ATTH D QASP.docx

DOCX document 33 KB Posted

Attached to
J065--Preventive maintenance services for sterilizers Federal contract opportunity
Solicitation number
36C25621Q1820
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

View the file

Other files for this federal contract opportunity

Other files attached to J065--Preventive maintenance services for sterilizers, newest first.
File Type Posted
ATTH C PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
ATTH B LIST OF PAST PERF REF.docx DOCX document
ATTH A WD 2015-4561 Escambia Cty FL R15 06-24-2021.pdf PDF
36C25621Q1820.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D – QUALITY ASSURANCE SURVEILLANCE PLAN

36C25621Q1820

QUALITY ASSURANCE SURVEILLANCE PLAN

For: Engineering Service-Biomed

Contract Number: (The Government will enter contract number upon award.)

Contract Description: Preventive Maintenance and Repair Services, Sterilizers

Contractor’s name: (hereafter referred to as the Contractor)

Period of Performance: October 1, 2021 through September 30, 2026 (base plus four option periods)

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Danette Rene’ Impey Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO) 16 Gulf Coast Veterans Health Care System, Biloxi, MS 39531

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Al Celestino

c. Other Key Government Personnel: N/A

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager: (Contractor please provide name here)

b. Other Contractor Personnel: (Contractor please enter name(s) or delete these lines if not applicable.)

Title: (Contractor please enter title(s) or delete these lines if not applicable.)

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Performance Requirements Summary Matrix:

The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

Task
ID
Indicator & Paragraph Number
Standard
Acceptable Quality Level
Method of Surveillance

*See below Incentive

Conformance Standards
1
Equipment Functionality (PWS Para. 3)
Contractor shall ensure that equipment functions in conformance with applicable listed standards and specifications.
98%
Validated User/Customer Complaints
Exercise of Option (if any) and Positive Past Performance
Hours of Coverage
2
Contractor Representative Check-In (PWS Para. 4A)
Contractor’s representative shall check in with Biomedical Engineering upon entering facility and shall sign in out of facility with Biomedical Engineering.
100%

Direct Observation

Exercise of Option (if any) and Positive Past Performance

3
Inspections (PWS Para. 4B)
Preventative Maintenance Inspections will be performed semi-annually during the months of January and July. Inspections will be scheduled at least 2 weeks in advance with Biomedical Engineering.
100%

Direct Observation & Analysis of Contractor’s Reports

Scheduled Maintenance
4
PMI Service (PWS Para. 5A)
Contractor shall perform PMI service to ensure equipment performs IAW Conformance Standards.
100%
5
Documentation (PWS Para. 5C)
Contractor shall furnish all required documentation.
100%

Analysis of Contractor’s Reports Exercise of Option (if any) and Positive Past Performance

Unscheduled Maintenance
6
Response Time (PWS Para. 6C)
Contractor’s FSE shall respond with a phone call within 1 hour of telephone notification 24hrs/day. If problem can’t be corrected via telephone, FSE

shall commence work on-site within 8 normal duty hours. Equipment to be restored to full operating performance within 48 hours.

98%

Parts
7
Use of Parts (PWS Para. 7)
Contractor shall use only new or rebuilt parts, approved by the OEM, and shall not install used parts or those removed from another system without written COTR approval.
100%
Service Manuals
8
Service Manuals (PWS Para. 9)
Contractor shall obtain service manuals, etc. to meet performance requirements.
100%

Analysis of Contractor’s Reports Exercise of Option (if any) and Positive Past Performance

Documentation/Reports
9
Required Documentation/

Reports (PWS Para. 10)

Contractor’s documentation shall contain the minimum requirements as detailed in the contract.
95%

Analysis of Contractor’s Reports Exercise of Option (if any) and Positive Past Performance

Required Reporting Beyond Scope of Contract
10
Services Beyond Terms of the Contract (PWS Para. 13)
Contractor shall immediately notify the CO and COTR in writing of any defects in or repairs to scheduled equipment they consider beyond the terms of the contract.
100%
Competency of Servicing Personnel
11
Competency of Servicing Personnel (PWS Para. 15)
FSE(s) shall have successfully completed a training program for equipment listed in PWS IAW required commercial industry standards.
100%
Identification & Parking
12
Contractor’s Employee Identification & Parking at VAGCVHCS (PWS Para. 17)
Contractor’s FSE’s shall wear visible company identification at all times while on the premises of the VAGCVHCS and will only park in appropriate designated parking areas.
100%

Direct Observation

5. INCENTIVES

The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. PERFORMANCE MANAGEMENT APPROACH. (The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives.)

b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

c. CUSTOMER FEEDBACK. (Elements of validated user complaints. Complaints are then investigated and validated.)

e. 100% INSPECTION. (Evaluates all outcomes.)

f. REPORTING. (Demonstrates whether the contractor meets the stated objectives and/or performance standards.)

g. REVIEWS AND RESOLUTIONS. Meeting with contractor and COR and/or CO to discuss performance evaluation, such as cost, schedules, etc.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Excellent (“E”) = Exceeds Standards Satisfactory (“S”) = Meets Standards Unsatisfactory (“U”) = Fails To Meet Standards

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.

(After award, both the contractor’s Program Manager and the COR shall sign this document.)

Signature – Contractor Program Manager

Signature – Contracting Officer’s Representative

Contract Discrepancy Report

Contract No.
Report No. for this Discrepancy:

Contractor/Manager’s Name:

From: (Name of Project Officer)

Dates

Prepared:

Returned by Contractor:

Action Complete:

Discrepancy or Problem:

Signature of Contracting Officer:

To: (Contracting Officer)

From: (Contractor)

Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)

Signature of Contractor Representative:

Date:

Government Evaluation:

Government Actions:

Close Out

Name
Title
Signature
Date

Contractor Notified

Project Officer

Contracting Officer

File details come from the government source that posted it. Updated .