Attachment3_Group4_TreeShrubEstablishmentJobsheet.pdf
PDF 4 MB Posted
- Attached to
- 1010304 - Tree Shrub Establishment Federal contract opportunity
- Solicitation number
- 1010304
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01 - Amendment 0001 to RFQ 1010304.pdf | ||
| S01 - SOW.pdf | ||
| Attachment2_Group4_TreeShrubEstablishmentMaps.pdf | ||
| S01 - RFQ 1010304.pdf | ||
| Attachment1_Group4_Tree_planting_GroupMap.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Job Sheet –Tree/Shrub Establishment (612) Revised March 2017
Tree/Shrub Establishment Conservation Practice Job Sheet VT-612
Definition Establishing woody plants by planting seedlings, cuttings, direct seeding or natural regeneration.
Purpose To establish woody plants for forest products, wildlife habitat, long-term erosion control and improvement of water quality, treat waste, reduction of air pollution, sequestration of carbon, energy conservation, to maintain or restore natural genetic diversity and enhance aesthetics.
Where used Establish trees/shrubs on any area where woody plants can be grown.
Operation and maintenance Access by vehicles or equipment during or after tree/ shrub establishment shall be controlled to protect new plants and minimize erosion, compaction and other site impacts. Refer to the standard Access Control (472).
The trees and shrubs will be inspected periodically and protected from adverse impacts including insects, diseases or competing vegetation, fire and damage from livestock or wildlife.
If needed, competing vegetation will be controlled until the woody plants are established.
Noxious weeds will be controlled.Replanting will be required when survival is inadequate.
Supplemental water will be provided as needed.
Criteria Composition of species will be adapted to site conditions and suitable for the planned purpose(s).
Priority will be given to plant materials grown from locally collected seeds.
No plants on the Federal or state noxious or invasive weeds list shall be planted.
Planting or seeding rates will be adequate to accomplish the planned purpose for the site.
Planting dates, and care in handling and planting of the seed, cuttings or seedlings will ensure that planted materials have an acceptable rate of survival.
Bare-root stock shall be planted during the dormant season in the spring after the ground thaws until May 30 as soil moisture and local weather conditions permit.
Only viable, high-quality and adapted planting stock or seed will be used.
A precondition for tree/shrub establishment is appropriately prepared sites. Refer to practice standard Tree/Shrub Site Preparation (490).
Adequate seed sources or advanced reproduction needs to be present or provided for when using natural regeneration to establish a stand.
Specifications Requirements for the site are found within this jobsheet.
See practice standard and Supplemental Specifications for Tree/Shrub Establishment, code 612 and Forest Site Preparation, code 490 for specific requirements.
Tree/Shrub Establishment – Job Sheet VT - 612
For: Farm #:
Field(s): Tract #:
Designed By: Approved By:
Signature:
Date: Date:
Purpose (check all that apply) Forest Products Reduction of Air Pollution
Wildlife Habitat Sequestration of carbon Long-term erosion control Energy Conservation Improvement of Water Quality Maintain or restore natural genetic diversity Waste Treatment Aesthetic enhancement
Other: (Specify)
Type of Planting Planting in Open Areas Natural Regeneration Seeding Interplanting Clearcut Regeneration Interseeding Underplanting
Woody Plant Materials Information - Refer to 612 Specification for more information on care, handling, planting techniques, etc.
See VT NRCS Forestry Technical Note 2 - Vermont Trees and Shrubs for Conservation for plant characteristics.
Field Ac Species/cultivars: Kind of Stock1 :
Total No.
Plants Per acre:
Planting dates: Avg. Spacing2:
Ft X Ft
1 BAreroot, COntainer, CUtting; include size, caliper, height, and age as applicable.
2 Spacing between plants to achieve plants/acre.
Plants/acre = 43,560 (ft2/ac) ÷ [Between-Row Spacing (ft) X In-Row Spacing (ft)}
Temporary Storage and Handling Instructions (Refer to VT Standard and Specification 612) Planting stock that is dormant may be stored temporarily in a cooler or cool, moist, darkened area up to 3 days. For more than 3 days or for stock that is expected to begin growth before planting, dig a V-shaped trench (heeling-in-bed) sufficiently deep and bury seedlings so that all roots are covered by soil. Pack the soil firmly and water thoroughly. During planting, keep plant material out of direct sun or covered to avoid drying. Be sure to keep roots moist. Additional requirements:
Site Preparation See VT Standard and Specification and Job Sheet 490 – Forest Site Preparation Remove weeds and grass prior to planting and keep out for at least two years.
Additional requirements or special site preparation instructions:
Planting Method (Refer to VT Standard and Specification 612) Hand Machine (circle and indicate amount) For container and bareroot stock, plant stock to a depth even with the root collar in holes deep and wide enough to fully extend the roots. Pack the soil firmly around each plant. Cuttings are inserted in moist soil with at least 2 to 3 buds showing above ground.
Plants will be established prior to May 30 unless containerized seedlings are used or plants will be watered.
Additional requirements or special planting instructions/arrangements:
Cultural Practices (Refer to VT Standard and Specification 612 for specific requirements)
Pest Management is required. Weed control is necessary, either by mechanical cutting, herbiciding or mulching for at least 2 years after planting.
Vegetation Mat-Size # Tree Shelter-Size #
Mulch- coverage # Other:
Additional requirements:
Operation and Maintenance The planted area must be inspected periodically and protected from damage so proper function is maintained. Replace dead or dying tree/shrub stock to provide adequate plant densities as described in the 612 standard and continue control of competing vegetation to allow proper establishment for at least 2 years. Periodic harvesting of trees and shrubs may be necessary to maintain the health and vigor of mature stands. Keep large dead and dying trees for cavity nesting birds and a source of large wood in aquatic habitats. Additional requirements:
Questions regarding the planting or maintenance of the tree/shrub establishment should be directed to , at .
If needed, an aerial view or a side view of the practice can be shown below. Other relevant information, complementary practices and measures, and additional specifications may be included.
Recommendation: Import digital photographs to indicate practice before and after effects. For instructions regarding importing graphics to this doc go to: ftp://ftp-fc.sc.egov.usda.gov/VT/Technical/Help/Adobe_PDF_Help_1.pdf
Scale 1"=________ ft. (NA indicates sketch not to scale: grid size=1/2" by 1/2")
Additional Specifications and Notes:
The United States Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication program information (Braille, large print, audiotape, etc.) should contact the USDA Office of Communications (202) 720-2791.
To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice or TDD). USDA is an equal opportunity provider and employer.
T
Purpose (check all that apply)
Forest Products
Reduction of Air Pollution
Wildlife Habitat
Sequestration of carbon
Long-term erosion control
Energy Conservation
Improvement of Water Quality
Maintain or restore natural genetic diversity
Waste Treatment
Aesthetic enhancement
Other: (Specify)
Temporary Storage Instructions (Refer to VT Standard and Spe
Planting stock that is dormant may be stored temporarily in
Site Preparation See VT Standard and Specification and Job S
Planting Method (Refer to VT Standard and Specification 612)
For container and bareroot stock, plant stock to a depth eve
Cultural Practices (Refer to VT Standard and Specification 6
Pest Management is required. Weed control is necessary, eith
Vegetation Mat-Size #
Mulch- coverage #
Operation and Maintenance
Text2:
Text4:
Text5: Joe Bondi
Text6:
Text7: 6/11/2020
Text8:
Check Box2: Off
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Yes
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box1: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box12: Yes
Check Box18: Off
Text11:
Combo Box15: [Bare Root]
Combo Box16: [Bare Root]
Combo Box17: [Bare Root]
Combo Box18: [Bare Root]
Combo Box19: [ ]
Combo Box20: [ ]
Combo Box14: [ ]
Combo Box22: [Bare Root]
Combo Box23: [Bare Root]
Combo Box24: [Bare Root]
Combo Box25: [Bare Root]
Combo Box21: [Bare Root]
Combo Box26: [ ]
Text9:
Text10:
Text12:
Text13:
Text14:
Text18: 18
Text19: 900
Text20: 50
Text21: Before May 30
Text22: 15
Text23: 15
Text15:
Text16:
Text17:
Text24:
Text25: 18
Text26: 900
Text27: 50
Text28: Before May 30
Text29: 15
Text30: 15
Text34: 50
Text35: Before May 30
Text36: 15
Text37: 15
Text38:
Text39: 18
Text41: 50
Text42: Before May 30
Text43: 15
Text44: 15
Text53:
Text45:
Text72: 8
Text46:
Text47:
Text48:
Text49:
Text50:
Text51:
Text58:
Text56:
Text57:
Text65: 8
Text63: Before May 30
Text64: 8
Text66:
Text70: Before May 30
Text71: 8
Text73:
Text75: 340
Text76: 20
Text77: Before May 30
Text78: 8
Text79: 8
Text80:
Text81: 17
Text82: 510
Text83: 30
Text84: Before May 30
Text85: 8
Text86: 8
Text91: Before May 30
Text92: 8
Text93: 8
Text94:
Text98:
Text99:
Text100:
Text101:
Text102:
Text1: VT Fish & Wildlife Department
Text3: Pomainville WRE
Text31:
Text32: 18
Text40: 900
Text33: 900
Text67: 17
Text74: 17
Text87:
Text52:
Text59:
Text95:
Text88: 17
Text60: 17
Text96:
Text89: 850
Text68: 850
Text54:
Text97:
Text90: 50
Text69: 50
Text55:
Text103: Tree should be 3-4 feet. Shrubs should be 2-3 feet.
Text104:
Text105:
Text106:
Text107:
Text108:
Text109:
Text110:
Text111:
Text112:
Text113:
Text114:
Text115:
Text116:
Text61: 850
Text62: 50
Button1:
Button2:
Combo Box1: [ TREES]
Combo Box2: [Silver Maple (Acer saccharinum)]
Combo Box3: [Black Willow (Salix nigra)]
Combo Box4: [American Sycamore (Platanus occidentalis)]
Combo Box5: [American Elm (Ulmus americana)]
Combo Box6: [ ]
Combo Box7: [ SHRUBS]
Combo Box8: [Native Shrub Willow (Salix spp.)]
Combo Box9: [Gray Dogwood (Cornus racemosa)]
Combo Box10: [Arrowwood (Viburnum dentatum)]
Combo Box11: [Speckled Alder (Alnus incana rugosa)]
Combo Box12: [Buttonbush (Cephalanthus occidentalis)]
Combo Box13: [ ] wildlife habitat, long-term erosion control and improvement of water quality, treat waste, reduction of air pollution, sequestration of carbon, energy shrub establishment shall be controlled to protect new plants and minimize erosion, compaction and other
Noxious weeds will be controlled.Replanting will be conditions and suitable for the planned purpose(s).
Priority will be given to plant materials grown from locally collected seeds.
No plants on the Federal or state noxious or invasive weeds list shall be planted.
Planting or seeding rates will be adequate to accomplish the planned purpose for the site.
Planting dates, and care in handling and planting of the seed, cuttings or seedlings will ensure that planted materials have an acceptable rate of survival.
Bare-root stock shall be planted during the dormant season in the spring after the ground thaws until May 30 as soil moisture and local weather conditions permit.
Only viable, high-quality and adapted planting stock or seed will be used.
A precondition for tree/shrub establishment is appropriately prepared sites. Refer to practice standard Tree/Shrub Site Preparation (490).
Adequate seed sources or advanced reproduction
Woody Plant Materials Information - Refer to 612 Specification for more information on care, handling, planting techniques, etc.
See VT NRCS Forestry Technical Note 2 - Vermont Trees and Shrubs for Conservation for plant characteristics.
Planting stock that is dormant may be stored temporarily in a cooler or cool, moist, darkened area up to 3 days. For more than 3 days or for stock that is expected to begin growth before planting, dig a V-shaped trench (heeling-in-bed) sufficiently deep and bury seedlings so that all roots are covered by soil. Pack the soil firmly and water thoroughly. During planting, keep plant material out of direct sun or covered to avoid drying. Be sure to keep roots moist. Additional requirements:
Planting Method (Refer to VT Standard and Specification 612) Hand Machine (circle and indicate amount) For container and bareroot stock, plant stock to a depth even with the root collar in holes deep and wide enough to fully extend the roots. Pack the soil firmly around each plant. Cuttings are inserted in moist soil with at least 2 to 3 buds showing above ground.
Plants will be established prior to May 30 unless containerized seedlings are used or plants will be watered.
Pest Management is required. Weed control is necessary, either by mechanical cutting, herbiciding or mulching for at least 2 years
The planted area must be inspected periodically and protected from damage so proper function is maintained. Replace dead or dying tree/shrub stock to provide adequate plant densities as described in the 612 standard and continue control of competing vegetation to allow proper establishment for at least 2 years. Periodic harvesting of trees and shrubs may be necessary to maintain the health and vigor of mature stands. Keep large dead and dying trees for cavity nesting birds and a source of large wood in
Questions regarding the planting or maintenance of the tree/shrub establishment should be directed to
If needed, an aerial view or a side view of the practice can be shown below. Other relevant information, complementary practices and measures, and additional specifications may be included.
Recommendation: Import digital photographs to indicate practice before and after effects. For instructions regarding importing
The United States Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication program information (Braille, To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice or TDD). USDA is an equal opportunity
T
Purpose (check all that apply)
Forest Products
Reduction of Air Pollution
Wildlife Habitat
Sequestration of carbon
Long-term erosion control
Energy Conservation
Improvement of Water Quality
Maintain or restore natural genetic diversity
Waste Treatment
Aesthetic enhancement
Other: (Specify)
Temporary Storage Instructions (Refer to VT Standard and Spe
Planting stock that is dormant may be stored temporarily in
Site Preparation See VT Standard and Specification and Job S
Planting Method (Refer to VT Standard and Specification 612)
For container and bareroot stock, plant stock to a depth eve
Cultural Practices (Refer to VT Standard and Specification 6
Pest Management is required. Weed control is necessary, eith
Vegetation Mat-Size #
Mulch- coverage #
Operation and Maintenance
Text2:
Text4:
Text5: Joe Bondi
Text6:
Text7: 2/6/2018
Text8:
Check Box2: Off
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Yes
Check Box8: Yes
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box1: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box12: Yes
Check Box18: Off
Text11:
Combo Box15: [Bare Root]
Combo Box16: [Bare Root]
Combo Box17: [Bare Root]
Combo Box18: [Bare Root]
Combo Box19: [ ]
Combo Box20: [ ]
Combo Box14: [ ]
Combo Box22: [ ]
Combo Box23: [ ]
Combo Box24: [ ]
Combo Box25: [ ]
Combo Box21: [ ]
Combo Box26: [ ]
Text9:
Text10:
Text12:
Text13:
Text14:
Text18: 3
Text19: 225
Text20: 75
Text21: Before May 30
Text22: 15
Text23: 15
Text15:
Text16:
Text17:
Text24:
Text25: 3
Text26: 30
Text27: 10
Text28: Before May 30
Text29: 15
Text30: 15
Text34: 100
Text35: Before May 30
Text36: 15
Text37: 15
Text38:
Text39: 3
Text41: 15
Text42: Before May 30
Text43: 15
Text44: 15
Text53:
Text45:
Text72:
Text46:
Text47:
Text48:
Text49:
Text50:
Text51:
Text58:
Text56:
Text57:
Text65:
Text63:
Text64:
Text66:
Text70:
Text71:
Text73:
Text75:
Text76:
Text77:
Text78:
Text79:
Text80:
Text81:
Text82:
Text83:
Text84:
Text85:
Text86:
Text91:
Text92:
Text93:
Text94:
Text98:
Text99:
Text100:
Text101:
Text102: Reed canary grass control is planned for the year prior to planting. Two years of follow-up spot treatment around planted trees and shurbs are planned.
Text1: Dan Adams
Text3: Adams WRE
Text31:
Text32: 3
Text40: 45
Text33: 300
Text67:
Text74:
Text87:
Text52:
Text59:
Text95:
Text88:
Text60:
Text96:
Text89:
Text68:
Text54:
Text97:
Text90:
Text69:
Text55:
Text103: Trees should be a minimum of 3-4 feet tall.
Text104:
Text105:
Text106:
Text107:
Text108:
Text109:
Text110:
Text111:
Text112:
Text113:
Text114:
Text115:
Text116:
Text61:
Text62:
Button1:
Button2:
Combo Box1: [ ]
Combo Box2: [Silver Maple (Acer saccharinum) (3-4ft tall)]
Combo Box3: [Red-osier Dogwood (Cornus sericea)]
Combo Box4: [Black Willow (Salix nigra) (3-4ft tall)]
Combo Box5: [Green Ash (Fraxinus pennsylvanica) (3-4ft tall)]
Combo Box6: [ ]
Combo Box7: [ ]
Combo Box8: [ ]
Combo Box9: [ ]
Combo Box10: [ ]
Combo Box11: [ ]
Combo Box12: [ ]
Combo Box13: [ ] wildlife habitat, long-term erosion control and improvement of water quality, treat waste, reduction of air pollution, sequestration of carbon, energy shrub establishment shall be controlled to protect new plants and minimize erosion, compaction and other
Noxious weeds will be controlled.Replanting will be conditions and suitable for the planned purpose(s).
Priority will be given to plant materials grown from locally collected seeds.
No plants on the Federal or state noxious or invasive weeds list shall be planted.
Planting or seeding rates will be adequate to accomplish the planned purpose for the site.
Planting dates, and care in handling and planting of the seed, cuttings or seedlings will ensure that planted materials have an acceptable rate of survival.
Bare-root stock shall be planted during the dormant season in the spring after the ground thaws until May 30 as soil moisture and local weather conditions permit.
Only viable, high-quality and adapted planting stock or seed will be used.
A precondition for tree/shrub establishment is appropriately prepared sites. Refer to practice standard Tree/Shrub Site Preparation (490).
Adequate seed sources or advanced reproduction
Woody Plant Materials Information - Refer to 612 Specification for more information on care, handling, planting techniques, etc.
See VT NRCS Forestry Technical Note 2 - Vermont Trees and Shrubs for Conservation for plant characteristics.
Planting stock that is dormant may be stored temporarily in a cooler or cool, moist, darkened area up to 3 days. For more than 3 days or for stock that is expected to begin growth before planting, dig a V-shaped trench (heeling-in-bed) sufficiently deep and bury seedlings so that all roots are covered by soil. Pack the soil firmly and water thoroughly. During planting, keep plant material out of direct sun or covered to avoid drying. Be sure to keep roots moist. Additional requirements:
Planting Method (Refer to VT Standard and Specification 612) Hand Machine (circle and indicate amount) For container and bareroot stock, plant stock to a depth even with the root collar in holes deep and wide enough to fully extend the roots. Pack the soil firmly around each plant. Cuttings are inserted in moist soil with at least 2 to 3 buds showing above ground.
Plants will be established prior to May 30 unless containerized seedlings are used or plants will be watered.
Pest Management is required. Weed control is necessary, either by mechanical cutting, herbiciding or mulching for at least 2 years
The planted area must be inspected periodically and protected from damage so proper function is maintained. Replace dead or dying tree/shrub stock to provide adequate plant densities as described in the 612 standard and continue control of competing vegetation to allow proper establishment for at least 2 years. Periodic harvesting of trees and shrubs may be necessary to maintain the health and vigor of mature stands. Keep large dead and dying trees for cavity nesting birds and a source of large wood in
Questions regarding the planting or maintenance of the tree/shrub establishment should be directed to
If needed, an aerial view or a side view of the practice can be shown below. Other relevant information, complementary practices and measures, and additional specifications may be included.
Recommendation: Import digital photographs to indicate practice before and after effects. For instructions regarding importing
The United States Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication program information (Braille, To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice or TDD). USDA is an equal opportunity
T
Purpose (check all that apply)
Forest Products
Reduction of Air Pollution
Wildlife Habitat
Sequestration of carbon
Long-term erosion control
Energy Conservation
Improvement of Water Quality
Maintain or restore natural genetic diversity
Waste Treatment
Aesthetic enhancement
Other: (Specify)
Temporary Storage Instructions (Refer to VT Standard and Spe
Planting stock that is dormant may be stored temporarily in
Site Preparation See VT Standard and Specification and Job S
Planting Method (Refer to VT Standard and Specification 612)
For container and bareroot stock, plant stock to a depth eve
Cultural Practices (Refer to VT Standard and Specification 6
Pest Management is required. Weed control is necessary, eith
Vegetation Mat-Size #
Mulch- coverage #
Operation and Maintenance
Text2:
Text4:
Text5: Joe Bondi
Text6:
Text7:
Text8:
Check Box2: Off
Check Box3: Yes
Check Box4: Yes
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Yes
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box1: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box12: Yes
Check Box18: Off
Text11:
Combo Box15: [Bare Root]
Combo Box16: [Bare Root]
Combo Box17: [Bare Root]
Combo Box18: [Bare Root]
Combo Box19: [ ]
Combo Box20: [Bare Root]
Combo Box14: [ ]
Combo Box22: [Bare Root]
Combo Box23: [Bare Root]
Combo Box24: [Bare Root]
Combo Box25: [ ]
Combo Box21: [Bare Root]
Combo Box26: [ ]
Text9:
Text10:
Text12:
Text13:
Text14:
Text18: 17
Text19: 510
Text20: 30
Text21: Before May 30
Text22: 15
Text23: 15
Text15:
Text16:
Text17:
Text24:
Text25: 17
Text26: 510
Text27: 30
Text28: Before May 30
Text29: 15
Text30: 15
Text34: 30
Text35: Before May 30
Text36: 15
Text37: 15
Text38:
Text39: 17
Text41: 25
Text42: Before May 30
Text43: 15
Text44: 15
Text53: 17
Text45:
Text72: 8
Text46:
Text47:
Text48:
Text49:
Text50:
Text51:
Text58: 8
Text56: Before May 30
Text57: 8
Text65: 8
Text63: Before May 30
Text64: 8
Text66:
Text70: Before May 30
Text71: 8
Text73:
Text75: 340
Text76: 20
Text77: Before May 30
Text78: 8
Text79: 8
Text80:
Text81: 17
Text82: 425
Text83: 25
Text84: Before May 30
Text85: 8
Text86: 8
Text91:
Text92:
Text93:
Text94:
Text98:
Text99:
Text100:
Text101:
Text102: Reed canary grass control is planned for some areas the year prior to planting. Two years of follow-up spot treatment around planted trees and shurbs are planned.
Text1: Robert Forrest
Text3:
Text31:
Text32: 17
Text40: 425
Text33: 510
Text67: 17
Text74: 17
Text87:
Text52:
Text59:
Text95:
Text88:
Text60: 17
Text96:
Text89:
Text68: 170
Text54: 340
Text97:
Text90:
Text69: 10
Text55: 20
Text103: Trees should be a minimum of 3-4 feet tall. Shrubs should be a minimum of 2-3 feet tall.
Text104:
Text105:
Text106:
Text107:
Text108:
Text109:
Text110:
Text111:
Text112:
Text113:
Text114:
Text115:
Text116:
Text61: 170
Text62: 10
Button1:
Button2:
Combo Box1: [ DECIDUOUS - TREES]
Combo Box2: [Silver Maple (Acer saccharinum) (3-4ft tall)]
Combo Box3: [American Elm (Ulmus americana) (3-4ft tall)]
Combo Box4: [Black Willow (Salix nigra) (3-4ft tall)]
Combo Box5: [American Sycamore (Platanus occidentalis)]
Combo Box6: [ SHRUBS]
Combo Box7: [Red-osier Dogwood (Cornus sericea) (2-3 ft tall)]
Combo Box8: [Winterberry (Ilex verticillata) (2-3ft tall)]
Combo Box9: [Arrowwood (Viburnum dentatum) (2-3ft tall)]
Combo Box10: [Speckled Alder (Alnus incana rugosa)]
Combo Box11: [Buttonbush (Cephalanthus occidentalis)]
Combo Box12: [ ]
Combo Box13: [ ]
File details come from the government source that posted it. Updated .