Attch_1__SOW__Pest_Control_Service__Tuba_City.pdf

PDF 110 KB Posted

Attached to
PEST CONTROL SERVICES, BLDG. 10 TCBS Federal contract opportunity
Solicitation number
140A2323Q0740
Issued by
Department of the Interior Bureau of Indian Affairs Bureau of Indian Education

About this file

This statement of work outlines pest control services required at the Tuba City Boarding School Facility Building Number 10 in Tuba City, Arizona. The Bureau of Indian Education seeks a licensed pest control contractor to install granular baits, gel baits, insecticidal dust, and rodenticide stations once per month to control insects and rodents throughout the first floor and basement. The contractor must provide all labor, equipment, materials, safety measures, and disposal services to complete the pest control and coordinate activities with facility management. The related federal contract opportunity is solicitation number 140A2323Q0740 to provide these pest control services at the Tuba City Boarding School building over a one year period.

View the file

Other files for this federal contract opportunity

Other files attached to PEST CONTROL SERVICES, BLDG. 10 TCBS, newest first.
File Type Posted
Sol_140A2323Q0740_Amd_0001.pdf PDF
Attch_2__SCA_WD_2015-5465_Coconino_County_AZ__21_July_2023.pdf PDF
Sol_140A2323Q0740.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Pest Control Services, Facility Building Number 10

Tuba City Boarding School Tuba City, Coconino County, Arizona

18 August 2023

1. Summary:

The Bureau of Indian Education (BIE), Tuba City Boarding School Facility Management Office requires a licensed Pest Control Contractor to complete the pest control services at Tuba City Boarding School, Facility Building No. 10, located at Tuba City, Arizona.

2. Scope of Work:

As specified in this Statement of Work (SOW), pest control services shall include: Install as needed granular baits, gel baits and insecticidal dust to control insect harborages and insect population. 40 rodenticide stations. Install 30 tin cat in the interior of the facility building No. 10.

Service is to be completed once per month, with 12 services per year. Pest control services will need to be provided to the first floor and basement of building No. 10.

Technical assistance with the pest control services will be provided by Tuba City Boarding School staff, Facility Management Office. Scheduling of pest control and other technical questions shall be submitted to the Facility Management Office as well as the Contracting Office for review and approval.

3. Contractor is responsible for providing:

3.1. All labor, equipment, materials/supplies, rentals, tools, insurance, safety, security, staging/storage, full time supervision, worker/owner/property protection, and any temporary utilities/hookups that might be required for the performance of the resulting contract.

3.2 Traffic control; fall protection; deliveries; notifications/filings; permits, control measures on dust, noise, contamination; general ground/soil restoration; daily and final site cleanup; housekeeping; trash/debris disposal, etc.

3.3 Any and all damages that may evolve from carelessness, negligence, or irresponsibleness, including accidents to BIA and their tenants’ property, assets, investments, etc.

4. Considerations and Factors:

Proposing contractors are asked to factor in or take into consideration the following as part of their bid/proposals and projected schedules while undertaking this project.

4.1 Coordination and cooperation with the Western Navajo Agency Facility Management Department for people/vehicle traffic, their accesses and exits, control and coordination of noise, odors, vibration, and other distracting or disruptive activities that will impact operations.

4.2 All work shall take place during normal workdays, with no weekend or holiday work unless prior approval is obtained in writing from the Contracting Officer.

5. Provide pest service equipment manufacturer data sheets on all products used.

END OF STATEMENT OF WORK

File details come from the government source that posted it. Updated .