B.08.02 Solicitation W912EF24Q0077.pdf

PDF 1010 KB Posted

Attached to
HQ Window Cleaning Services Federal contract opportunity
Solicitation number
W912EF24Q0077
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This document is a solicitation (Solicitation Number W912EF24Q0077) issued by the U.S. Army Corps of Engineers Engineering District Walla Walla for HQ Window Cleaning Services. The contractor shall provide non-personal services for twice-yearly interior and exterior window cleaning of the Walla Walla District headquarters building, except for the atrium skylight. The contract will be a fixed-price contract with a base year from June 1, 2024 to May 31, 2025 and four one-year option periods. Offerors must be registered in SAM.gov and submit a price quote, completed representations and certifications, and other required documents by the due date of May 17, 2024. The government will award a single contract to the responsible offeror meeting all requirements and representing the best value based on price. The performance work statement provides detailed requirements for the window cleaning services, including acceptable quality levels and inspection methods.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912EF24Q0077 02-May-2024

b. TELEPHONE NUMBER

509-527-7200

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 17 May 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MARY L SEINER

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USAED, WALLA WALLA - CONTRACTING DIV.

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 960563 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ARMY CORPS OF ENGINEERS

BLANK

A&E COORDINATOR 201 NORTH THIRD AVE

WALLA WALLA WA 99362-1876

TEL: 509-527-7219 FAX:

509-527-7802FAX:

TEL: 509-527-7200 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$22,000,000

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF78

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

APR 24

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO OFFERORS

BIDDER INQUIRY:

Bidder/Offeror Solicitation Questions:

All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a website that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at (https://www.projnet.org)

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of the comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

TIMING OF BIDDER INQUIRIES: Bidders are encouraged to submit their bidder inquiries promptly. The Government will make every effort to answer all bidder inquiries; however, the closer to the solicitation due date an inquiry is received, the less likely it is that a timely response can be provided.

The Bidder Inquiry Key is: E4GJX7-36Z5JE

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be use from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for Entering Questions:

1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit" a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public”.

c.) Discipline: This is where you select who this question should be directed to. Example, if the question is about an electrical drawing or specification select: “Electrical” from the pull-down list.

d.) Sheet. Enter the sheet number of the drawing you are asking about.

e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about.

f.) Specification. Enter the Specification number and paragraph number.

g.) File. Use this if you are going to attach a pdf file.

h.) Question. Enter your question here.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk at ProjNet: Public User,

(833) 389-1097 or 217-367-3273, which operates from 8AM to 5PM (Central US time zone). Bidder inquiry help questions can also be emailed to the helpdesk at staff@projnet.info

Offerors are cautioned to clearly print prices for all line items. Be especially careful placing decimal points, as a mistake in your offer may render it unresponsive. Your quote must be valid for 30 calendar days after the due date specified for receipt of quotations. Please include shipping costs in the quoted price of each item.

Registration at www.sam.gov is required. If not registered, please do so. Step-by-step help information on how to register is detailed on the website, along with frequently asked questions (FAQs). Lack of registration in the SAM database may make an offeror ineligible for award.

Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required for the GSA Federal Service Desk (FSD, https://www.fsd.gov) to activate the entity's registration. Both Federal Assistance entities and all non-Federal entities must mail the original, signed copy of the notarized letter to the Federal Service Desk. Failure to do so within 30 days of activation may result in the registration no longer being active. Mail the completed, signed, notarized letter to:

FEDERAL SERVICE DESK

ATTN: SAM.GOV REGISTRATION PROCESSING

460 INDUSTRIAL BLVD

LONDON, KY 40741-7285

UNITED STATES OF AMERICA

Completion of the required FAR 52.212-3 Alt. I, Offeror Representations and Certifications – Commercial Products and Commercial Services is required. When you complete your SAM registration, the link to complete your Reps and Certs is also available. Please do not hesitate to contact me or the SAM web site if you need assistance or have questions.

In accordance with FAR 52.229-3 Federal, State, and Local Taxes, and per Title 4 of the US Code 104-107, the Government is exempt from paying local and state taxes. Exempt Tax Identification Number 91-0828090.

General Contract Information:

Delivery Date________________________________________________

Offeror’s Name (Printed) _________________________________________

Offeror’s Contact Telephone Number_______________________________

Offeror’s Email Address___________________________________________

Federal Tax Identification No. ____________________________________________

CAGE Code ________________ Unique Entity ID ______________________________

Total Contract Amount ______________________________________

Is your company registered on-line in SAM (www.sam.gov)? YES NO

To ensure receipt of your quote, please send to the attention of Mary Seiner at:

Email: Mary.L.Seiner@usace.army.mil

ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES

Submission of Price Quote – Contractor shall submit the following in 1 copy:

1. Signed and dated Standard Form 1449 (Solicitation / Contract / Order for Commercial Items).

2. Signed and dated Standard Form 30, if applicable, for any Amendments to the Solicitation

3. Completed schedule (pricing information) for all line items listed in the solicitation / amendments.

4. Completed Clause 52.212-3 and Alt I, “Offeror Representations and Certifications—Commercial Products and Commercial Services”.

As noted above.

5. Descriptive Materials (brochures, illustrations, drawings, data sheets, etc.) must be submitted which will allow the Contracting Officer to determine, without discussion with the offeror, whether the products being offered meets all of the required specifications. Submittals shall include copies of manufactures catalog cut sheet, specification sheets, material certifications, and warranty.

BASIS FOR AWARD

The Government will award one contract resulting from this solicitation in accordance with FAR 13.106 to the responsible offeror meeting or exceeding all solicitation requirements and representing the best value based on price.

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Walla Walla District Headquarters Window Cleaning Services

30 April 2024

Part 1 General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Introduction: This is fixed price contract for the cleaning of the US Army Corps of Engineers Walla Walla District headquarters building. Window washing will be scheduled for two washes per year for the inside and outside of the exterior windows of the building, with the exception of the atrium skylight. Interior windows of the building on office doors and walls, except for the lobby’s entry door and interior sliding door, are to be excluded in the window cleaning services.

1.2 Background: RESERVED

1.3. Scope: The contractor shall provide non-personal service(s). The contractor must provide all personnel, equipment, transportation, tools, materials, supervision, and other items necessary to perform interior and exterior window cleaning as defined in this Performance Work Statement (PWS) and associated contract documents, except for those specified in Part 3 Government Property and Service. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.

1.4 Objectives: The objective of this contract is to provide Walla Walla District HQ interior and exterior window cleanings on a biannual basis. The period of performance for this contract will be:

Base Year: 1 June 2024 through 31 May 2025 Option Year One: 1 June 2025 through 31 May 2026 Option Year Two: 1 June 2026 through 31 May 2027 Option Year Three: 1 June 2027 through 31 May 2028 Option Year Four: 1 June 2028 through 31 May 2029

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The Contractor’s existing quality assurance system shall be utilized in accordance with FAR 12.208.

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the

Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g., deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following

Monday, respectively.

New Year’s Day January 1st M.L.K. Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in Nov Christmas Day December 25th

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0600-1800, Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0600 to 1800, Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0600-1800, Monday through Friday with the exception of when the Government facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall always maintain an adequate workforce, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

1.5.5 Training Holidays: RESERVED

1.5.6 Place of Performance: The location of the service is the United States Army Corps of Engineers (USACE), Walla Walla District Headquarters (HQ) building at 201 N. Third Avenue, Walla Walla, WA 99362-1876. This location will from here be referred as “District HQ”.

1.6.1 Security Program: RESERVED

1.6.2 Personnel Security Clearance Requirements: RESERVED

1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings, and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

1.6.3.1 Installation Pass Log: The Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 3 calendar days after contract award (Deliverable #2). The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log (Deliverable #3).

1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 3 calendar days (Deliverable #4).

1.6.3.4 Common Access Cards (CAC) and CAC Log: RESERVED

1.6.4 Background Checks: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

1.6.4.1 U.S. Citizen: The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within 3 days of receipt by the Contractor, identifying such with the appropriate contract number (Deliverable #5). The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within 1 day of receipt by the Contractor, identifying such with the appropriate contract number (Deliverable #6). When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.

1.6.4.2 Local Nationals and Third Country Nationals: RESERVED

1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).

1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.

1.7 Key Control: RESERVED

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting

Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The following personnel are considered key personnel by the Government: Contract Manager, Alternate Contract Manager, Quality Control Manager. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Contract Manager, who shall act for the Contractor when the Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than during the post-award meeting (Deliverable #7). Acceptance of the CV by the Contracting Officer is required before these individuals are permitted to perform any task on this contract. The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 0700-1600, Monday through Friday. Qualifications for all key personnel are listed below:

a. Contract Manager and Alternate Contract Manager: The CV provided by the Contract Manager and Alternate Contract Manager must demonstrate experience within the past 5 years working as a Program Manager or Contract Manager.

b. Quality Control Manager: The Quality Control Manager must demonstrate experience within the past 5 years working as a Quality Control Manager.

c. Special Qualifications: The Contractor will ensure that employees have the training necessary to perform work that they are assigned.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.11.1 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27- 715).

1.12 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.13 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Deliverable #8). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.14 Safety: The following provides information pertaining to Safety and Accident Prevention:

1.14.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236- 13, Accident Prevention (November 1991), the references contained therein (e.g., U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:

(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the

Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Deliverable #9). Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).

(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen

(15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and

1.14.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.

1.14.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than 5 days (Deliverable #10) that such notifications were made.

1.15 Environmental Compliance: The following provides information on Environmental Compliance.

The contractor must instruct employees in energy conservation practices. The contractor must be responsible for performing the work of this contract in a way that does not waste energy, including but not limited to, turning off lighting when not in use.

1.15.1 Environmental Compliance Plan and Program:

The Contractor must establish systems and controls to minimize use of hazardous materials and generation of hazardous wastes, maximize recycling of materials and comply with local, state, and Federal guidelines for hazardous material and waste storage and disposal. The Contractor will furnish the Government with copies of all Material Safety Data Sheets (MSDS) prior to using such chemicals in Government facilities.

The Contractor will dispose of all waste and cleaning solutions generated by this contract per state and federal regulations. The Contractor must follow manufacturer’s warnings and instructions in the mixing and use of all chemicals in the execution of this contract.

1.16 Required Training: The following provides information on training requirements.

1.16.3 Antiterrorism (AT) Level I Training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training (Deliverable #11). Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 5 days after completion of the training (Deliverable #12).

1.16.2 OPSEC Training: RESERVED

1.16.3 iWATCH Training: 1.16.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 15 days after the contract is awarded and within 5 days after new employees commence contract performance, with verification reported to the COR within 20 days after the contract is awarded and within 10 days after new employees commence contract performance:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.a spx

1.16.4 Information Assurance (IA) Training: RESERVED

1.16.5 Personally Identifiable Information (PII: RESERVED

1.17 Notice to Proceed: RESERVED

1.18 Government Property and Services: RESERVED

PART 2

DEFINITIONS & ACRONYMS

2 Definitions and Acronyms

2.2 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government.

Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line-item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government- furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government- developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC).

The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Workday - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.3 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property

HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3.1. General: The government will not provide the facilities, equipment, materials, and/or services. All items, including but not limited to information, tools, supplies, materials, equipment, vehicles, and utilities, required to perform the services of this contract, to the quality levels established in this contract, must be provided by the Contractor at the Contractor’s expense.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: All items, including but not limited to information, tools, supplies, materials, equipment, vehicles, and utilities, required to perform the services of this contract, to the quality levels established in this contract, must be provided by the Contractor at the Contractor’s expense.

PART 5

SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services for window washing. The Contractor will be required to furnish all necessary labor, equipment, tools, and materials for cleaning the inside and outside of the exterior windows of the building, with the exception of the atrium skylight. Interior windows of the building on office doors and walls, except for the lobby’s entry door and interior sliding door, are to be excluded in the window cleaning services.

Washing shall be both inside and outside and shall be left clean. Glass is clean when all window surfaces are without streaks, film, mineral deposits, hard water stains and have a uniform bright appearance. Windows shall be cleaned in such a manner as to cause a minimum amount of inconvenience and/or disturbance to building occupants. Work shall be subject to inspection and approval of the COR. Work shall be performed Monday through Friday between 0600-1800 Pacific Time. Window cleanings shall be conducted twice annually within the base year and option years as follows:

Base Year:

- Between July 1, 2024 and August 1, 2024

- Between April 15, 2025 and May 15, 2025

Option Year 1:

- Between September 15, 2025 and October 15, 2025

- Between April 15, 2026 and May 15, 2026

Option Year 2:

- Between September 15, 2026 and October 15, 2026

- Between April 15, 2027 and May 15, 2027

Option Year 3:

- Between September 15, 2027 and October 15, 2027

- Between April 15, 2028 and May 15, 2028

Option Year 4:

- Between September 15, 2028 and October 15, 2028

- Between April 15, 2029 and May 15, 2029

(a) STD: Work performed shall be once in base year, twice annually in option years, and during business hours. AQL: Pass or Fail

5.2 Tasks: Tasks consist of the following:

5.2.1 Window Washing

5.2.2 Inside of Exterior Windows: Contractor shall clean the inside of exterior windows, the lobby entry door, and the lobby interior sliding door, except for the atrium skylight windows.

Glass washing shall be done with cleaning agents and necessary equipment to remove all dirt, grease, or stains, and shall be left dry. Such cleaning agents are not to be injurious to painted, varnished, or building surfaces. All work shall be done in a professional manner. Premises in the vicinity shall be left clean. Contractor is to clean excess cleaning solution off window ledges and sills.

(a) STD: Glass is clean when glass surfaces are without streaks, film, mineral deposits, hard water stains and have a uniform bright appearance.

AQL: 100% Compliant

(b) STD: Cleaning agents are unharmful to painted, varnished, or building surfaces.

(c) STD: Contractors will be professional and leave the vicinity clean.

5.2.3 Exterior surfaces: Contractor shall clean all exterior windows and doors except for the atrium skylight windows. All exterior aluminum surrounding windows and structural glass shall be cleaned with a solution, necessary to remove all dirt, grease, or stains, that is not injurious to the finish.

(a) STD: Glass and exterior surfaces are without streaks, film, mineral deposits, hard water stains with a bright uniform appearance.

AQL: 95% Compliant

(b) STD: Exterior aluminum surrounding glass will be cleaned with a solution that is not injurious to the finish.

5.2.4 Work Completion: When window washing has begun on the facility, the Contractor shall finish all requirements within five days, excluding District HQ closures outlined in PWS or due to inclement weather.

(a) STD: Work to be completed within five days except for District HQ closures as outlined in PWS or due to inclement weather.

AQL: Pass or Fail

5.3 Service Contract Reporting

5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Walla Walla District HQ via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address: www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.

Steps for Submitting a Service Contract Report (SCR)

1. Go to www.sam.gov and log in.

2. Select Entity Registrations and then select Service Contract Reporting.

3. SAM displays your entities which have service contracts and meet the reporting criteria.

Select View by entity to see the service contracts for each entity.

4. Next, select Add for the service contract against which you want to create a Service

Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.

5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:

Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).

Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.

6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.

7. When you are ready to submit the report, select Submit.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .