Awning Replacement SOW Charles Sexton 2025.pdf

PDF 120 KB Posted

Attached to
USCGC Carl Sexton Replacement Awning Federal contract opportunity
Solicitation number
13908PR250000019
Issued by
Department of Homeland Security US Coast Guard

About this file

This Scope of Work (SOW) details canvas awning replacement requirements for the USCGC Charles Sexton, a U.S. Coast Guard vessel located in Key West, Florida. The contractor must remove existing canvas covers from the 01 Deck and Fantail, inspect and clean the aluminum frame, remove corrosion, apply an outdoor protectant, and install new color-matched canvas with proper tensioning. The work includes handling potential interferences like GPS/radio antennas and screen panels, providing necessary access equipment, and ensuring all protective measures are implemented.

The project is scheduled during the vessel's inport availability from 12 June 2025 to 03 July 2025, with work to be performed at USCG Sector Key West. The contractor will be responsible for removing and disposing of existing materials, conducting a visual inspection of support structures, documenting any discrepancies, and replacing disturbed mounting hardware. All chemicals used must have current Safety Data Sheets (SDS) provided for ship records. The point of contact is BM1 Solomon Stapleton, and the work location is 100 Trumbo Pt. Road, Key West, FL 33040.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC Carl Sexton Replacement Awning, newest first.
File Type Posted
15-4543.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Canvas Awning Replacement Clean, Inspect, and Coat Aluminum Frame

On CGC CHARLES SEXTON

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew the canvas awnings on the 01 Deck and the Fantail. In addition, to inspect, clean and coat the installed aluminum frame. This work is to be performed on the Coast Guard Cutter Charles Sexton during the scheduled inport period.

1.2 Government-furnished property.

None

2. REFERENCES

2.1 Coast Guard Drawings.

Coast Guard Drawing 154 WPC-613-201, Rev C, Rigging & Covers A&D

2.2 Coast Guard Publications.

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

2.3 Other References.

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. None.

3.1.2 Tech Rep. Not applicable

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Any disturbed mounting hardware shall be replaced with new. Known interferences include, but are not limited to the following:

GPS/Radio Antennas

Screen Panels

3.1.5 Ladders, Scaffolding, Man Lift. The contractor shall provide all required equipment for access to the awnings for removal and installation.

3.1.6 Canvas Removal. The contractor shall remove existing canvas covers and lacing and remove from property for disposal.

3.1.7 Awning Frame Inspection. The contractor shall conduct a visual inspection of all awning support structures and mounting hardware. Any discrepancies shall be documented and a proposed repair plan provided via CFR to KO. Any disturbed mounting hardware shall be replaced with new.

3.1.8 Awning Piping Cleaning and Protectant Application. The contractor shall remove all visible corrosion from existing awning frame using chemical and/or mechanical methods and coat the exposed aluminum with an outdoor protectant. Any chemical applied shall have current SDS provided for ships records.

3.1.9 Awning Installation. The contractor shall install new color matched to existing awning, lacing and any required mounting hardware. Canvas shall be tensioned to ensure a tight application.

4. NOTES

4.1 This Scope of Work was generated by:

USCGC CHARLES SEXTON

100 Trumbo Pt. Rd.

Key West, FL, 33040

(305) 432-7419

4.2 The following is the U.S. Coast Guard vessel that the work is to be performed on and the availability for installation:

4.2.1

USCGC CHARLES SEXTON

100 Trumbo Pt. Rd.

Key West, FL, 33040

(305) 432-7419

Expected installation dates are during the vessel’s inport availability, 12 Jun 2025 – 03 Jul 2025.

POC: BM1 Solomon Stapleton

Work Location: USCG Sector Key West, 100 Trumbo Pt. Road, Key West, FL 33040.