ATTCH 2 -TE-1 Site and Equipment Images.pdf
PDF 8 MB Posted
- Attached to
- 35 Ton Trane Chiller - B3454 - Goodfellow AFB Federal contract opportunity
- Solicitation number
- FA303021Q0027
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTCH 8 - Questions and Answers - FA303021Q0027.pdf | ||
| Solicitation Amendment FA303021Q00270001 SF 30.pdf | ||
| Solicitation Amendment - FA303021Q00270001.pdf | ||
| ATTCH 3 - Form 66 Submittal Schedule B3454 Air Cooled Chiller Replacement.xlsx | XLSX spreadsheet | |
| Solicitation - FA303021Q0027.pdf | ||
| ATTCH 5 - COVID Policy Letters.PDF | ||
| ATTCH 6 - Base Access Request Template.docx | DOCX document | |
| ATTCH 4 - DOD Contractor Guide.pdf | ||
| ATTCH 1 - SOW_B3454 REPLACE AIR COOLED CHILLER.pdf | ||
| ATTCH 7 - HVAC Chiller System Justification and Approval_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B3454
B3454 Replace Air Cooled Chiller
Remove old chiller pad
New Chiller will be oriented East and West
Width: 6 feet
Remove and replace existing chilled water supply and return lines up to the exterior of B3454.
Retain existing bypass valves for re-installation. Provide new isolation valves (ball valves).
Provide new ¾” ball valve bleed/test ports. Provide new Y strainer in supply. Provide heat tape to new chilled water piping. Provide new insulation and aluminum shielding up to the exterior of B3454. Insulation and aluminum shielding will cover bypass valves. Isolation valves, test ports, and Y valve will be protected with removable insulation.
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
File details come from the government source that posted it. Updated .