B08_Attachment_A_SOW_Debris_Removal_-_Hazardous_Trees.docx

DOCX document 52 KB Posted

Attached to
Tree and Debris Removal Services Federal contract opportunity
Solicitation number
140D0422Q0786
Issued by
Department of the Interior Departmental Offices Interior Business Center

About this file

This document outlines the scope of work for a tree and debris removal services contract opportunity with the Department of the Interior. The contract requires removing over 100 hazardous trees along the George Washington Memorial Parkway, grinding tree stumps, and hauling away approximately 30,000 cubic yards of recyclable material and 300 tons of non-recyclable waste. Tree removal services must be performed between 6:30 am and 4:00 pm from Monday through Friday. The period of performance for the contract is from date of award through May 31, 2023. The solicitation number for this opportunity is 140D0422Q0786. Bidders must follow all applicable safety, insurance, and environmental regulations.

View the file

Other files for this federal contract opportunity

Other files attached to Tree and Debris Removal Services, newest first.
File Type Posted
Sol_140D0422Q0786_Amd_0002.pdf PDF
140D0422Q0786_Amendment_A00002_0002.pdf PDF
Sol_140D0422Q0786_Amd_0001.pdf PDF
140D0422Q0786_Amendment_A00001_0001.pdf PDF
B08_Attachment_D_Wage_Determination_2015-4281.pdf PDF
Sol_140D0422Q0786.pdf PDF
B08_Attachment_C_Copy_of_Provision_52_212-3.docx DOCX document
B08_140D0422Q0786_-_Request_for_Quotation_Tree_and_Debris_Removal.pdf PDF
B08_Attachment_B_Tree_Details_with_GPS.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZZARDOUS TREE REMOVAL

GEORGE WASHINGTON MEMORIAL PARKWAY

A. SCOPE OF WORK

The purpose of this order is to obtain Hazardous Tree Removal services on grounds under the jurisdiction of George Washington Memorial Parkway (GWMP) along with the removal of debris within the same general area. Subsections I to IV below provide a list of the type and general location of the trees that require removal.

(…) represents Object ID # located on Excel Sheet “GWMP Hazardous Trees” (Attachment B) that includes GPS location coordinates for each tree. Included in Attachment B are various notes under Column “E” that outline additional specific tasks that apply to individual trees that the contractor is responsible for completing.

I. North Parkway from route 234 to Alexandria southbound

1. (43) Take down and remove, 20’’ American Elm

2. (44) Take down and remove, 32’’ American Elm

3. (45) Take down and remove 15’’ Poplar Tree

4. (46) Take down and remove 22’’ Locust Tree

5. (47) Take down and remove 14’’ Poplar Tree uprooting

6. (48) Take down and remove 18’’ Poplar Tree stub

7. (49) Take down and remove 18’’ Ash Tree

8. (50) Take down and remove 20’’ Ash Tree

9. (51) Remove Grind Topsoil 30’’ Red Oak

10. (52) Remove Grind Topsoil 38’’ Red Oak

11. (53) Remove Grind Topsoil 30’’ White Pine Stump

12. (54) Remove Grind Topsoil 36’’ White Pine stump

13. (60) Take down and remove 18’’ Red Oak

14. (61) Take down and remove 21’’ Red Oak

15. (62) Take down and remove10’’ Silver Maple

16. (63) Take down and remove 13’’ Maple

17. (64) Take down and remove 25’’ Box Elder heavy leaner

18. (65) Take down and remove 14’’ Red Oak

19. (66) Take down and remove 21’’ Red Oak

20. (67) Take down and remove 17’’ Mulberry

21. (68) Prune lower lead back to trunk app. 6” diameter

22. (69)) Take down and remove 22’’ Ash

23. (70) Take down and remove 10’’ Locust Tree and broken top

24. (71) Remove Grind Topsoil 25” Dead Oak in the median

25. (72) Take down and remove 14’’ American Elm Heavy leaner

26. (73) Take down and remove 16’’ Locust Tree

27. (74) Take down and remove 17’’ Tulip Tree Uprooting and trunk damage

28. (75) Take down and remove 19’’ Maple Tree uprooted, haul stump and tree debris

29. (76) Take down and remove 16’’ Sycamore Tree uprooting

30. (77) Take down and remove 18’’ American Elm

31. (78) Take down and remove 14’’ Ash

32. (79) Take down and remove 18’’ Tulip Tree Hollow heavy leaner

33. (80) Take down and remove, 10’’ Red bub tree

34. (81) Take down and remove, 15’’ Red bub tree double lead

35. (82) Take down and remove, 15’’ Sassafras tree and vines

36. (83) Take down and remove, 19’’ Cherry species heavy leaner

37. (84) Take down and remove, 16’’ Cherry species remove vines with the tree

38. (85) Take down and remove, 10’’ Sassafras tree

39. (86) Take down and remove, 18’’ American Elm roughly 20 yards in woods

40. (87) Take down and remove, 22’’ Mulberry remove vines

41. (88) Take down and remove, 8’’ Box Elder tree and vines

42. (89) Take down and remove, 21’’ Locust tree and vines

43. (90) Take down and remove, 20’’ American Elm remove broken debris on curb

44. (91) Take down and remove, Cut and remove all vegetation approximately 35’ from concrete curb.

45. (92) Take down and remove, 14’’ Cherry species.

46. (93) Take down and remove, 24’’ American Elm Remove all other trees leaning on the Elm and vines.

47. (94) Take down and remove, 22’’ American Elm Raise canopy above the road to 30’ high

48. (95) Take down and remove, 15’’ Red Maple

49. (96) Take down and remove, 15’’ Red Maple remove grind topsoil

50. (97) Take down and remove, 34’’ Red Oak remove grind topsoil

51. (98) Take down and remove, 45’’ Red Oak tree location is in woods going north parkway

52. (99) Take down and remove, 19’’ White Oak

53. (100) Take down and remove, 29’’ Red Oak remove grind topsoil. Located in median strip

54. (101) Take down and remove, 36’’ Red Oak

II. South Parkway

55. (22) Take down and remove, 32’’ Mulberry Remove grind topsoil

56. (23) Take down and remove, 23’’ Honey Locust Tree Remove grind topsoil

57. (24) Prune 21’’ Pine Tree. Prune dead and broken branches remove debris

58. (25) Take down and remove, 20’’ Red Oak remove grind topsoil

59. (26) Take down and remove, 36’’ Red Oak grind stump 60.(27) Take down and remove, 18’’ Pine Tree remove grind topsoil 61.(28) Take down and remove, 16”” Cherry species remove broken branches 62.(29) Take down and remove, 18’’ Pine Tree grind topsoil 63.(58) Take down and remove, 34’’ Mulberry grind topsoil

III. Central Parkway

64. (1) Take down and remove, 38’’ Red Oak remove grind topsoil

65. (2) Take down and remove, 34’’ Pin Oak remove grind topsoil

66. (3) Take down and remove, 38’’ White Oak remove grind topsoil

67. (4) Take down and remove, 16’’ Red Oak

68. (5) Take down and remove, 24’’ White Oak

69. (9) Take down and remove, 24’’ Pin Oak grind topsoil

70. (10) Take down and remove, 18’’ Pin Oak grind topsoil

71. (11) Take down and remove, 28’’ Pin Oak grind topsoil

72. (12) Take down and remove, 37’’ American Beech grind topsoil

73. (13) Take down and remove, 25’’ Pin Oak grind topsoil

74. (14) Take down and remove, 26’’ Willow Oak grind topsoil

75. (15) Take down and remove, 22’’ Willow Oak grind topsoil

76. (16) Take down and remove, 40’’ Cotton Wood cut and remove

77. (17) Take down and remove, 31’’ Pin Oak grind topsoil

78. (18) Take down and remove, 31’’ Pin Oak grind topsoil

79. (19) Take down and remove, 28’’ Pin Oak grind topsoil

80. (20) Take down and remove, 39’’ Willow Oak grind topsoil

81. (21) Take down and remove, 23’’ American Hornbeam grind topsoil

82. (59) Take down and remove, 60’’ Mulberry grind topsoil

IV. BID Options for Tree Removal

83. (6) Take down and remove 40’’ Red Oak. ARHO

84. (7) Take down and remove 20’’ Willow Oak. ARHO

85. (8) Take down and remove 24’’ Chestnut Oak. ARHO

86. (30) Take down and remove 27’’ Willow Oak. FT. Hunt grind topsoil

87. (31) Take down and remove 15’’ Willow Oak. FT. Hunt grind topsoil

88. (32) Take down and remove 28’’ Red Oak. FT. Hunt grind topsoil

89. (33) Take down and remove 13’’ Red Oak. FT. Hunt grind topsoil

90. (34) Take down and remove 28’’ Red Oak. FT. Hunt grind topsoil

91. (35) Take down and remove 22’’ Red Oak. FT. Hunt grind topsoil

92. (36) Take down and remove 21’’ Red Oak. FT. Hunt grind topsoil

93. (37) Take down and remove 34’’ Red Oak. FT. Hunt grind topsoil

94. (38) Take down and remove 44’’ Red Oak FT. Hunt

95. (39) Take down and remove 33’’ American Elm. FT. Hunt

96. (40) Take down and remove 33’’ Red Oak. South Parkway grind topsoil

97. (41) Take down and remove 39’’ White Oak. South Parkway grind topsoil

98. (42) Take down and remove 39’’ White Oak. South Parkway stump removal

99. (55) Take down and remove 30’’ Ash Tree. Clara Barton PKWY

100. (56) Take down and remove 8’’ Ash Tree. Clara Barton PKWY

101. (57) Take down and remove 16’’ Linden Tree. Clara Barton PKWY grind topsoil

102. (102) Cut and remove all vegetation 20’ back from white fog line. Clara Barton PKWY

103. (103) Take down and remove 16’’ American Elm. Clara Barton PKWY Covered in vines

104. (104) Take down and remove 30’’ American Elm. Clara Barton PKWY covered in vines

105. (105) Take down and remove 20’’ American Elm. Clara Barton PKWY heavy leaner

V. Debris Removal

Due to diseases such as the Emerald Ash Borer, tree species succession within the Chesapeake Bay watershed, and increasingly large storm events piles of organic debris have become unmanageable from a park staff level. Road operations along the parkway have generated piles of waste including asphalt millings. Debris such as vehicle tires, automobile parts, and illegal dumping activities have generated a significant amount of waste. GWMP’s MS4 Storm Water Pollution Prevention Plan, filed with the Virginia Department of Environmental Quality under MS4 General Permit No. VAR040100, identifies the waste piles as a significant source of pollution along the Potomac River, and requires the removal of the waste to reduce pollution sources from GWMP properties.

The Government anticipates that the contractor will need to remove approximately 30,000 yards of recyclable material and approximately 300 tons of non-recyclable material.

B. MANAGEMENT

The Contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.

I. SAFETY & ENVIRONMENTAL COMPLIANCE

1. The Contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), state, and local safety laws and regulations.

2. The Contractor shall comply with pertinent local, state, and federal environmental protection laws and regulations.

3. The Contracting Officer (CO) and Contracting Officer’s Representative (COR) has the authority to issue restraint or cease-and-desist orders to the Contractor when violations or unsafe acts are present and threaten Government and Contractor employees or damage to Government property.

4. The Contractor shall immediately report to the COR all accidents resulting in employee injury or death or damage to property while performing this contract. The Contractor shall provide safety controls to protect the life and health of Contractor and Park employees and any other persons within the area where the Contractor is working, as well as for the prevention of damage of property, materials, supplies, equipment and natural and cultural resources in the performance of this contract The contractor shall comply with all pertinent provisions of the Occupational Safety and Health Administration (OSHA) Standards, 29 CFR 1910, and 1926;. All OSHA requirements may be obtained without cost to the general public at www.osha.gov. The Contracting Officer or Risk Manager may include additional measures if determined necessary or required by other federal, state or local law, or park policy.

5. The Contractor shall have a Hazard Communication Program in place as required by 29 CFR 1910.1200 where Safety Data Sheets (SDS) / Technical Data Sheets shall be obtained by the contractor for all hazardous materials to be used in the performance of this contract. These SDS’s and an inventory of hazardous materials must be provided to the CO or COR prior to bringing the material on site. The first time a new substance, which requires a MSDS due to its hazardous status, is proposed to be brought into the Park, a copy of the SDS with detailed reasoning for use of such a material shall be submitted through to the COR. Only after written approval from the park Safety Manager is received by the Contractor, can this new substance be brought into the Park. SDS shall be maintained at any jobsite where a substance requiring a SDS is being used. It shall also be available in any vehicle carrying such substance while in the Park. These SDS will be available to all employees of the Contractor, employees of the Park, concessionaires and the public when any member of these groups might come in contact with, or be exposed to, any substance requiring a SDS due to its hazardous status. The contractor must have an active HAZARD COMMUNICATION PROGRAM in place for all employees as required by 29 CFR 1910.1200.

6. Working in a Federal building or federally controlled indoor workspaces:

In order to take steps to prevent the spread of COVID-19 and to protect the health and safety of all Federal employees, onsite contractors, visitors to Federal buildings or Federally controlled indoor workspaces, and other individuals interacting with the Federal workforce, employees under the subject contract who are required to work on site in Federal buildings or Federally controlled indoor worksites must comply with requirements located at https://www.saferfederalworkforce.gov/overview/.

II. PERSONAL PROTECTIVE EQUIPMENT

1. Employees are required to use appropriate personal protective equipment, as defined by OSHA and as interpreted by the Park. At a minimum this must include:

2. The wearing of safety shoes/boots anytime work is being done for the park.

3. Approved safety glasses, hearing protection, and hard hats must be provided by the Contractor, and be available on-site, for all contractor employees and must be used where required by OSHA standards and as directed by the COR.

4. All personal protective equipment must meet ANSI standards.

III. ENVIRONMENTAL REQUIREMENTS

The Contractor shall comply with all existing Federal, Maryland, Virginia and District of Columbia regulations pertaining to hazardous material use, storage, and disposal. Contractor will report possession of any hazardous materials to the COR.

IV. INSURANCE

1. The Contractor shall be insured in accordance with the Maryland, Virginia and District of Columbia insurance regulations. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.

2. Liability: The Contractor shall maintain a level of insurance that will protect the Contractor and the Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.

13.0 INSURANCE. The Contractor shall procure and maintain, during the entire period of performance under this Contract, in accordance with FAR Clause 52.228-5 Insurance-work on a Government installation, the following kinds and minimum amounts of insurance:

a. Workmen’s Compensation:$100,000 (per person or, in compliance with applicable state statutes.)
b. Employer’s Liability:$100,000 (minimum)
c. Commercial General Liability$300,000 (per occurrence)
d. Commercial Automobile Liability$100,000 (per person for each road licensed vehicle)$300,000 (per accident for bodily injury

$50,000 (per accident for property damage)

V. NON-PAYMENT FOR ADDITIONAL WORK.

Any additional Contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the Contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

VI. INSPECTION

The Government will conduct inspections periodically and upon completion of the required services. Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.

VII. INITIAL INSPECTION AND DOCUMENTATION

1. On a mutually agreeable date within 15 days after receiving the notice of award, the Contractor shall make a complete and systematic inspection of all systems covered under this contract with the COR. Within 5 days of the inspection, the Contractor shall submit an itemized list to the COR of the existing deficiencies or obstacles that would cause hardship to the project.

2. Should the Contractor’s inspection disclose any deficiencies, which present a safety or health hazard, the hazard shall immediately be brought to the attention of the COR.

3. The Contractor shall not make plumbing changes, alterations, or any other permanent changes to the pipes or fixtures without the approval from the COR. The Contractor shall reflect all approved changes on plumbing with a well-defined sketch or drawing (as built) and related operation literature.

4. The Contractor shall remove all oily rags, hazardous materials and other waste and debris generated by repairs or replacement work on a daily basis when work is being performed.

5. The Contractor shall take all precautions to avoid the danger of fire, damage to historic structures, safety of the park’s employees and visitors.

VIII. SAFETY INSPECTIONS

1. Contractors are subject to inspection by park staff, and/or other Federal, State or local agencies. These inspections may be routine, unannounced, or based on unsafe and unhealthy working conditions.

2. Safety violations observed by the COR will be reported to the Contracting Officer. If a violation is deemed to be immediately dangerous to life and health, or serious in nature, the COR, any Park Officer at the Division Chief Level or higher, or the Park’s safety officer will have authority to stop the Contractor’s work until such time as the matter can be resolved to the Contracting Officer’s satisfaction.

3. Contractor shall provide proper signage and secure work area to ensure visitor and staff safety while performing the work.

IX. HOUSEKEEPING

1. All places of employment shall be kept clean to the extent that the nature of the work allows.

2. Material and debris shall be kept to a minimum and disposed of at the end of each day, or whenever the job is completed, whichever is shorter. Park visitors and the public shall be kept free from recognized hazards.

X. OCCUPATIONAL SAFETY AND HEALTH PROTECTIONS

The contractor shall exert every effort to reduce the number of occupational safety and health hazards. The contractor shall comply with the following legislative, executive, and regulatory directives:

1. Public Law 91-596, Occupational Safety and Health Act of 1970, Sec. 19(a), Federal Agency Safety Programs and Responsibilities (29 U.S.C. § 668).

2. Executive Order 12196, Occupational Safety and Health Programs for Federal Employees, February 26, 1980.

3. 29 CFR Sec. 1960, et seq., Basic Program Elements for Federal Employee Occupational Safety and Health Programs.

a) In addition to OSHA requirements, the contractor shall develop, implement, and execute a safety plan stated in the contract. Such requirements shall be delineated to the contractor by each park unit.

b) All equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed.

c) All operations shall be conducted in accordance with all national and local safety codes, laws, rules, regulations, and OSHA safety requirements.

d. When conducting services operations near or adjacent to roadways all employees shall wear reflective, bright orange or lime garment while conducting operations adjacent to roadways. Garment shall be an orange or lime ANSI/ISEA (International Safety Equipment Association) Class 3 Garment (AVY725SC2) with a minimum of 201 square inches of refectories or high-visibility material.

d) All roads and walkways shall remain open to the public unless approved by the COR. Public ways shall not be encumbered nor subjected to any unusual traffic situations created by reason of operations under The Contract without approval of the COR.

e) On occasion services requested under the contract may require road or lane closures. On such occasions closure will be the responsibility of the contractor. Such closures shall require a minimum of five (5) working days’ notice from the contractor to the COR. Such closures will be subject to rush hour restrictions. Closure of a road or lane without the approval of the COR is prohibited. There shall be no requests for lane closures on the Friday before a Monday Federal holiday and the Wednesday before the Thanksgiving holiday unless an emergency or approved by the COR.

XI. TRAFFIC CONTROL

For roadside work under the contract, the contractor shall provide, erect, and maintain all necessary warning signs to insure the safe flow of traffic, protection of the work area, and the safety of the public. All traffic controls and safety devices shall meet and/or exceed current Manual on Uniform Traffic Control Devices (MUTCD) Federal Highway Administration standards. The following shall be required when working adjacent to roadways:

1. High visibility clothing

2. Warning Signs

3. Traffic cones

4. Flaggers with hand signaling devices or flags (when applicable)

5. Arrow boards

6. Barricades

7. Warning signs shall be removed when work operations have ceased.

XII. GOVERNMENT FURNISHED PROPERTY AND SERVICES

1. The Government will not be providing any overnight vehicle or equipment storage areas, facilities or structures, equipment, systems, or training.

2. The Government will provide the contractor with access to government or NPS–related policies and management guidelines, asset inventories, files/records and maps as necessary to meet the requirements of the contract as it relates to performance of turf maintenance activities.

XIII. ACCEPTANCE, MEASUREMENT AND PAYMENT

1. The Contractor shall prepare and submit an invoice to The Contracting Officer Representative, for payment. The contractor shall include copies of his work log with approval to pay signed by the COR. The amount to be paid will be based on the actual items completed and accepted. Quantities so measured will be paid for at the specified price. Invoices must reflect the same unit description, and unit price as the original proposal.

2. Provide line item cost for materials and labor on all invoices submitted for payment. All invoices will be paid via IPP (Invoice Processing Platform).

3. Provide an additional copy of all invoices and signed check-sheets, to the COR. This will speed up the approval and payment of invoices.

XIV. PERIOD OF PERFORMANCE

The Period of Performance is Date of award – 05/31/2023.

XV. HOURS OF OPERATION

Tree services shall be conducted between the hours of 6:30 am – 4:00 pm ET, Monday – Friday, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor will not be reimbursed when the Government facility is closed for the above reasons unless emergency services are requested. After hours work or weekend work will be considered on a case-by-case basis and requires approval from the COR. Requests shall be made at least 48 hours in advance of proposed work.

No Work shall take place on the following Federal Holidays:

New Year’s Day – January 1st Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th (Observed on June 20th) Independence Day – July 4th Labor Day – First Monday in September Columbus Day – Second Monday in October Veteran’s Day – November 11th Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th image1.png

File details come from the government source that posted it. Updated .