This Statement of Work outlines requirements for vista clearing and herbicide application services within Shenandoah National Park. The contractor will be responsible for cutting trees and shrubs under 6 inches in diameter to maintain viewsheds at designated overlooks and ride-by vistas. Work will include removing cut vegetation from slopes and chipping it for disposal at approved locations. If initial herbicide treatment of cut stumps does not prevent regrowth, the contractor must perform follow-up foliar spraying using approved herbicides. The contract will have a one-year base period of performance with four optional one-year extensions. The solicitation number for this requirement is 140P4223R0031 and was issued by the National Park Service Northeast Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SHEN_Vista_Management_Bid_Schedule_0001.xlsx | XLSX spreadsheet | |
| Sol_140P4223R0031_Amd_0001.pdf | ||
| B08_Attachment_3_-_Q_A_Document.xlsx | XLSX spreadsheet | |
| Combined_Synopsis___Solicitation_FINAL.docx | DOCX document | |
| B08_Attachment_1_-_Price_Schedule.xls | XLS spreadsheet | |
| B08_Attachment_4_-_Wage_Determination_WD_2015-4283_Dated_5_10_2023.pdf | ||
| Sol_140P4223R0031.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
VISTA MANAGEMENT WITHIN SHENANDOAH NATIONAL PARK
April 10, 2023
Vista Management at Shenandoah National Park Base Bid: PMIS 236579 Option Year 1: PMIS 244780 Option Year 2: PMIS 305795 Option Year 3: PMIS 320894 Option Year 4: PMIS 320895
SECTION A: SPECIFICATIONS
1. PROJECT DESCRIPTION AND LOCATION
Description. This contract is for furnishing of equipment and labor necessary to perform Vista Clearing Operation activities in accordance with these specifications. Unless otherwise provided the contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the work in accordance with this Statement of Work (SOW). Contractor will proceed and execute the work under their own direction to accomplish the work in accordance with the scope and contract provisions. Period of performance shall be 12 months from Notice to Proceed for base bid and each option year.
Location. Vista clearing shall be conducted at Shenandoah National Park within Mile Post 0-105 along Skyline Drive. Vista work is performed at designated Overlooks and Ride-By-Vista’s and are identified by either name or mile post.
Park points of contact and COR will be:
CO: Cole Johnson COR: Tim Heiston Tim_heiston@nps.gov – (540) 999-3500 Ext 3253
2. SPECIFICATIONS
The following Specifications are applicable to this contract and are physically included in this section:
A: National Park Service staff will identify all vista’s to be cut and will be delineated with flagging which marks the perimeter boundaries that crews work within. Acreage shall be based on current records managed within NPS Facility Management System Software of identified vistas to be cleared. Work primarily consists of slash cutting or felling of small trees and shrubs with a typical Diameter at Breast Height (DBH) of 6 inch or less. All trees and shrubs shall be removed from the slope and chipped into a chipper box then transported to a location designated by the NPS (identified below). Stumps that remain shall not exceed a height of 4 inches and shall be parallel to the ground; no pointed stumps will be accepted. Stumps shall be treated with an approved herbicide that will eliminate regrowth once cutting has been completed; all stumps shall be marked with a dye to eliminate missed trees. When herbicide application occurs, contractor shall have a Virginia certified Registered Technician or Certified Right of Way Applicator onsite.
The following locations are identified for placement of chippings:
Piney River Boneyard is located along Skyline drive at mile post 21.8.
Big Meadows Boneyard is located approximately 1 mile off the Skyline Drive at mile post 51.3. on Rapidan Fire Road “Camp 3” Boneyard is located along Skyline Drive at mile 61.6.
B: If initial herbicide treatment is unsuccessful and does not show adequate die back, resprouting and or growth of invasives occur, a foliar spray shall be applied. NPS Staff will identify the need for the foliar spray based on a percentage of success within previously treated areas. Only approved herbicides (see appendix A) will be used, and adjuvants should be used to minimize drift and facilitate penetration. All spraying shall be directed by a licensed Registered Technician or Certified Right of Way Applicator licensed in the state of Virginia.
3. PERFORMANCE REQUIREMENTS
· Trees and saplings that are cut shall be removed from the viewshed and chipped and placed in an approved location from the park.
· Contractor shall ensure all herbicide mixes are approved prior to any application by NPS COR.
· Contractor shall apply herbicide based upon VADACS Standards and regulations and product labeling.
· Contractor shall replace or repair any damaged assets including but not limited to rockwalls, asphalt pavement, trees or shrubs listed in “vegetation to save”, etc. at no additional cost to the government.
· When foliar spray is required, sprayers will need to provide a 5 foot buffer around each tree and shrub listed under “vegetation to save” or anything marked with flagging by NPS staff.
Vegetation to save:
Bear Oak - Quercus ilicifolia Blueberries / Huckleberries - Vaccinium spp. / Gaylussacia spp.
Coralberry - Symphorocarpus orbiculatus Elderberry - Sambucus spp.
Flowering raspberry vines - Rubus odoratus Goldenrods / Asters - Solidago / Aster Grapes - Vitis spp.
Hazelnut - Corylus americana Milkweed - Asclepias spp.
Mountain Laurel - Kalmia latifolia Ninebark - Physocarpus opulifolius Raspberry / Blackberry - Rubus spp.
Staghorn sumac -Rhus typhina Virginia creeper - Parthenocissus quinquefolius Wild Hydrangea - Hydrangea arborescens Witch Hazel - Hamamelis virginiana
Vegetation to kill:
Black birch - Betula lenta Black locust - Robinia pseudoacacia Cherries - Prunus spp.
Chestnuts - Castanea dentata Elms - Ulmus spp.
Maples - Acer spp.
Oaks - Quercus spp.
Oriental bittersweet - Celastrus orbiculatus Princess tree - Paulownia tomentosa Tree-of-heaven - Ailanthus altissima
SECTION C: EQUIPMENT
Furnish and operate equipment with such auxiliary attachments, as are usually needed for efficient operation of the equipment. Keep the equipment in good repair and capable of continuous operation. Contractor shall operate and maintain all vehicles and equipment according to State Department of Transportation laws and regulations.
SECTION D. NOXIOUS WEED CONTROL
Noxious weeds are defined as any exotic plant species established or that may be introduced in the State which may render land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the State Department of Agriculture, or by the County Weed Management District, or by other appropriate agencies having jurisdiction. To help stop the spread of weed seeds, the Contractor shall wash all equipment and support vehicles prior to entering the park. The equipment and support vehicles shall be washed with a pressure washer that can produce enough water force to thoroughly remove organic and mineral debris from the machine. Before moving the equipment to the jobsite, it shall be inspected and approved by the Contracting Officer Representative or NPS designated representative.
The COR will direct activities in areas that require rare plant protection and invasive species avoidance and will provide maps as needed or advise crews when near specified locations.
SECTION E: LABOR
The contractor shall provide all labor, expertise, and supervision required to execute the contract.
Licensures and Certifications Contractor personnel shall be led or instructed by a licensed/certified Arborist to accomplish work identified within this Statement of Work.
SECTION F: SAFETY
All necessary equipment will be provided by the contractor - Chainsaws, PPE (Chainsaw Chaps, Safety Glasses, Steel Toed boots with aggressive lugged soles, Gloves, Helmets, Hearing Protection), etc. - shall meet industry standards for chainsaw operations.
SECTION G: EROSION CONTROL
During all operations under this contract, the Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources.
SECTION H: DISPOSAL OF WASTE AND DEBRIS
All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations shall be collected and stored in a sanitary, nuisance-free manner and disposed of in a State-approved sanitary landfill or as approved by the Contracting Officer. Oil from crankcases or gear boxes, equipment waste, spilled or excess fuel shall be placed in containers and removed from the work site and disposed of as approved and required by Federal, State and Local laws.
SECTION I: PARK ACCESS & OPERATIONS
A standard workday operates during park business hours, from 0700 to 1700. Any deviations from the standard workday must be approved in writing from the Contracting Officer. A standard work week is 5 days, Monday thru Friday. No work will be conducted on the weekends or National holidays. Any deviations from the standard work week must be approved in writing from the Contracting Officer.
36 CFR §4.11 - VEHICLE LOAD, WEIGHT AND SIZE LIMITS
(a)The following load, weight and size limits, which are more restrictive than State law, apply to the roads indicated under the terms and conditions, and/or under permit as noted:
| • | Vehicles that exceed the loads, weight or size limits specified below are prohibited from travel on Park roads without a permit. |
| • | When vehicle or vehicle combination gross weight exceeds 40,000 lbs. between May 1 to November 30 (inclusive) of each year. |
| • | When vehicle or vehicle combination gross weight exceeds 20,000 lbs. during the period of December 1 to April 30 (inclusive) of each year. |
| • | When road condition signing at the various entrances to Shenandoah National Park indicate weight restrictions which are less than the gross combined vehicle weight of vehicle being used. |
| • | When size and/or length of vehicle requires special permit under state regulations. |
| • | Travel through Mary's Rock Tunnel by vehicles over 12 feet 8 inches in height or over 11 feet in width. |
| • | All such requests, other than emergency responses, should be in writing. The application should state: |
| • | The approved Park project which requires this type of equipment. |
| • | Alternatives identified. |
| • | Safety procedures for the protection of visitors, staff and resources |
| • | Liability limits and copies of a current insurance policy |
| • | Generally, applicants should follow the following guidelines in their planning. These guidelines are in compliance with maximum load limits suggested by the Federal Highway Administration for travel on Skyline Drive. However, weather, road, route or other conditions may require lower limits or may permit higher limits. |
Single unit's Gross vehicle weight (lbs.)
2 axles 40,000 3 axles 48,000 4 axles 52,000
Combination Units Gross Vehicle Combination (lbs.)
3 axles 57,000 4 axles 62,000 5 or more axles 66,000
Limits are essential to protect the motor road and appurtenances, to protect resources, and for reasons of visitor safety.
APPENDIX A – HERBICIDES Comment by Johnson, Cole B: As recommended above, please provide a listing of approved herbicides here.
The following list of Herbicides has been previously approved and utilized within the park. However, due to NPS regulations, the contractor shall submit each herbicide they intend to use by filling out the attached Pesticide Use Proposal Form (ie. including estimated acreage totals, estimated amount of product, etc.) for approval, prior to any application. This list shall be submitted at the beginning of each calendar year, regardless of prior year approval.
| *Alligare Triclopyr 3 |
| 81927-13 |
| guardrail brush |
| VDOT |
| Danger! Protect groundwater. Follow label precisely. |
| *Alligare 2, 4-D Amine |
| 81927-13 |
| guardrail brush |
| VDOT |
| Danger! Protect water, surface water, and groundwater. Follow label precisely. |
| Envoy Plus Herbicide |
| 59639-132 |
| exotic grasses |
| SNP NCR staff |
| *Garlon 3A |
| 62719-37 |
| woody invasives |
| SNP, Utility ROWs |
| Signal word: DANGER. Follow PPE and all label instructions precisely. Extreme risk of irreversible eye injury. |
| Garlon 4 |
| 62719-40 |
| woody invasives |
| SNP, |
| Garlon 4 Ultra |
| 62719-527 |
| woody invasives |
| SNP, Utility ROWs |
| Habitat |
| 241-426 |
| truck ramp veg. |
| VDOT |
| Milestone VM |
| 62719-537 |
| woody invasives |
| SNP, Utility ROWs |
| *Pendulum AquaCap |
| 241-416 |
| exotic plants |
| SNP NCR staff |
| Toxic to fish, aquatic invertebrates, birds, and small mammals. |
| *Plateau |
| 241-365 |
| exotic plants |
| SNP NCR staff |
| Prevent drifting. |
| Ranger Pro |
| 524-517 |
| restoration weeds |
| Dominion VA Power |
| Rodeo |
| 62719-324 |
| exotic plants, weeds |
| SNP |
| *Roundup Custom |
| 524-343 |
| truck ramp veg. |
| VDOT |
| Follow label precisely including weed resistant management guidelines. |
| Roundup Pro Concentrate |
| 524-529 |
| exotic plants, weeds |
| SNP |
| *Scythe Herbicide |
| 62719-529 |
| exotic plants |
| SNP NCR staff |
| Signal Word: WARNING. Follow PPE requirements and label precisely. |
| *Vanquish |
| 228-397 |
| veg in truck ramp |
| VDOT |
| Avoid impervious surfaces to avoid groundwater contamination. Spot treatment only and only based on absolute need when other options are exhausted. |
1. HERBICIDE APPLICATIONS
Stump Treatment – 20% solution of triclopyr ester (Garlon 4, Element 4, etc) in basal oil (Loveland Bark Oil is acceptable) which will be applied to the cut surface and down the sides of the stump.
Foliage Spray - Low Volume Foliar Treatment To control susceptible woody plants, mix up to 5% v/v of Garlon 4 Ultra in water and apply 10 to 100 gallons of finished spray. The spray concentration of Garlon 4 Ultra and total spray volume per acre should be adjusted according to the size and density of target woody plants and kind of spray equipment used. With low volume sprays, use sufficient spray volume to obtain uniform coverage of target plants including the surfaces of all foliage, stems, and root collars. For best results, a surfactant and drift control should be added to all spray mixtures. To minimize spray drift, select the minimum spray pressure that provides adequate plant coverage without forming a mist and direct sprays no higher than the top of the target plants. Use a drift control additive cleared for application to growing crops to reduce spray drift.
Performance Work Scope – Vista Management Within SHEN - April 4, 2023 image1.png