This solicitation is for an F-16 electron tube. Only approved sources L3 Harris, L3 Communications, and Northrop Grumman are eligible for award unless other sources become qualified by meeting manufacturing requirements. Qualification requires notification of intent, facility and equipment certification, data verification, manufacturing and process verification, testing and evaluation, submission of a qualification article, and estimated costs and timelines of $8,600 and 365 days respectively. The solicitation is open to the approved sources for this acquisition. The Defense Logistics Agency Aviation is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_CUI.pdf | ||
| EDL_CUI.pdf | ||
| SPRHA422R0531_______0001.pdf | ||
| FATR_CUI.pdf | ||
| EDR_CUI.pdf | ||
| MQR_CUI.pdf | ||
| SPRHA422R0531.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM: (Portugal) E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY: (Data Manager) H. DATE I. APPROVED BY: (Engineer) J. DATE
Page of Pages
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, AUG 96
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4;
Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FD2020-20-00663 FAT 6150015559783WF
3rd page CDRL
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
xTDP: Off xTM: Off
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
16_REMARKS_Continued: s. Original drawings are not required. If applicable, reproducible stable base copies of unidimensional drawings and master pattern drawings are required. See Block 14.
Page2: 2 of_pages:
Reset:
xtm: Off
1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: Test/Inspection Report
3_SUBTITLE: First Article Test Report
4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B/T
5_CONTRACT_REFERENCE: CLIN for Data
6_REQUIRING_OFFICE: 416 SCMS/GUEAA
7_DID_250_REQ: DD
8_APP_CODE: A
DIST_STATEMENT: B
10_FREQUENCY: OTIME
11_AS_OF_DATE: SEE BLK 16
12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16
13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16
addressee1: 416 SCMS/ draft1:
reg1: 1 repro1:
addressee2: GUEAA draft2:
reg2:
repro2:
addressee3: 6071 Gum LN draft3:
reg3:
repro3:
addressee4: Bldg. 1213 draft4:
reg4:
repro4:
addressee5: Hill AFB, UT draft5:
reg5:
repro5:
addressee6: 84056-5825 draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: SEE BLK 16 draft8:
reg8: 1 repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 reg38t: 2 total_repro: 0
16_REMARKS: NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
NSN: 5960-01-444-8163WF
1. Block 4: Contractor's format is acceptable. Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
d. Other requirements as called out on Engineering Data Requirement (OO-ALC Form 462).
2. Block 9: Distribution Statement, Export Control Warning and Destruction Notice shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on the first sheet of each document and/or Associated Lists.
DISTRIBUTION STATEMENT "B"" Distribution authorized to U.S. Government agencies only. (Test & Evaluation) (Feb 2021). Other requests for this document shall be referred to (416 SCMS/GUEAA, Hill AFB, UT 84056-5825).
17_PRICE_GROUP: NSP
ESTIMATED_TOTAL_PRICE: 0.00
G_PREPARED_BY:
H_DATE: 18 Feb 2021
1_APPROVED_BY:
J_DATE: 18 Feb 2021
Page: 1
2021-02-18T10:54:36-0700
PINNEGAR.STEPHANIE.A.1102660737
2021-02-18T11:43:45-0700
LEFEVRE.STEVEN.R.1231476250
A_CONTRACT_LINE_ITEM_NO: 0001AA
B_EXHIBIT: A
xTDP: Off xTM: Off
OTHER: NDTI
DSYSTEMITEM: Electron Tube
E_CONTRACTPR_NO: FD2020-21-00531
FCONTRACTOR:
16_REMARKS_Continued: EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
3. Blocks 10, 11, 12, 13, 14:
a. For Contractor Testing - submit IAW the current delivery schedule.
b. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the "First Article" item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the "First Article" container, the report shall be enclosed in a paper or plastic envelope.
c. SHIP TO: Non-Accountable Bay Transportation Officer Building 849 West Hill AFB, UT 84056-5999
MARK FOR: 809 MXSS/MXDEB
7278 4th Street (Bldg. 100, Bay D) Hill AFB, UT 84056-5205
NOTE: If report is shipped separate from "First Article" item, send report to "MARK FOR" address listed above.
d. Contractor shall deliver the Test/Inspection Report via e-mail to the following e-mail address: steven.lefevre@us.af.mil
Page2: 2 of_pages: 2
Reset:
ENGINEERING DATA LIST
DATE:
30 JAN 2020
REVISION: 8 *HISTORY*
CAGE:
97942
PAGE:
NSN:
5960014448163WF
DATA TECH:
Pusey, Brian D
END ITEM:
F-16A/B MLU
ORGANIZATION/OFFICE SYMBOL:
429 SCMS GUMACA/
MANUFACTURER NAME:
NORTHROP GRUMMAN SYSTEMS
REFERENCE NUMBER:
588R901H02
NOUN:
ELECTRON TUBE
LINE/
SUB CAGE
ENG DRAWING NUM/ ACCOMP
DOC NUM REV
NR
SHEETS
FURN
CODE
DIST
CODE NOUN REMARKS
L 97942 588R901 E S D TRAVELING, WAVE TUBE, PPM
FCSD.
L 97942 PDS21869 BA S D STD. RQMTS. FOR PURCHASED
ITEMS
L 98747 200733803 D S D LABEL, UNIQUE
IDENTIFICATION (UID)
Pusey, Brian D 30 JAN 2020
W/EO 10A1486-H
NAME: DATE:
L 98747 HILL AFB FORM 462 X ENGR DATA RQMTS
(ATTACHMENT A)
STANDARD ENGINEERING TEXT
Pusey, Brian D 30 JAN 2020
RELEASE OF THIS DATA TO A FOREIGN-OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
NAME: DATE:
C - CLASSIFIED DOCUMENT.
S - FURNISHED WITH SOLICITATION.
M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH
CONTRACT AWARD.
X - DATA SUPPLIED (NOT IN JEDMICS).
R - FURNISHED BY PCO UPON REQUEST.
P - PARTIAL DOCUMENT FURNISHED.
V - VENDOR DRAWING; (NOT PROVIDED).
G - GOV'T DOCUMENT.
O - OTHERS, CONTRACTOR MUST ACQUIRE.
A- DATA NOT AVAILABLE.
FURNISHED METHOD CODE LEGEND:
Page 1 of 1EDL Version 8Generated by PRPS using Jasper Reports on 27 Sep 2021
REV: ENGINEERING DATA REQUIREMENTS
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
TRAVELING WAVE TUBE, PPM FOCUSED, (F-16)
2. PART NUMBER:
3. NATIONAL STOCK NUMBER:
5960-01-444-8163WF
PREPARED BY:
STEVEN LEFEVRE
OFFICE SYMBOL:
416 SCMS/GUEAA
JAN 30, 2020
HILL AFB FORM 462 Page 1 of 3
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED
DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. THE SOURCE/MATERIAL IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCE/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR APPROVAL
BY ENGINEERING.
7. THIS IS AN AIRCRAFT PART. USE THE APPROPRIATE PORTION OF MIL-STD-2000 THAT APPLIES TO AIRCRAFT SOLDERING FOR ALL SOLDERING REQUIREMENTS. *NOTE: J-STD-001 MAY BE USED IN LIEU OF MIL-STD-2000, IF SPECIFICATION MEETS OR
EXCEEDS MIL-STD-2000.
7.1 EFFECTIVE 9 MAY 2005 THE DEPARTMENT OF THE AIR FORCE ISSUED AN AIR WORTHINESS ADVISORY (M-05-01) REGARDING THE USE OF LEAD-FREE SOLDER IN ELECTRICAL AND ELECTRONIC MILITARY PRODUCTS. TO DATE, NO LEAD-FREE SOLDER FORMULATION HAS MATCHED THE RELIABILITY AND PERFORMANCE QUALITIES OF THE STANDARD LEADED SOLDERS. THEREFORE, UNTIL SUCH TIME AS A SUITABLE, RELIABLE LEAD-FREE SOLDER REPLACEMENT IS IDENTIFIED, ALL ELECTRONIC EQUIPMENT SUPPLIERS SHALL CONTINUE TO PROVIDE THE DEPARTMENT OF THE AIR FORCE WITH ITEMS WHICH MEET ALL PERFORMANCE, COMPATIBILITY, AND RELIABILITY STANDARDS PREVIOUSLY ESTABLISHED WITH LEADED SOLDERS.
FAILURE TO DO SO, COULD ADVERSELY IMPACT THE PERFORMANCE AND RELIABILITY OF WEAPON SYSTEMS AFFECTING
NATIONAL SECURITY.
7.2 THE USE OF LEAD-FREE SOLDER OR LEAD-FREE PLATED COMPONENTS IN MILITARY ELECTRONIC PRODUCTS IS CONSIDERED A FLIGHT SAFETY AND NATIONAL SECURITY CONCERN. FOR THIS REASON THE US AIR FORCE WANTS TO BE NOTIFIED WHEN LEAD-FREE COMPONENTS AND MANUFACTURING PROCESSES HAVE BEEN IMPLEMENTED. AS PART OF SATISFACTORY COMPLIANCE WITH THE REQUIREMENTS OF THIS CONTRACT THE US AIR FORCE REQUIRES NOTIFICATION ON A
NO-COST BASIS WHEN ANY OF THE FOLLOWING CONDITIONS EXIST:
1. COMMERCIAL OFF-THE-SHELF (COTS) OR ANY OTHER ELECTRICAL COMPONENTS THAT CONTAIN LEAD-
FREE SOLDER OR LEAD-FREE PLATED COMPONENTS ARE USED IN THE END-ITEM.
2. ANY LEAD-FREE COMPONENT OR PART USED TO MANUFACTURE THE END ITEM THAT IS NOT IDENTIFIED
WITH A SEPARATE PART NUMBER OR DESIGNATION.
7.3 IF NO LEAD-FREE, LEAD-FREE PLATED COTS OR ANY OTHER LEAD-FREE ELECTRICAL OR ELECTRONICS COMPONENTS EXIST IN THE MANUFACTURED END-ITEM, THE CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION OF COMPLIANCE AS A
DELIVERABLE WITH THE CONTRACT.
1. USE INDUSTRY STANDARD IPC-1066, "MARKING, SYMBOLS AND LABELS FOR IDENTIFICATION OF LEAD- FREE AND OTHER REPORTABLE MATERIALS IN LEAD-FREE ASSEMBLIES, COMPONENTS AND DEVICES,"
2. INCLUDE THE PROGRAM ENGINEER'S EVALUATION OF THE PURCHASING/REPAIR ITEM FOR ANY "LEAD- FREE" MILITARY PART(S) IN REFERENCE TO ITS' RELIABILITY, PERFORMANCE AND COMPATIBILITY FOR
THE SYSTEM.
8. UNIQUE IDENTIFICATION (UID) SHALL BE APPLIED PER MIL-STD-130 IAW THE SPECIFICATION 588R901H02; PARAGRAPHS 3.18, 3.19.
9. Counterfeit Prevention Plan (CPP). Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832
HILL AFB FORM 462 Page 2 of 3 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.
10.0. At a minimum, the CPP shall address:
10.1. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
10.2. Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)
10.3. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)
10.4. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each.
(Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)
10.4.1. Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether
HILL AFB FORM 462 Page 3 of 3
100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)
10.5. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat.
4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E)
10.6. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E)
10.7. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref.
AS5553, paragraph 4.1.6, appendix F)
10.8. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, paragraph 4.1.7, appendix G)
10.9. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.
MANUFACTURING QUALIFICATION REQUIREMENTS
NSN: 5960-01-444-8163
P/N: 588R901H02 Noun: Electron Tube Application: F-16 A/B, AN/APG-66, Transmitter
7 Mar 2017 Section C 1/3
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Electron Tube.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Northrop Grumman (97942) drawing 588R901H02. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416th SCMS/GUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes.
e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416th SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 588R901H02. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416th SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 588R901H02. This article shall be subjected to a form, fit, and
P/N: 588R901H02
7 Mar 2017 Section C 2/3 function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within [Enter # of days] days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.
g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $8600.
h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 365 days. This is based on complexity of the Electron Tube and other factors.
i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
P/N: 588R901H02
7 Mar 2017 Section C 3/3
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: NA
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.
g. QWC7: NA
Statement of Work June 2020
PRESERVATION, PACKAGING & MARKING REQUIREMENTS
The contractor shall develop, implement and maintain the preservation, packaging and packing of all items to be delivered under the terms of this contract. Packaging procedures will be established in accordance with AFMCI 24- 201, specifically Paragraph 3.7 and MIL-STD-2073-1, Standard Practice for Military Packaging, Packaging requirements are identified in the AFMC Form 158, Packaging Requirements submitted by the responsible packaging specialist. All “markings and labeling” of shipments shall conform to MIL-STD-129, DoD Standard Practice, Military Marking for Shipment and Storage. The contractor shall affix a completed DD Form 1574, Serviceable Tag-Materiel or DD Form 1574-1, Serviceable Label- Materiel to each unit pack or intermediate container and prime outer container(s). The tag or label will indicate the condition(s) of the materiel and to identify the individual article or contents, bundle, container to which they are securely attached.
INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES
(ISPM 15) REQUIREMENTS
The contractor shall use the wood packaging material regulation for international trade which describes Phytosanitary (including treatments) that have been approved for wood packaging material and provides for the approval of new or revised treatments. Use the latest revision of (ISPM 15), and the following statement complies with the United Nations-implemented restrictions on wood packaging material (WPM).
“This requirement is specifically concerned with invasive species such as pinewood nematode. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. The statement below cites the requirements in detail and covers lumber for building containers and pallets used for deliveries resulting in worldwide shipments (direct vendor deliveries, Air Logistics complex (ALC), Container Consolidation Points (CCP), Aerial Ports, Water Ports, or other DoD installations).
ELECTROSTATIC MATERIAL (When Applicable) The Contractor shall apply provisions of MIL-STD-2073-1, when identifying all solid state devices and modules containing diodes, translators, integrated circuits and/or other microelectronic components sensitive to electrostatic forces. All such items shall be packaged IAW MIL- STD-2073-1 using electrostatic free barrier materials and shall clearly bear “Electrostatic Sensitive Device” labels IAW MIL-STD-129, Department of Defense Standard Practice Military Marking for Shipment and Storage.
PALLETIZED UNIT LOADS
The Contractor shall apply provisions and methods of MIL-STD-147, Palletized Unit Loads to contracts requiring the preparation and shipment of bonded palletized unit loads for DoD facilities when applicable.
SPECIALIZED SHIPPING CONTAINERS
The contractor shall apply provisions of MIL-STD-648, Department of Defense Design Criteria Standard, Specialized Shipping Containers. This standard establishes general design guidelines and associated tests for specialized shipping containers used by the Department of Defense. Definitive requirements for specific containers will be defined by the individual specification, acquisition, or task order. This standard is intended to be used as the basic reference document in all specifications and standards prescribing performance requirements to be applied to a specialized shipping container. Compliance with this intent is expected through normal application of the specification or standard preparation and revision processes.
Statement of Work (Cont)
HAZARDOUS MATERIALS (When Applicable) The contractor shall ensure Hazardous shipments comply with International Civil Aviation Organization (ICAO), U.S. Code of Federal Regulations (CFR) Title 49, International Air Transport Association (IATA) Dangerous Goods Regulation, International Maritime Dangerous Goods Code (IMDG, Annex 1), and AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipments. Packaging shall meet “DOT specification or a United Nation (UN) specification ” manufactured in accordance with 49 CFR, Part 178 and the final packages assembled IAW 49 CFR, Parts 100-185 as applicable. A Competent Authority Approval (CAA) shall be acquired from the responsible Associate Administrator or other designated Department official to perform a function requiring prior consent under the Hazardous Material Regulation (HMR). Package(s) shall be marked IAW MIL-STD-129, DoD Standard Practice, Military Marking for Shipment and Storage.
The contractor shall affix a completed DD Form 1574, Serviceable Tag-Materiel or DD Form 1574-1, Serviceable Label- Materiel to each unit pack or intermediate container and prime outer container(s). The tag or label will indicate the condition(s) of the materiel and to identify the individual article or contents, bundle, container to which they are securely attached. If a symbol is used to represent the manufacturer or the approval agency certifying compliance with 49 CFR 178, subparts L and M, the symbol must be registered with the U.S. Department of Transportation. A copy of the Contractor’s Test Report and signed certification that the package configuration meets both CFR and UN requirements shall be made available to the procuring contract office, as required, prior to acceptance or shipment of any portion of the product IAW Contract Data Requirements List (CDRL DI-PACK-81059A) (Reference AFMC Form 158). Safety Data Sheets (SDS) are required for known hazardous items and applicable items shown in FED-STD-313, Tables I and II. The SDS shall have any applicable identification number, such as National Stock Number or Special Item Number. A copy of the SDS shall be mailed or e-mailed no later than five (5) days prior to contractual delivery of items:
FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data
SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM
(SPIRES)
Contractors may request the use of SPIRES website to view item packaging requirements or search for Special Packaging Instruction drawings via the following website: https://spires.wpafb.af.mil/
REUSABLE CONTAINERS
The contractor shall safeguard all received reusable shipping containers that meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets. The contractor shall dispose of and replace unserviceable containers with new containers that meet requirements of the AFMC Form 158.
Contact the Product Support Manager and Administering Contracting Office (ACO) for disposition instructions and replacement when Long Life Reusable Container(s) are received in an unserviceable condition.
https://spires.wpafb.af.mil/
REPORTING DISCREPANCIES
The contractor shall use Web Supply Discrepancy Report (WebSDR) to submit/reply to a Supply Discrepancy Report (SDR), when improperly packed assets are received/shipped in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) from Department of Defense (DoD) components or contractor activities. The contractor shall request a WebSDR account via the following website: https://www.transactionservices.dla.mil/daashome/homepage.asp
(See Defense Logistics Management (DLM) 4000.25-M, Volume 2, Supply Standard and Procedures, Chapter 17, Supply Discrepancy Reporting) http://www.dla.mil/HQ/InformationOperations/DLMS/
Exceptions when no damage has occurred are as follows:
- Items packaged before the current SPI date.
- An alternate pack may be used, provided the prime Air Force Sustainment Complex, Packaging Office at the Air Logistics Complex (ALC) approves and issues a waiver, deviation number, which would be annotated on the exterior container on the lower right hand portion of the identification side of the container.
- In accordance with Technical Order (TO) 00-85B-3, How to Package Air Force Spares, the contractor may substitute the next larger size fast pack, of the type I or type II to ship transportation priorities 1 and 2 shipments as long as there is no decrease in any of the container dimensions without the requirement of a waiver deviation. TO 00- 85B-3, para 4.2 can be accessed via the website:
- https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf
ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions The contractor shall use the ASSIST website to access specification, standards, data item descriptions documents listed in this contract solicitation:
FAR 52-211-2 Availability of Specifications, Standards, and Data Item Descriptions listed in the Acquisition Streamlining and Standardization Information System https://quicksearch.dla.mil/
AFSC
406 SCMS/GULAA
Attn: Keith Restorff
DSN: 777-9192
COMM: 801-777-9192
E-mail: keith.restorff@us.af.mil https://www.transactionservices.dla.mil/daashome/homepage.asp http://www.dla.mil/HQ/InformationOperations/DLMS/ https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf https://quicksearch.dla.mil/%23/
APPLICABLE GOVERNMENT PACKAGING DOCUMENTS
NOTE: UTILIZE THE MOST RECENT REVISION
AFI 24-602V2_AFGM2018-01, Preparation and Movement of Air Force Cargo
AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipments
DLMS 4000.25, Defense Logistics Management Systems, Volume 2, Change 10, Supply Standards and Procedures, Chapter 17, Supply Discrepancy Reporting
DOT Title 29, Occupational Safety and Health Administration, Labor
DOT Title 49, Code of Federal Regulations (49 CFR), Transportation
International Civil Aviation Organization (ICAO) Technical Instructions
International Air Transport Association (IATA) Dangerous Goods Regulation
International Maritime Dangerous Goods (IMDG) Code
ISPM 15, International Standard Phytosanitary Measure Note: Marking Requirements may be found in the American Lumber Standards Committee, Incorporated Wood Packaging Material Enforcement Regulations dated November 07, 2014 and ISPM 15.
MIL-STD-2073-1E, Change 3, Standard Practice, for Military Packaging
MIL-STD-129R, Change 1, Department of Defense Standard Practice Military Marking for Shipment and Storage
MIL-STD-648E, Department of Defense Design Criteria Standard, Specialized Shipping Containers
MIL-STD-147E, Change 1, Palletized Unit Loads
MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) TO 00-85B-3, How to Package Air Force Spares
FED-STD-313E, Federal Standard: Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).
PRESERVATION, PACKAGING & MARKING REQUIREMENTS
INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES
(ISPM 15) REQUIREMENTS
ELECTROSTATIC MATERIAL (When Applicable)
PALLETIZED UNIT LOADS
SPECIALIZED SHIPPING CONTAINERS
Statement of Work (Cont)
HAZARDOUS MATERIALS (When Applicable)
SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM (SPIRES)
REUSABLE CONTAINERS
Statement of Work (Cont)
REPORTING DISCREPANCIES
Exceptions when no damage has occurred are as follows:
ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions
Statement of Work (Cont)
File details come from the government source that posted it. Updated .