of all weight tickets shall be scanned and emailed to the Government Representative within 2 business days of each fill material delivery.

Mailing Address:

District Commander ATTN: CENWW-ODB Kenneth Koebberling Walla Walla District Corps of Engineers 201 North Third Avenue Walla Walla, WA 99362-1876

Email address: Kenneth.E.Koebberling@usace.army.mil

1.15 GOVERNMENT QUALITY ASSURANCE

a. The Government will monitor the Contractor's performance under this contract using quality assurance procedures developed by the Government. Typical procedures might include random sampling, checklists and observations.

b. The Government reserves the right to inspect and test all materials called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.

c. If any of the materials do not conform to contract requirements, the Government will request the Contractor to remove the materials and replace them with materials that conform with contract requirements at no additional cost to the government.

1.16 FILL MATERIAL

The Contractor shall designate in writing only one source or one combination of sources from which they proposes to furnish fill material.

The fill material source shall be approved by a state or other government agency, and proof of the government approval shall be included with the written fill material source designation. This approval is not to be construed as approval of the fill material source required under this contract. This designation shall also include any test results for the source fill material, the location by section, township, and range, pit name, owner, and operator using the pit. It is the Contractor's responsibility to determine that the fill material source or combination of sources selected is capable of providing the quality, quantities, and gradation needed to meet the requirements of these SPECIFICATIONS and at the rate needed to maintain the scheduled progress of the work.

1.16.1 Contractors Responsibility

The Contractor shall make their own arrangements concerning availability of all sources. The payment of royalties, disposal of wastes, and restoration of the borrow areas or quarry upon completion of the work shall be the Contractor's responsibility. The Contractor shall also comply with all applicable local, State, and Federal laws and regulations including but not limited to the Clean Water Act, Resource Conservation and Recovery Act (RCRA), and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA).

1.16.2 Acceptance of Materials

Acceptance of a source of fill material is not to be construed as acceptance of all material from that source. The right is reserved to reject materials from certain localized areas, zones, or strata when such materials are unsuitable for fill material as determined by the Government Representative. The Government Representative also reserves the right to reject individual units of produced specified materials upon delivery to the stockpile when such materials are determined to be unsuitable.

1.16.2.1 Visual Inspections And Measurements

During the contract period, both prior to and after materials are delivered to the stockpile, visual inspections and measurements of the fill materials may be performed by the Government Representative. If the Government Representative, during the inspection, finds that the fill material quality or gradation of fill material being furnished is not as specified or is questionable, re-sampling and retesting shall be required. Sampling of the delivered fill material for testing and the manner in which the testing is to be performed, shall be as directed by the Government Representative. All testing shall be performed by a State Certified laboratory. This additional sampling and testing shall be performed at the Contractor's expense when test results indicate that the materials do not meet specified requirements. When test results indicate that materials meet specified requirements, an equitable adjustment in the contract price will be made for the sampling and testing per applicable contract line item "Gradation Testing". Any material rejected shall be removed or disposed of at the Contractor's expense.

1.17 FILL MATERIAL DELIVERY SCHEDULE

Deliveries of fill material to the main stockpile site and levees will typically begin 15 August of a contract year, to avoid impacts to nesting bald eagles and migratory birds. When the Government, after consultation with the Wyoming Fish and Game and the Fish and Wildlife Services, determines there is little to no risk to these species, the Government Representative may request earlier deliveries of fill material. The Contractor's schedule should reflect completion of fill material deliveries by 15 November of the contract year, to avoid impacts due to the onset of winter.

1.18 MEASUREMENT AND PAYMENT

1.18.1 Measurement

Fill material will be measured for payment as the number of tons of fill material satisfactorily manufactured and delivered to the delivery site.

Measurement will be made from weight tickets furnished to the Government Representative. Trucks shall be weighed on a state certified scale furnished by the Contractor or on a state certified permanently installed commercial scale. Scales shall be self-printing for producing weight tickets. Contractor-furnished scale shall be furnished, erected, and maintained by the Contractor. After erection, the scale shall be certified by the state in which the scale is located. A copy of the state certificate shall be furnished to the Government Representative before the scale is put into use. Trucks used to haul fill material shall be weighed empty weekly at times as directed by the Government Representative. Each truck shall bear a plainly legible identification mark.

1.18.2 Payment

Payment will be made at the contract unit price per ton for Item Nos.

ending in AA, "Furnish, Deliver and Stockpile Fill Material" to the main stockpiles or within 5 miles of the Highway 22 bridge. These prices and payments shall be full compensation for furnishing all plant, equipment, materials, and labor and for performing all work required to test, produce, load, weigh, deliver, unload, and stockpile fill material, complete, as specified and as approved. No payment will be made for any rejected materials and no separate payment will be made for disposal of rejected materials.

1.18.3 Remote Site Delivery

In the event the Government Representative directs fill material delivery to other than the stockpile sites specified to support ongoing levee rehabilitation, the Contractor will be paid an additional surcharge, applied to each ton of fill material hauled to the remote site, per Schedule Items AC. No other method, such as a surcharge based on ton/miles, shall apply. This surcharge only applies to additional road mileage of between 5-20 miles, as measured from the Highway 22 bridge to the point of remote delivery.

1.18.4 Gradation testing

Gradation testing will be measured for payment as the number of passing tests actually performed. Payment will be made at the contract unit price for Item Nos. ending in AB, "Gradation Testing", which price and payment shall be full compensation for furnishing all equipment, materials, and labor and for performing all work required to perform gradation testing, as specified and as approved. Gradation tests not passing will not be paid for.

PART 2 PRODUCTS

2.1 FILL MATERIAL

2.1.1 Quality

Fill material shall consist of naturally occurring sediments. The material shall be free of wood debris, roots, clay, organic matter, refuse, or other deleterious materials. The material will be certified weed-seed free.

2.1.2 Gradation

Submit gradation test results for the proposed source of fill material.

If more than one source is proposed, gradations test results shall be submitted for each separate source. The gradation test submitted shall have been performed within 6 months prior to contract award. During contract performance, additional gradation tests may be required.

Gradation tests shall be performed in accordance with ASTM C117, ASTM C136/C136M, and ASTM D75/D75M. The gradation of the fill material shall meet the following requirements:

Gradation Requirements for Fill Material

Sieve Size Percent Passing

8 in. 100

3 in. 80-100

1 in. 40-80

1/2 in. 25-60

No. 4 15-40

No. 30 10-30

No. 200 0-8

PART 3 EXECUTION

3.1 DELIVERY AND STOCKPILING

3.1.1 Delivery

The Contractor is responsible for delivery of all fill material. After the Contractor has begun delivery of fill material, they shall continue delivery, without interruption, until the total specified quantity has been delivered. The Contractor's scheduled days off will not be considered an interruption in the delivery. If the material being delivered to the delivery site does not meet specified requirements, delivery will be refused and the material shall be removed at the Contractors expense.

3.1.1.1 Stockpiling Fill Material

When delivering fill material to remote locations, the Contractor shall ensure dumped material does not damage the levee surface or obstruct levee traffic. If levee width or slopes inhibit the Contractor's actions to dump on the slopes of the levee, the Contractor shall use a loader or other wheeled equipment to push material off crest to maintain traffic flow.

3.1.2 Location

All fill material to be stockpiled, shall be delivered to a designated area of the main stockpile site. The main stockpile site will be located approximately five (5) miles northwest of the city of Jackson, Teton County, Wyoming, in the NE 1/4 of Section 24, Township 41 North, Range 117 West, Latitude 43.5075, Longitude -110.8309. Access to the main stockpile site is via the Walton Levee immediately North and East of Snake River Bridge on Highway 22. Travel north on levee road approximately 1 mile to the stockpile site access road. The actual stockpile location and limits of the stockpile area will be staked and/or flagged in the field by the Government Representative prior to delivery of fill materials, with an approximate area of 0.6 Acres.

The entrance to the access road for the main stockpile site is on the North side of Highway 22 and is immediately east of Highway 22 bridge.

3.1.3 Piling of Materials

Locate the stockpile to occupy as small an area as practical leaving adequate working room for removing the materials later. The stockpile sites only have a minimum amount of room for stockpiling material so the Contractor shall move the material accordingly to get the maximum amount of material in the defined stockpile location. The final height of the stockpile shall not exceed 30 feet, nor have side slopes steeper than 1H:1V, unless directed. Any method of stockpiling that would cause segregation or degradation of material will not be permitted. Unless otherwise allowed, place the material in horizontal layers not more than 4 feet in thickness. Each layer shall be completed over the entire area of the pile before depositing material in the succeeding layer. The material shall not be dumped so that any part of it runs down and over the lower layers in the stockpile. When stockpiling, the Contractor shall maintain as constant and regular a cross section as possible to facilitate surveying for quantities if necessary.

W912EF23R0010

BID SCHEDULE

Walla Walla District Corps of Engineers Fill Material Bid Schedule

Base Year The total estimated amount of this contract is expected to be

$1,250,000.00

CLIN Supply Items EstimatedQ uantity

U/M Unit Price Total Amount

0001AA Gradation Testing 1 JOB

0001AB Main Stockpile Fill Material 4500 Ton

0001AC Surcharge for CLIN 0001AB 4500 Ton

Bid Schedule Option Year 1

CLIN Supply Items EstimatedQ uantity

U/M Price Total Amount

1001AA Gradation Testing 1 JOB

1001AB Main Stockpile Fill Material 4500 Ton

1001AC Surcharge for CLIN 0001AB 4500 Ton

Bid Schedule Option Year 2

CLIN Supply Items EstimatedQ uantity

U/M Price Total Amount

2001AA Gradation Testing 1 JOB

2001AB Main Stockpile Fill Material 4500 Ton

2001AC Surcharge for CLIN 0001AB 4500 Ton

Bid Schedule Option Year 3

CLIN Supply Items EstimatedQ uantity

U/M Price Total Amount

3001AA Gradation Testing 1 JOB

3001AB Main Stockpile Fill Material 4500 Ton

3001AC Surcharge for CLIN 0001AB 4500 Ton

Bid Schedule Option Year 4

CLIN Supply Items EstimatedQ uantity

U/M Price Total Amount

4001AA Gradation Testing 1 JOB

4001AB Main Stockpile Fill Material 4500 Ton

4001AC Surcharge for CLIN 0001AB 4500 Ton

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 1,249,996 Job Base Year

FFP

Furnish, deliver and stockpile Fill Material in accordance with the Techncial Specifications. Peiord of Performance is 15-Jun-2023 through 14-Jun-2024.

The overall capacity will not exceed $1.25M cumulative of all task orders for this Single Award Task Order Contract (SATOC). Any unused capacity from this year will be rolled forward to the next exercised option year. The quantities of supplies and services specified in the Schedule are estimates only.

FOB: Destination

PSC CD: 5610

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001 1 Job OPTION Option Year 1

FFP

Furnish, deliver and stockpile Fill Material in accordance with the Techncial Specifications. Peiord of Performance is 15-Jun-2024 through 14-Jun-2025.

The overall capacity will not exceed $1.25M cumulative of all task orders for this Single Award Task Order Contract (SATOC). Any unused capacity from this year will be rolled forward to the next exercised option year. The quantities of supplies and services specified in the Schedule are estimates only.

UNIT UNIT PRICE ESTIMATED AMOUNT

2001 1 Job OPTION Option Year 2

FFP

Furnish, deliver and stockpile Fill Material in accordance with the Techncial Specifications. Peiord of Performance is 15-Jun-2025 through 14-Jun-2026.

The overall capacity will not exceed $1.25M cumulative of all task orders for this Single Award Task Order Contract (SATOC). Any unused capacity from this year will be rolled forward to the next exercised option year. The quantities of supplies and services specified in the Schedule are estimates only.

UNIT UNIT PRICE ESTIMATED AMOUNT

3001 1 Job OPTION Option Year 3

FFP

Furnish, deliver and stockpile Fill Material in accordance with the Techncial Specifications. Peiord of Performance is 15-Jun-2026 through 14-Jun-2027.

The overall capacity will not exceed $1.25M cumulative of all task orders for this Single Award Task Order Contract (SATOC). Any unused capacity from this year will be rolled forward to the next exercised option year. The quantities of supplies and services specified in the Schedule are estimates only.

UNIT UNIT PRICE ESTIMATED AMOUNT

4001 1 Job OPTION Option Year 4

FFP

Furnish, deliver and stockpile Fill Material in accordance with the Techncial Specifications. Peiord of Performance is 15-Jun-2027 through 14-Jun-2028.

The overall capacity will not exceed $1.25M cumulative of all task orders for this Single Award Task Order Contract (SATOC). Any unused capacity from this year will be rolled forward to the next exercised option year. The quantities of supplies and services specified in the Schedule are estimates only.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

1001 N/A N/A N/A N/A

2001 N/A N/A N/A N/A

3001 N/A N/A N/A N/A

4001 N/A N/A N/A N/A

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-11…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .